| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 CrAccepted-Finance AT BARIMAL PO HATIBARI PS SUKINDA DIST JAJPUR PIN 755018 | JAJAPUR | ODISHA | 755018 | ₹7.7 Cr | L1 | Accepted-Finance L1 bidder |
| 2 | L2₹7.8 Cr+₹11.8 L (1.54%)Accepted-Finance | ₹7.8 Cr+₹11.8 L (1.54%) | L2 | Accepted-Finance L2 bidder |
| 3 | L3₹7.9 Cr+₹25.0 L (3.26%)Rejected-Finance VILL KALMURA P O KESHIAKOLE DIST BANKURA PIN 722155 | KESHIAKOLE | BANKURA | WEST BENGAL | 722155 | ₹7.9 Cr+₹25.0 L (3.26%) | L3 | Rejected-Finance Other than L1 and L2 bidder |
| 4 | L4₹8.0 Cr+₹32.0 L (4.17%)Rejected-Finance BIRENDRA KUMAR NAYAK NEAR HERO SERVICE CENTER AT KELIA NAGAR PO P R PETTA DIST KORAPUT ODISHA PIN 764003 | KORAPUT | KORAPUT | ODISHA | 764003 | ₹8.0 Cr+₹32.0 L (4.17%) | L4 | Rejected-Finance Other than L1 and L2 bidder |
| 5 | L5₹8.2 Cr+₹52.3 L (6.82%)Rejected-Finance | ₹8.2 Cr+₹52.3 L (6.82%) | L5 | Rejected-Finance Other than L1 and L2 bidder |
Tender Value
₹10.1 Cr
EMD Value
₹10.1 L
Closing Date
18 Feb 2026, 5:30 pmClosed
Engineer-in-Chief (Civil), Roads-I, Odisha
O/o the E.I.C (Civil), Odisha, Nirman Soudha, New Building, Unit-V, Bhubaneswar
Improvement such as widening and strengthening of Kalamatia-Binjharpur road from 2/039 km to 8/778 km in the district of Jajpur under State Plan
2026_EICCL_125418_1
CE-Roads-I-20/2025-26
Open Tender
Civil Works - Roads
Percentage
300 days
Panikoili Division
4 documents required · 4 mandatory
₹10,000
₹10.1 L
Yes
27 Jul 2026
2 Feb 2026
19 Feb 2026
2 Feb 2026
18 Feb 2026
2 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Unit - Sqm
Clearing and grubbing road land including uprooting trees rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned upto a lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm in thickness as per Clause 201 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P etc complete and as per direction of Engineer-in-Charge. | 33,585 | sqm | 8.45 | ₹2,83,793.25 |
| 2 | Unit - Cum
Dismantling of Cement Concrete Grade M-15 & M-20 including T&P and scaffolding wherever necessary, sorting the dismantling materials, disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead upto 1000 mtr. as per Clause No.202 of MoRT&H specifications for Road and Bridge works (5th Revision) & including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. | 19.66 | cum | 650.1 | ₹12,780.97 |
| 3 | Unit - Cum
Earth work in excavation in all kinds of soil for road works with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers as per drawing and technical specification, including setting out, dressing of section to correct line, level, grade & camber for road work or dressing of sides and bottom for foundation of structures and loading into tippers, transporting to embankment site within all lifts and lead upto 1000mtr. and utilising the surplus earth locally for road work wherever required, backfilling the excavation earth to the extent required etc complete in all respect as per clause 301 & 304 of Specification for road & bridge work of MORT&H (5th Revision) & Direction of Engineer in charge. | 9,905.94 | cum | 74.79 | ₹7,40,865.25 |
| 4 | Unit - Sqm
Scarifying and removing the existing bituminous road surface to the required depth as per approved drawing and technical specifications and disposal of scarified materials within all lifts and lead upto 1000mtr. complete in all respect as per Section 900, Clause 305.4.3, 305.8, 305.9.5, 501.8.3.2, 501.8.7.2 and 501.8.8.1 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 36,943.5 | sqm | 6.03 | ₹2,22,769.31 |
| 5 | Unit - Cum
Loosening to a depth of 150mm, leveling and compacting original ground supporting embankment /sub-grade as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 305, 305.3.4 of MoRT&H Specification for Road & Bridge works (5th Revision) & including cost of all labour, T&P etc complete and as per direction of Engineer-in-Charge. | 2,015.1 | cum | 36.04 | ₹72,624.2 |
| 6 | Unit - Cum
Construction of embankment with approved materials deposited at site from road-way cutting and other structures with all lifts and leads graded and compacted to meet requirement as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 305 of MoRT&H Specification for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 7,924.75 | cum | 35.83 | ₹2,83,943.79 |
| 7 | Unit - Cum
Construction of embankment with approved materials obtained from borrow pits by mechanical means graded and compacted to meet requirement as per approved drawing and technical specifications complete in all respect as per Section 900 and clause 305 of MoRT&H Specification for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 46,114.27 | cum | 249.24 | ₹1,14,93,520.65 |
| 8 | Unit - Cum
Providing compacted shoulder with granular materials by using moorum & sand admixture (75%: 25%) of approved quality, watering and compacting with vibratory roller to achieve the required density in OMC complete in all respect as per approved drawing and technical specifications as per Section 900 and Clause 408 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 1,007.55 | cum | 2,424.78 | ₹24,43,087.09 |
| 9 | Unit - Sqm
Fine dressing and providing, laying turfing with live sods of perennial turf forming grass on embankment slope, verges or other locations including preparation of ground, fetching of sods with all lifts and leads upto 5 Km. and watering complete in all respect as per approved drawing and technical specifications as per Section 900 and Clause 307 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P etc complete and as per direction of Engineer-in-Charge. | 36,271.8 | sqm | 28.91 | ₹10,48,617.74 |
| 10 | Unit - Cum
Providing and laying Granular Sub-base with Grading-VI stone screening materials as per Table 400-1 as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 401 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 4,931.45 | cum | 3,167.36 | ₹1,56,19,677.47 |
stage.html
html • 0.08 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
Tendernotice_2.pdf
PDF • 0.49 MB
BOQ_578932.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .