Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26,876Accepted-AOC | L1 | Accepted-AOC Tender Accepted | |
| 2 | L2₹27,000+₹1,500 (5.88%)Rejected-AOC | L2 | Rejected-AOC Tender Not Accepted |
Tender Value
Refer Docs
Closing Date
20 Nov 2024, 2:00 pmClosed
CE/TTPS
Chief Engineer Tuticorin Thermal Power Station-Tuticorin
TTPS ES Circle EM II Rewinding of failed various capacity of LT motors in boiler area for Sub Division I EM II Division
2024_EB_498894_1
CE/SE/ES /TTPS /No.264/2024-25
Open Tender
Electrical and Maintenance Works
Item Rate
60 days
TTPS
As per BQR conditions in NIT
6 documents required · 6 mandatory
₹0
Yes
9 Jan 2025
5 Nov 2024
21 Nov 2024
5 Nov 2024
20 Nov 2024
5 Nov 2024
Rewinding charges of 2.2KW/3.7 KW (1.9 KW & 3.7 KW)
Labour charges of Rewinding upto 1.1 KW Rewinding charges of 0.56 KW
Transporting charges for the motor from TTPS site to work shop and back to TTPS.
Less: The cost of retrieved copper (this copper scraped to be retained by the contractor)
SWETHA ENGINEERING CONSTRUCTION (BID ID -1186353)
SWETHA ENGINEERING CONSTRUCTION
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .