SUPERINTENDING ENGINEER
ELECTRICITY URBAN DISTRIBUTION CIRCLE, BUNGLOW NO.-9, OLD POWER HOUSE COLONY, RAILWAY STATION ROAD, GORAKHPUR
WORK OF CONSTRUCTION OF NEW 11/0.4 KV LT SUBSTATION AND INCREASING CAPACITY OF DISTRIBUTION TRANSFORMER
2023_PVVNV_782413_1
54/EUDC(G)/2022-23
Open Tender
Electrical Works
Lump-sum
30 days
AREA OF EUDC GKP
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SUPERINTENDING ENGINEER EUDC
₹7,000
20 Mar 2023
6 Mar 2023
17 Mar 2023
6 Mar 2023
17 Mar 2023
6 Mar 2023
Amount
fo|qr uxjh; forj.k [k.M&izFke] xksj[kiqj ds vUrxZr fctusl Iyku esa Lohd`r 3 vnn 250 ds0oh0,0 forj.k dh {kerk o`f) dj 400 ds0oh0,0 fd;s tkus ds dk;Z dks lseh VuZdh ds vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k %&
Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :-
11/0.4 KV 400 KVA Transformer
LT cable 1x400 sq.mm
Supply of following material/fitting complete in all respect :-
Copper Z Clamps
Alumunium Lugs
Fabrication, errection, commissioning & Testing of 400 KVA T/F on Plinth with all accessories including make its LT and HT connection. All neessary materials will be supplied by the Contractor.
Dismantling of old 250 KVA Transformer and safe loading, unloading and carraige of dismantled material from work site to departmental store
fo|qr uxjh; forj.k [k.M&f}rh;] xksj[kiqj ds vUrxZr fctusl Iyku esa Lohd`r 3 vnn 250 ds0oh0,0 forj.k dh {kerk o`f) dj 400 ds0oh0,0 fd;s tkus ds dk;Z dks lseh VuZdh ds vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k %&
Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :-
11/0.4 KV 400 KVA Transformer
LT cable 1x400 sq.mm
Supply of following material/fitting complete in all respect :-
Copper Z Clamps
Alumunium Lugs
Fabrication, errection, commissioning & Testing of 400 KVA T/F on Plinth with all accessories including make its LT and HT connection. All neessary materials will be supplied by the Contractor.
Dismantling of old 250 KVA Transformer and safe loading, unloading and carraige of dismantled material from work site to departmental store
fo|qr uxjh; forj.k [k.M&r`rh;] xksj[kiqj ds vUrxZr fctusl Iyku esa Lohd`r 1 vnn 250 ds0oh0,0 forj.k dh {kerk o`f) dj 400 ds0oh0,0 fd;s tkus ds dk;Z dks lseh VuZdh ds vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k %&
Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :-
11/0.4 KV 400 KVA Transformer
LT cable 1x400 sq.mm
Supply of following material/fitting complete in all respect :-
Copper Z Clamps
Alumunium Lugs
Fabrication, errection, commissioning & Testing of 400 KVA T/F on Plinth with all accessories including make its LT and HT connection. All neessary materials will be supplied by the Contractor.
Dismantling of old 250 KVA Transformer and safe loading, unloading and carraige of dismantled material from work site to departmental store
fo|qr uxjh; forj.k [k.M&r`rh;] xksj[kiqj ds vUrxZr fctusl Iyku esa Lohd`r 01 vnn 100 ds0oh0,0 forj.k dh {kerk o`f) dj 250 ds0oh0,0 fd;s tkus ds dk;Z dks lseh VuZdh ds vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k %&
Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :-
11/0.4 KV 250 KVA Transformer
LT cable 1x240 sq.mm
Supply of following material/fitting complete in all respect :-
Copper Z Clamps
Alumunium Lugs
Fabrication, errection, commissioning & Testing of 250 KVA T/F on Plinth with all accessories including make its LT and HT connection. All neessary materials will be supplied by the Contractor.
Dismantling of old 100 KVA Transformer and safe loading, unloading and carraige of dismantled material from work site to departmental store
fo|qr uxjh; forj.k [k.M&prqFkZ] xksj[kiqj ds vUrxZr fctusl Iyku esa Lohd`r 1 vnn 250 ds0oh0,0 forj.k dh {kerk o`f) dj 400 ds0oh0,0 fd;s tkus ds dk;Z dks lseh VuZdh ds vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k %&
Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :-
11/0.4 KV 400 KVA Transformer
LT cable 1x400 sq.mm
Supply of following material/fitting complete in all respect :-
Copper Z Clamps
Alumunium Lugs
Fabrication, errection, commissioning & Testing of 400 KVA T/F on Plinth with all accessories including make its LT and HT connection. All neessary materials will be supplied by the Contractor.
Dismantling of old 250 KVA Transformer and safe loading, unloading and carraige of dismantled material from work site to departmental store
fo|qr uxjh; forj.k [k.M&izFke] xksj[kiqj ds vUrxZr fctusl Iyku esa Lohd`r 1 vnn u;s 250 ds0oh0,0 forj.k ifjorZd dh LFkkiuk ds dk;Z dks lseh VuZdh ds vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k %&
Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :-
250 KVA Transformer
11 KV XLPE Cable 3X70 sq mm C/J kits O/D
11 KV XLPE Cable 3X70 sq mm
ST Pole 11 mtr long
MS Top Channel (125x65x2240) mm
MS angle (Dropper) 100X50X2028 mm
MS angle 75X75X6X2028 mm with clamp & bolts & nut (T/F base)
11 KV Fuse set
LT Cable 1X240 sq mm
Stay complete (Stay rod 16X1800 mm, stay wire 5 kg, stay clamp, bolt & nuts)
Earthing complete
Supply of following material/fitting complete in all respect :-
Holding Clamp for top, dropper channel Fuse set etc with nuts & bolts
Copper Z Calmp
Nuts & bolts of different sizes
Al Lugs
The excavation of 2 No foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of double Pole with fixing of necessary clamps & accessories (Top Channel, Dropper Angle etc.) as per required. All required materials such as Holding clamp/STP clamp, Nuts & Bolts off size etc will be provided by the contractor. Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor). Making plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top. All work will be done as per RESPO norms & relevent IS Specification.
Painting of Pole by double coating Aluminium & Red oxide paint. Paint will be provided by contractor
Earthing of ST Pole by MS earthing Rod & 6 SWG earthing Wire as per RESPO norms.
Fabrication, errection, commissioning & Testing of 250 KVA T/F on Plinth with all accessories including make its LT and HT connection. All neessary materials will be supplied by the Contractor.
Chemical earthing of Transformer (Body+Neutral) as per IS Code 3043 - 1987 specification (Materials will be provided by contractor)
Erection and grouting of stay in CC ratio 1:4:8 of Cement, Sand and Stone Ballast including cost of grouting material with nozelling and binding of stay wire (Complete work)
Construction of T/F plinth of size 2x2x1.2 M with the help of first class brick & 9" masonary in the ratio 1:4 cement & sand coarse. Filling the structure completely and plastering outer surface as per RESPO norms. Top of the plinth covered with 4" RCC Slab of ratio 1:1.5:3 (Cement, sand & concrete) grouting with 2 No ISMC size 125X65X6 MM (confirming to IS 808:1989) of 2000 mm long for resting. All required materials will be provided by the contractor.
Grill fencing of 11/0.4 KV S/S shall be made of rectangular of size & height approx 2 meter as per site requirement with fabrication 50X50X5 mm angel the frame is also have 1 No Horizontal runner of MS flat 40x5 welded in middle to support of grill, having a gate on road side must have provision of locking arrangement. The work is including painting of fencing as per norms. Work will be done as per RESPO specification.
Erection of 11 KV 3X70 Sq.mm. Cable Jointing Kit
Laying and sagging of overhead 11 KV 3X185 sq mm XLPE Cable as per site required.
Erection of 11 KV Fuse set
fo|qr uxjh; forj.k [k.M&izFke] xksj[kiqj ds vUrxZr fctusl Iyku esa Lohd`r 1 vnn u;s 100 ds0oh0,0 forj.k ifjorZd dh LFkkiuk ds dk;Z dks lseh VuZdh ds vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k %&
Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :-
100 KVA Transformer
ST Pole 11 mtr long
PCC Pole 8.5 mtr
LT AB Cable (3X120+1X95+1X16) sq mm
MS Top Channel (125x65x2240) mm
MS angle (Dropper) 100X50X2028 mm
MS angle 75X75X6X2028 mm with clamp & bolts & nut (T/F base)
11 KV Pin Insulator with pin
11 KV Pin
11 KV Disc Insulator
11 KV Disc with fitting
ACSR Weasel conductor
11 KV Fuse set
Stay complete (Stay rod 16X1800 mm, stay wire 5 kg, stay clamp, bolt & nuts)
LT Cable 1X240 sq mm
Earthing complete
MS Channel 125x65x1300 mm(T-Off)
Supply of following material/fitting complete in all respect :-
3-Phase LT Distribution Box with clamp
Clamp for T-off with bolts & nuts
Holding Clamp for top, dropper channel Fuse set etc with nuts & bolts
Copper Z Calmp
Nuts & bolts of different sizes
Al Lugs
Piercing connector insulated
Suspension Clamp with I hook (insulated)
Dead end clamp with I hook (insulated)
The excavation of 2 No foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of double Pole with fixing of necessary clamps & accessories (Top Channel, Dropper Angle etc.) as per required. All required materials such as Holding clamp/STP clamp, Nuts & Bolts off size etc will be provided by the contractor. Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor). Making plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top. All work will be done as per RESPO norms & relevent IS Specification.
The excavation of foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of PCC Pole with fixing of necessary clamps & accessories as per required. All required materials such as Holding clamp/PCC/LT clamp, F-Bracket, LT shacle insulator, Nuts & Bolts off size etc will be provided by the contractor. Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor). All work will be done as per RESPO norms & relevent IS Specification.
Painting of Pole by double coating Aluminium & Red oxide paint. Paint will be provided by contractor
Earthing of ST Pole by MS earthing Rod & 6 SWG earthing Wire as per RESPO norms.
Fabrication, errection, commissioning & Testing of 100 KVA T/F on Plinth with all accessories including make its LT and HT connection. All neessary materials will be supplied by the Contractor.
Chemical earthing of Transformer (Body+Neutral) as per IS Code 3043 - 1987 specification (Materials will be provided by contractor)
Erection and grouting of stay in CC ratio 1:4:8 of Cement, Sand and Stone Ballast including cost of grouting material with nozelling and binding of stay wire (Complete work)
Erection of 11 KV Fuse set
Laying, stringing, sagging, binding and jumpering of ACSR Weasel conductor for LT/HT Line with fixing of LT Clamps/other clamps, Shackle insulator and nuts&bolts off size as per required.
Laying, stringing, sagging, binding and jumpering of LT ABC (3x120+1x95+1x16) Sq.mm. Cable of LT Line with fixing of Distribution Box with Clamp, Insulated Dead end clamp with I hook, Suspension clamp with I hook(Insulated), LT insulated Piercing connector, XLPE 1X35 Sq.mm. Al. cable for enerzing DB, etc.
fo|qr uxjh; forj.k [k.M&f}rh;] xksj[kiqj ds vUrxZr fctusl Iyku esa Lohd`r 1 vnn u;s 250 ds0oh0,0 forj.k ifjorZd dh LFkkiuk ds dk;Z dks lseh VuZdh ds vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k %&
Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :-
250 KVA Transformer
ST Pole 11 mtr long
ACSR Dog conductor
MS Top Channel (125x65x2240) mm
MS angle (Dropper) 100X50X2028 mm
MS Channel 125x65x1300 mm(T-Off)
11 KV Pin Insulator with pin
11 KV Pin
11 KV Fuse set
LT Cable 1X240 sq mm
Stay complete (Stay rod 16X1800 mm, stay wire 5 kg, stay clamp, bolt & nuts)
Earthing complete
Supply of following material/fitting complete in all respect :-
Holding Clamp for top, dropper channel Fuse set etc with nuts & bolts
Copper Z Calmp
Nuts & bolts of different sizes
Al Lugs
LT clamp for STP
Shackle Insulator
The excavation of 2 No foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of double Pole with fixing of necessary clamps & accessories (Top Channel, Dropper Angle etc.) as per required. All required materials such as Holding clamp/STP clamp, Nuts & Bolts off size etc will be provided by the contractor. Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor). Making plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top. All work will be done as per RESPO norms & relevent IS Specification.
Painting of Pole by double coating Aluminium & Red oxide paint. Paint will be provided by contractor
Earthing of ST Pole by MS earthing Rod & 6 SWG earthing Wire as per RESPO norms.
Fabrication, errection, commissioning & Testing of 250 KVA T/F on Plinth with all accessories including make its LT and HT connection. All neessary materials will be supplied by the Contractor.
Chemical earthing of Transformer (Body+Neutral) as per IS Code 3043 - 1987 specification (Materials will be provided by contractor)
Erection and grouting of stay in CC ratio 1:4:8 of Cement, Sand and Stone Ballast including cost of grouting material with nozelling and binding of stay wire (Complete work)
Construction of T/F plinth of size 2x2x1.2 M with the help of first class brick & 9" masonary in the ratio 1:4 cement & sand coarse. Filling the structure completely and plastering outer surface as per RESPO norms. Top of the plinth covered with 4" RCC Slab of ratio 1:1.5:3 (Cement, sand & concrete) grouting with 2 No ISMC size 125X65X6 MM (confirming to IS 808:1989) of 2000 mm long for resting. All required materials will be provided by the contractor.
Grill fencing of 11/0.4 KV S/S shall be made of rectangular of size & height approx 2 meter as per site requirement with fabrication 50X50X5 mm angel the frame is also have 1 No Horizontal runner of MS flat 40x5 welded in middle to support of grill, having a gate on road side must have provision of locking arrangement. The work is including painting of fencing as per norms. Work will be done as per RESPO specification.
Erection of 11 KV Fuse set
fo|qr uxjh; forj.k [k.M&r`rh;] xksj[kiqj ds vUrxZr fctusl Iyku esa Lohd`r 1 vnn u;s 250 ds0oh0,0 forj.k ifjorZd dh LFkkiuk ds dk;Z dks lseh VuZdh ds vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k %&
Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :-
250 KVA Transformer
ST Pole 9 mtr long
PCC Pole 8.5 mtr
ACSR Dog conductor
11 KV Pin Insulator with pin
11 KV Pin
ACSR Weasel conductor
LT Cable 1X240 sq mm
Supply of following material/fitting complete in all respect :-
LT clamp for STP
LT clamp for PCC 8.5 M Pole
Copper Z Calmp
Nuts & bolts of different sizes
LT Shackle insulator
Al Lugs
Loop Insulator
The excavation of foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of PCC Pole with fixing of necessary clamps & accessories as per required. All required materials such as Holding clamp/PCC/LT clamp, F-Bracket, LT shacle insulator, Nuts & Bolts off size etc will be provided by the contractor. Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor). All work will be done as per RESPO norms & relevent IS Specification.
The excavation of foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of ST Pole with fixing of necessary clamps & accessories as per required. All required materials such as Holding clamp/STP/LT clamp, F-Bracket, LT shacle insulator, Nuts & Bolts off size etc will be provided by the contractor. Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor). In case of ST Pole making Plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top. All work will be done as per RESPO norms & relevent IS Specification.
Painting of Pole by double coating Aluminium & Red oxide paint. Paint will be provided by contractor
Fabrication, errection, commissioning & Testing of 250 KVA T/F on Plinth with all accessories including make its LT and HT connection. All neessary materials will be supplied by the Contractor.
Chemical earthing of Transformer (Body+Neutral) as per IS Code 3043 - 1987 specification (Materials will be provided by contractor)
Laying, stringing, sagging, binding and jumpering of ACSR Dog conductor for LT/HT Line with fixing of LT Clamps/other clamps, Shackle insulator and nuts&bolts off size as per required.
Laying, stringing, sagging, binding and jumpering of ACSR Weasel conductor for LT/HT Line with fixing of LT Clamps/other clamps, Loop insulator, Shackle insulator and nuts&bolts off size as per required.
Construction of T/F plinth of size 2x2x1.2 M with the help of first class brick & 9" masonary in the ratio 1:4 cement & sand coarse. Filling the structure completely and plastering outer surface as per RESPO norms. Top of the plinth covered with 4" RCC Slab of ratio 1:1.5:3 (Cement, sand & concrete) grouting with 2 No ISMC size 125X65X6 MM (confirming to IS 808:1989) of 2000 mm long for resting. All required materials will be provided by the contractor.
Grill fencing of 11/0.4 KV S/S shall be made of rectangular of size & height approx 2 meter as per site requirement with fabrication 50X50X5 mm angel the frame is also have 1 No Horizontal runner of MS flat 40x5 welded in middle to support of grill, having a gate on road side must have provision of locking arrangement. The work is including painting of fencing as per norms. Work will be done as per RESPO specification.
M/S MAA LAKSHMI TRADERS
Saurabh Enterprises
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .