| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 CrAccepted-AOC PLOT NO 63 PAHADIYAN DISTRICT VARANASI UTTAR PRADESH | VARANASI | UTTAR PRADESH | 221001 | ₹6.7 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹6.8 Cr+₹13.9 L (2.08%)Rejected-AOC | ₹6.8 Cr+₹13.9 L (2.08%) | L2 | Rejected-AOC L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹6.8 Cr
EMD Value
₹13.7 L
Closing Date
17 Feb 2024, 2:00 pmClosed
S. E. Irrigation Construction Circle, Varanasi
Superintending Engineer, Irrigation Construction Circle, Varanasi
Restoration And Demarcation Of Tarighat Dy From Km 0.000 To Km 27.950 Of Chaudhary Charan Singh Pump Canal System Zamania In District - Ghazipur
2024_UPIDC_892897_10
03/SE/2023-24
Open Tender
Civil Works
Item Rate
240 days
Vill-Tarighat, Teh-Zamania, Dist-Ghazipur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹13.7 L
29 Apr 2024
12 Feb 2024
17 Feb 2024
12 Feb 2024
17 Feb 2024
12 Feb 2024
Amount
Earth Work in Renovation and making canal section proper in all types of soil including all lead, lift, labour, T&P etc complete.
Earth Work in cutting for making canal section proper of in all types of soil including all lead, lift, labour, T&P etc complete.
Dismentling of Brick work in cement mortor for construction of DRB/VRB in all type of soil including all lead & lift ,cost of labours & T&P etc.
Dismentling of R.C.C work for construction of DRB/VRB in all type of soil including all lead & lift ,cost of labours & T&P etc.including disposal
E.W. in Ramp or approch road in all type of soils with all lead & lift including cost of all labours, T&P etc complete.
Earth Work for Excavation in foundation in ordinary soil including all lead & lift and including filling ,watering ,ramming of excavated earth of foundation trench and removal and disposal of surplus earth as directed by site incharge including all labours,T&P etc.complete
Earth Work for Excavation in foundation in wet soil including ncluding lift up to 1.5 metre and lead up to 30 metre and including filling ,watering ,ramming of excavated earth of foundation trench and removal and disposal of surplus earth as directed by site incharge up to a distance 30 metre from the foundation trench all labours,T&P etc.complete
Supply and laying local Sand in Bed with all lead and lift including all cost of material, labours , T&P and all taxes etc complete.
Providing & Laying C.C 1: 3: 6 (Cement, C. Sand FM not less than 3.0 & Stone Ballast size 40 to 60mm ) in foundation for VRB with all lead & lift including cost of all materials labours, T&P etc.complete
Making subgrade including cost of all labour,T&P etc complete .
S/Laying LDPE Film 100 micron thick on slope over sand filter including cost of all materials labour t&p etc complete
Ist Class Brick Work with 1 : 4 Cement morter ( Coarse Sand FM not less than 3.0) For VRB with all lead & lift including cost of all materials labours, T&P etc complete.
Ist Class Brick Work with 1 : 3 Cement morter ( Coarse Sand FM not less than 3.0) For VRB with all lead & lift including cost of all materials labours, T&P etc complete.
Providing & Fixing outlets 150 mm Dia Np3 pipe including cost of all lead & lift, cost of materials, labours, & T&P etc.complete
Deep Struck Pointing in 1:2 CM on Brick Masonry with coarse sand FM not less than 2.0 including Cost of materials , Labours & T&P etc complete
Centering & shuttering for RCC work with cost of materials. Labours & T&P etc complete
Cutting , Bending & Binding of Tor Steel with cost of all materials. Labours & T&P etc complete
Providing & Laying RCC in 1:1.5:3 with cement,stone grit size 10mm to 20mm well graded & coarse sand FM not less than 3.0 including cost of all materials, Labours & T&P etc complete.
Two coat Painting with acrylic emulsion paint having VOC content less than 50 gram /liter of approved brond & manufacture over one priming coat of approved brond & manufacture with water thinnable cement primer on surface having VOC content less than 50 gram/ liter . including cost of all material ,labour,T&P etc.complete
Providing & Laying C.C 1: 2: 4 (Cement, C. Sand & Stone Ballast) in foundation of Tail gull wall with all lead & lift including cost of all materials labours, T&P etc.
Providing & fixing steel gate including Fabrication ,turning ,threading with cost of all materials labour & T&p etc work complete in all respect.
Providing Wearing Coat 1:1.5:3 cement,stone grit size 4.75mm to 10mm well graded & coarse sand FM not less than 3.0 including cost of all materials, Labours & T&P etc complete.
Brick on edge soling for both side approch with first class brick and local sand with prepration of sub grade all lead lift including cost of all material ,labour,T&P etc.complete
Dewatering from pit of foundation by 5HP Diesel Pump including cost of Diesel,labour T&P etc complete
Fixing wheel Guard including cost of all material ,labour,T&P etc complete
M/s RAJIV AND COMPANY PRIVATE LIMITED
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .