| 1.00Construction of Boys Toilet @ Arasanagaripattinam PUM School in Ponnamangalam Panchayat | |||||
| 2.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 15.77 | Cum | 350 ₹5,519.50 | 263.78 ₹4,159.81 |
| 3.00 | Plain Cement concrete 1:4:8 mix using 40mm ISS metal including all cost and conveyance of all materials to site and all labour charges etc complete. | 3.62 | Cum | 6,800 ₹24,616 | 6,281.78 ₹22,740.04 |
| 4.00 | Brick work CM 1:5 mix using good country bricks including cost and conveyance of all materials to site and all labour charges etc complete. | 22.94 | Cum | 6,800 ₹1.6 L | 6,493.3 ₹1.5 L |
| 5.00Supplying and errecting centering are strutting including necessary supports for place surface for RCC columns footing pedestal beam criticals pears etc.,using mild steel angles of sizes 90 x 90 x 10 cm gauge stifness welded mild steel of sizes 25 x 25 x 3 cm for boarding laying over silver oak joists of single 10cm - 6.5cm space of 75cm ceter to center | |||||
| 6.00 | Below sill level | 4.43 | sqm | 750 ₹3,322.50 | 547.5 ₹2,425.43 |
| 7.00 | Above sill level | 16.55 | sqm | 1,095 ₹18,122.25 | 1,095 ₹18,122.25 |
| 8.00 | Providing and laying in position, standardised concrete Mix M-20 Grade in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials). | 3.7 | Cum | 10,212.34 ₹37,785.66 | 10,212.34 ₹37,785.66 |
| 9.00 | Supplying and Fabrication of steel for RCC works including all cost of cutting bending and tying of steels and kept ready for concrete in position etc., | 0.4 | mt | 95,000 ₹38,000 | 92,033.04 ₹36,813.22 |
| 10.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work | 20.65 | sqm | 450 ₹9,292.50 | 308 ₹6,360.20 |
Tender Value
₹6 L
EMD Value
₹6,000
Closing Date
11 Mar 2026, 3:00 pmClosed
Bdo,Avudaiyarkoil
Pt.union Office,Avudaiyarkoil
Construction of Boys Toilet at Arasanagaripattinam PUM School in Ponnamangalam Panchayat
2026_RDTN_670696_1
Avk/MLACDS/Work
Open Tender
Civil Works
Avudaiyarkoil
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹6,000
27 Mar 2026
5 Mar 2026
11 Mar 2026
5 Mar 2026
11 Mar 2026
5 Mar 2026
Construction of Boys Toilet @ Arasanagaripattinam PUM School in Ponnamangalam Panchayat
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Plain Cement concrete 1:4:8 mix using 40mm ISS metal including all cost and conveyance of all materials to site and all labour charges etc complete.
Brick work CM 1:5 mix using good country bricks including cost and conveyance of all materials to site and all labour charges etc complete.
Supplying and errecting centering are strutting including necessary supports for place surface for RCC columns footing pedestal beam criticals pears etc.,using mild steel angles of sizes 90 x 90 x 10 cm gauge stifness welded mild steel of sizes 25 x 25 x 3 cm for boarding laying over silver oak joists of single 10cm - 6.5cm space of 75cm ceter to center
Below sill level
Above sill level
Providing and laying in position, standardised concrete Mix M-20 Grade in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials).
Supplying and Fabrication of steel for RCC works including all cost of cutting bending and tying of steels and kept ready for concrete in position etc.,
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work
Plastering with cement 1:5-12mm thick including cost and conveyance of al materials to site and all labour charges etc complete.
Finishing the top of roof with Best quality vitrified tiles of size 600mm x 600mm x 8mm of approved colour, shade & quality laid in CM 1:3 20mm thick and pointed with white cement mixed same colour pigments etc., and 2% of water proffing compound by weight of cement complying with standard specification.
Paving the flooring with special type of flooring tiles (Cement based Hydraulically pressed Anti skid tiles (20mm thick) in CM 1:3, 20mm thick
Dadooing walls Plain Galzed tiles of size 150x150x6mm
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification.
Painting two coat with ready mixed plastic emulsion of first quality paint and of approved colour over a priming coat including thorogh scarpping clean removal of dirt etc., complete as per standard specification.
Cost and supply of IWC
Cost and supply of EWC
Cost and supply of Wood plastic Composit door Door D1 0.75 m x 1.80m
Cost and supply of Wood plastic Composit door Door SD 1.20 m x 1.80 m
Cost, Supply and fixing of Precast RCC Ring, including all cost and labour charges etc RCC Ring
Cost, Supply and fixing of Precast RCC Ring, including all cost and labour charges etc Round Slab
Sanitary arrangements
110 mm dia pvc pipe
110mm PVC Door Bend
110mm PVC TEE
1000 lit HDPE tank
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 1 & 27 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
Avk_doc.pdf
Tender Documents • 0.18 MB
BOQ_806002.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid