| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-AOC | ₹8.4 L Quoted ₹7.1 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹7.2 L+₹6,774.36 (0.95%)Rejected-Finance | ₹7.2 L+₹6,774.36 (0.95%) | L2 | Rejected-Finance Rejected |
Tender Value
₹6.8 L
EMD Value
₹6,800
Closing Date
8 May 2026, 3:00 pmClosed
Executive Engineer (Central Tender Cell)
Central Tender Cell, BMC, ICOMC Tower
Renovation and Minor Repair Works of Wellness Centre at Sabar Sahi in Ward No. 45
2026_ORULB_128484_6
BMC-EE-Tender Cell-09/2026-27 dt. 24.04.2026
Open Tender
Civil Works - Others
Percentage
60 days
BMC, AREA
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
₹6,800
Yes
UG floor,Office Chamber of EE Central Tender Cell
17 Aug 2026
28 Apr 2026
8 May 2026
28 Apr 2026
8 May 2026
28 Apr 2026
28 Apr 2026 - 4 May 2026
4 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing fifting and fixing up partition walling OEL aluminum anodized section No.9210 and 9207 as single groove and double groove respectively as horizontal and vertical member and OEL section 4660 AS Tapered clip for fixing up 12mm thick pre laminated board (Nova pan Make) and jointing angle No. 1855 etc.as per direction of Engineer-in-charge. | 112.4 | sqm | 3,406.43 | ₹3,82,882.73 |
| 2 | Providing fifting and fixing of Al. door with anodized Al. door section No.9202 as vertical member, 9201 as top member and 9200 as bottom and middle member with frame section as 9221 and 12mm thick pre-laminated board fixed on door frame by means of tapered clip No. 4660 and the frame to be completed by meand of jointing angle No. 1855 including all cost of labour, T&p, hire charges of drilling machine, labour charges etc.complete. | 6.06 | sqm | 6,657.08 | ₹40,335.25 |
| 3 | Providing fitting and fixing of false celling with Aluminium anodised T Section No. 3215 with 2'-0" center to center, L section N0.1705 upto 15 micron on 4 walls to be fixied by means of steel screw & P.V.C plug & the Aluminium grid 2'-0"x2'-0" with prelaminated board. Date for 14'-6" x 14'-6" = 210.25 Sft or 19.53 Sqm | 59.01 | sqm | 1,356.93 | ₹80,069.07 |
| 4 | First class Fly Ash brick work in cement mortar (1:6) Superstructure with best quality bricks having crushing strength from 75kg/cm2 to 99kg/cm2, immersing the bricks in water for not less than 6 hours before use (the bricks shall be well burnt, free from cracks, well shaped, uniform in size and shall produce a clear metallic ringing sound when struck) includes moulding, chamfering, corbelling etc. complete as per drawing, design and specification, watering and curing for 7 days including cost, conveyance, royalty and taxes of all materials, labour, T&P etc. and as per direction of Engineer-in-charge. | 1.62 | cum | 5,511.52 | ₹8,928.66 |
| 5 | C.C. work of M20 grade with 20 mm down grade chips (C.B.) including centring & shurtering for RCC work only (Data for 15 cum) | 0.54 | Cum | 6,256.63 | ₹3,378.58 |
| 6 | Straightening , cutting , bending and binding , welding and jointing (if necessary)coiled / bent up MS rods /tor steel/ deformed rods etc. including hoisting , placing in position , tying the grills binding with 18 to 20 guge binding wire required for RCC work including cost, conveyance, taxes of all materiala, cost of all labour , T&P etc. as requrired for the work complete (Weight of binding wires will not be consider) as directed by engineer-in- charge.(Payment wii be made on actual weight of MS rods or tor steel liner measerments of rod for finiseditem of works 5 %n wastage and lap length are included in the finished rate | 0.31 | qtl | 9,389.58 | ₹2,913.33 |
| 7 | Rigid smooth centering and shuttering for RCC or CC work including false works, supplying of centering materials, its hire charges, cost of labour T & P and dismentalling after casting the concrete etc all complete as per direction of E-I-C | 5.82 | Cum | 250.28 | ₹1,456.63 |
| 8 | Fitting Fixing of Granite | 5.46 | Cum | 1,362.47 | ₹7,439.09 |
| 9 | 12mm thick C.P. in C.M.(1:4) over Brick Masonery works including closed deep chipping & slurry treatment including watering, curing, cost, carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of E.I.C. | 10.8 | Sqm | 199.36 | ₹2,153.09 |
| 10 | Earth work excavation in Hard soil using one cum Bucket Hydraluc Excavator with all leads and lifts and transpotation of ecavated matiral by mechcanical means. and direction of Engg -in- charge | 10.27 | cum | 230.74 | ₹2,370.51 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_588797.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
DTCN_9.pdf
Tender Documents • 0.91 MB
BOQ_588797.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .