Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.3 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.4 L+₹6,825.05 (2.92%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.5 L+₹11,156.34 (4.77%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L3₹2.5 L+₹11,156.34 (4.77%)Admitted-Finance | L3 | Admitted-Finance | ||
| 5 | L4₹2.7 L+₹35,700.30 (15.3%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹4.4 L
EMD Value
₹8,740
Closing Date
7 Aug 2026, 4:00 pmClosed
XEN REW Kathua
XEN REW Kathua
Reconstruction of old road Pandori to Tamni Panchayat Pandori Block nagri
2026_RDPR_318048_9
e-NIT No.144/REW/K of 2026-27 Dated 27/07/2026 2nd call
Open Tender
Civil Works
Percentage
90 days
Nagri
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹8,740
19 Aug 2026
27 Jul 2026
8 Aug 2026
27 Jul 2026
7 Aug 2026
27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil. Allow 60 % | 301.12 | Sqm | 24.12 | ₹7,263.01 |
| 2 | Providing and Laying inclusive of all complete 53mm to 22.4 mm | 37.62 | Cum | 1,450 | ₹54,549 |
| 3 | Providing and Laying inclusive of all complete Screening of size 11.2 mm Qty Vide Item No.1(a) @ 15% | 5.64 | Cum | 1,450 | ₹8,178 |
| 4 | Providing and Laying inclusive of all complete Stone Dust Qty vide Item 1(b) @ 8% | 3.01 | Cum | 1,450 | ₹4,364.5 |
| 5 | Providing and Laying of River Bed Material (R.B.M)/ Nallah bed Material (N.B.M) including spreading, consolidation complete in all respect including Loading, unloading and carriage complete ( to be quoted by Contractor ) | 76.47 | cum | 425 | ₹32,499.75 |
| 6 | Earth work in excavation by Mechanical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: in all kinds of | 58.06 | Cum | 256.85 | ₹14,912.71 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement :4 coarse sand : 10 graded stone aggregate 40 mm nominal size) . | 9.58 | cum | 4,826.5 | ₹46,237.87 |
| 8 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement :3 coarse sand : 10 graded stone aggregate 20 mm nominal size) | 30.4 | cum | 5,733.6 | ₹1,74,301.44 |
| 9 | Supply and placing of 30% stone Boulders | 13.28 | cum | 937.9 | ₹12,455.31 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 209.57 | Sqm | 286 | ₹59,937.02 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.99 MB
BOQ_1045725.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .