| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹187.3 CrAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹196.3 Cr+₹9.0 Cr (4.81%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | N.P PATEL & CO L2 | KEVADIYA CONSTRUCTION PVT LTD L1 |
|---|---|---|---|---|---|
| 1.01 | Schedule - 1 - Collection System
Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size of boulders as directed by Departmental engineer.
0 to 2m depth | 3,38,087.6 | M³ | 150 ₹5,07,13,140 Lowest | 150 ₹5,07,13,140 Lowest |
| 2.01 | Earthwork excavation and depositing on bank with initial lead of 10m and initial lift of 2m in Soft Disintegrated Rock, laterite, soft rock or kankar, not required blasting as directed by Departmental engineer.
2 to 3m depth | 41,533.2 | M³ | 250 ₹1,03,83,300 | 225 ₹93,44,970 Lowest |
| 3.01 | 3 to 4m depth | 13,100.3 | M³ | 500 ₹65,50,150 Lowest | 900 ₹1,17,90,270 |
| 4.01 | 4 to 5m depth | 2,623.2 | M³ | 750 ₹19,67,400 Lowest | 1,000 ₹26,23,200 |
| 5.01 | Providing shoring and strutting with sheet piles/wooden piles & planks, with necessary support for excavation beyond the depth of 2m, including the cost of sheet piles, wooden piles, plank & other materials, removing shoring and strutting after the pipes are laid etc. complete for 2 above as directed by the Engineer in charge.
0 to 2.0m depth | 1,96,476 | M² | 50 ₹98,23,800 | 10 ₹19,64,760 Lowest |
| 6.01 | Laying of Double Wall Corrugated High Density Poly Ethylene Pipes to proper grade and alignment, cutting the pipes true to axis to the required alignment and slope as indicated in drawing/design and hydraulically testing the pipe to the required pressure as directed by the departmental engineer including Labour charge etc,. complete as per specifications at different depths.
200 mm Dia Up to 2m | 1,54,413 | RM | 75 ₹1,15,80,975 | 50 ₹77,20,650 Lowest |
| 7.01 | 200mm Dia 2m to 4m | 36,872 | RM | 75 ₹27,65,400 | 50 ₹18,43,600 Lowest |
| 8.01 | 200 mm Dia 4m to 6m | 1,790 | RM | 75 ₹1,34,250 | 50 ₹89,500 Lowest |
| 9.01 | 250 mm Dia Up to 2m | 2,302 | RM | 100 ₹2,30,200 Lowest | 200 ₹4,60,400 |
| 10.01 | 250mm Dia 2m to 4m | 2,541 | RM | 100 ₹2,54,100 Lowest | 200 ₹5,08,200 |
Tender Value
₹163.8 Cr
EMD Value
₹1.6 Cr
Closing Date
31 Jul 2024, 3:30 pmClosed
Commissioner Madurai Corporation
Aringar Anna Maligai
CONSTRUCTION AND OPERATION AND MAINTENANCE FOR 5 YEARS OF UNDERGROUND SEWERAGE SYSTEM TO LEFTOUT AREAS AND ADDED AREAS OF NORTH VAIGAI IN MADURAI CITY MUNICIPAL CORPORATION
2024_MAWS_454446_1
E1/Est. AMRUT (2.0) Package-1/002090/23-24 (2ND CALL)
Open Tender
Civil Works
Lump-sum
60 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.6 Cr
4 Nov 2025
14 Jun 2024
31 Jul 2024
14 Jun 2024
31 Jul 2024
14 Jun 2024
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
146229761.pdf
Tender Documents • 1.14 MB
146229762.html
Tender Documents • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .