| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.7 LAccepted-AOC | ₹24.7 L | L1 | Accepted-AOC Admitted |
| 2 | L2₹24.7 LRejected-AOC KULLANDI STREET M PALLIPATTI POST METTUR TALUK SALEM DISTRICT 636 458 | METTUR | SALEM | TAMIL NADU | 636458 | ₹24.7 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | T.THIRUPATHI L1 | C.Periyasamy L2 |
|---|---|---|---|---|---|
| 1.001.Construction of Under Ground Drainage at MC Palli from Exsiting Drainage to Thoddaneri Kalvai | |||||
| 2.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 1,199.56 | Cum | 263.6 ₹3,16,204.02 | 264.31 ₹3,17,055.7 |
| 3.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 7.86 | Cum | 5,325.17 ₹41,855.84 | 5,339.56 ₹41,968.94 |
| 4.00 | Brick work in Cement mortar 1:5 mix using country brick of size 84/4'' x 41/4''x 23/4'' cm including cost and conveyance and all labour charges etc., | 60.71 | Cum | 6,146.33 ₹3,73,143.69 | 6,162.94 ₹3,74,152.09 |
| 5.00Suppy and Delivry of 600 mm RCC hume pipes & specials for sevage water disposed including all cost and labour charges etc., complete | |||||
| 6.00 | 600mm RCC Pipe | 395.8 | Sqm | 2,151.19 ₹8,51,441 | 2,157.01 ₹8,53,744.56 |
| 7.00 | 600mm RCC coller | 182 | Sqm | 977.75 ₹1,77,950.5 | 980.39 ₹1,78,430.98 |
| 8.00 | provision for laying and jointing of 600 mm RCC Pipes & Specials including all cost and labour charges etc., complete | 395.8 | Sqm | 193.95 ₹76,765.41 | 194.48 ₹76,975.18 |
| 9.00 | Plastering with CM 1:5 mix to 12 mm thick including cost and conveyance and all labour charges etc., | 242.83 | Sqm | 282.06 ₹68,492.63 | 282.82 ₹68,677.18 |
| 10.00 | Supply and fabrication and placing in positin MS Steel or Ribbed tor Steel for all RCC works as per the design given including cost of steel and binding wire in all floors etc., complete complying with stanadred specification | 0.55 | Mt | 91,794.2 ₹50,211.43 | 92,042.22 ₹50,347.09 |
Tender Value
₹25 L
EMD Value
₹25,000
Closing Date
26 Nov 2025, 3:00 pmClosed
The Block Development Officer Krishnagiri
The Block Development Office Krishnagiri
Krishnagiri DT Krishnagiri Block MC Palli Panchayat Under SFC 2025-2026 Construction of Under Ground Drainage at MC Palli from Exsiting Drainage to Thoddaneri Kalvai Package No 2025-2026 KGI 25
2025_RDTN_624886_1
Roc_97_2025_DPSNo_1_1_04_11_25
Open Tender
Civil Works - Others
90 days
Krishnagiri
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹25,000
The Block Development Office Krishnagiri
12 Jan 2026
20 Nov 2025
26 Nov 2025
20 Nov 2025
26 Nov 2025
20 Nov 2025
24 Nov 2025
Amount
1.Construction of Under Ground Drainage at MC Palli from Exsiting Drainage to Thoddaneri Kalvai
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Brick work in Cement mortar 1:5 mix using country brick of size 84/4'' x 41/4''x 23/4'' cm including cost and conveyance and all labour charges etc.,
Suppy and Delivry of 600 mm RCC hume pipes & specials for sevage water disposed including all cost and labour charges etc., complete
600mm RCC Pipe
600mm RCC coller
provision for laying and jointing of 600 mm RCC Pipes & Specials including all cost and labour charges etc., complete
Plastering with CM 1:5 mix to 12 mm thick including cost and conveyance and all labour charges etc.,
Supply and fabrication and placing in positin MS Steel or Ribbed tor Steel for all RCC works as per the design given including cost of steel and binding wire in all floors etc., complete complying with stanadred specification
Rein Forcement Cement concrete 1:1.5:3 Using 20mm ISS HBG metal for all RCC item of works Excluding cost of rein forcement and fabricating charges, centering and shuttering but including curing
Refilling the basemnent with excavated earth in layers of not more then 15cm thick well rammed, watering and consolidated complying with standred specifiactions etc., complete
Provision for PVC mould CI steps for chamber
Provision for writing Name Board
Provision for Photographics Charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
C.Periyasamy (BID ID -1520357)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.68 MB
TBKGI25.pdf
Tender Documents • 0.50 MB
PBKGI25.pdf
Tender Documents • 0.36 MB
BOQ_747239.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid