Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹3,420
Closing Date
7 Oct 2026, 9:00 amClosed
E.E. Shimla Urban DIVISION, HPPWD, Shimla-3
E.E. Shimla Urban DIVISION, HPPWD, Shimla-3
Restoration of rain damages of Various residential buildings under Division no III, Shimla SH Construction of PCC Retaining Wall at House No. 1 in Brock Hurst Section Shimla 2.
2026_PWD_144694_1
SD-III-11413-26dt.25-09-2026
Open Tender
Civil Works - Buildings
Percentage
30 days
Brock Hurst
As per SBD
10 documents required · 10 mandatory
₹350
₹3,420
14 Oct 2026
29 Sept 2026
7 Oct 2026
29 Sept 2026
7 Oct 2026
29 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation (cutting) by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth upto all leads and lift , as directed by Engineer-in-charge.All kinds of soil. | 2.25 | Per Cubic metre. | 212 | ₹477 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kind of soils. | 27 | Per Cubic metre. | 212 | ₹5,724 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 Cement : 5 coarse sand) : 10 graded stone aggregate 40mm nominal size) including carriage of materials in all leads and lifts | 14.85 | Per Cubic metre. | 2,924 | ₹43,421.4 |
| 4 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 1:3:6 (1 cement : 3 coarse sand) : 6 graded stone aggregate 20 mm nominal size) | 20.25 | Per Cubic metre. | 4,661 | ₹94,385.25 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for :Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 24.75 | Per square metre. | 229 | ₹5,667.75 |
| 6 | Backfilling behind abutment, wing wall and return wall complete as per drawings and technical specification Clause 1204.3.8 in Granular materials including carriage of materials within all leads and lifts. | 6.75 | Per Cubic metre. | 975 | ₹6,581.25 |
| 7 | Providing weap holes in Brick Masonary/Stone masonary,plain/reinforced concrete abutment,wing wall with 110mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete. | 13.5 | Per running metre. | 127 | ₹1,714.5 |
| 8 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50m initial lead, for all leads including all lifts involved complete including carriage of materials within all leads and lifts. | 20.25 | Per Cubic metre. | 636 | ₹12,879 |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.27 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.02 MB
SBD170850.pdf
Tender Documents • 5.06 MB
BOQ_215217.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .