Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹38.8 L
EMD Value
₹38,820
Closing Date
30 Oct 2026, 5:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Divisional Officer
RURAL WORKS DIVISION, SONEPUR
Construction of Boundary Wall and Gate of Govt. Ayurvedic Dispensary building campus at Atasingha in the district of Subarnapur.
2026_CERWI_143798_1
Tender Online SNPR-06 of 2026-27
Open Tender
Civil Works - Buildings
Percentage
180 days
Sonepur
2 documents required · 2 mandatory
₹6,000
₹38,820
Yes
16 Oct 2026
16 Oct 2026
31 Oct 2026
16 Oct 2026
30 Oct 2026
16 Oct 2026
16 Oct 2026 - 29 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches in hard soil including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site within 50m initial lead & 1.5m initial lift. complete as directed by the E.I.C.(As Per AR Page No.-1, Item No.-1) | 286.79 | cum | 282.9 | ₹81,132.89 |
| 2 | Supplying & filling of foundation with course sand well watered and rammed including cost, cost of all labour, carriage, royalty complete in all respect. (As Per A/R Page No-1, Item No-2) | 129.26 | cum | 580.9 | ₹75,087.13 |
| 3 | Cement Concrete (1:3:6) using 40mm size hard granite C.B. metal approved quality from approved quarry including cost, carriage, royalty, cost of all labour. etc complete and as directed by E.I.C. | 33.66 | cum | 5,826.5 | ₹1,96,119.99 |
| 4 | Cement Concrete (1:2:4) using 12mm size hard granite C.B. chips approved quality from approved quarry including cost, carriage, royalty, cost of all labour. etc complete and as directed by E.I.C. | 6 | cum | 7,392.8 | ₹44,356.8 |
| 5 | R.C.C. M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, centering shuttering etc complete but excluding cost of reinforcement. A)COLOUM BASE FOOTING | 43.12 | cum | 6,224.9 | ₹2,68,417.69 |
| 6 | B)COLUMN SUPER STRUCTURE | 23.81 | cum | 15,607.8 | ₹3,71,621.72 |
| 7 | C) PLINTH BAND | 19.67 | cum | 7,099.3 | ₹1,39,643.23 |
| 8 | D)TIE BEAM | 13.11 | cum | 15,607.8 | ₹2,04,618.26 |
| 9 | Straightening, cutting, bending bent up or coiled rods, including cranking, hooking, welding or jointing the M.S. rods or tor confirming to I.S. 432 (Plain) and 1785 (Tor) steel and binding, tying the grills, hoisting, lowering and placing in proper position required for R.C.C. works including cost, conveyance and taxes of M.S. rods or tor steel and binding wires of 18 to 20 gauge and cost of all labour etc.complete in all respect. | 131.62 | qtl | 9,577 | ₹12,60,524.74 |
| 10 | Brick work with Flyash Bricks 25cm x 12cm x 8cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) in Foundation and Plinth including watering curing, cost of carriage, royalty and taxes of all materials, cost of all labour, etc complete as per the direction of E.I.C. | 43.08 | cum | 5,578 | ₹2,40,300.24 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 3.03 MB
Tendernotice_1.pdf
PDF • 2.96 MB
BOQ_614488.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .