Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAccepted-AOC VPO TIGAON MOHALLA JAIDAR PATTI NEAR NIMKA MOD TIGAON 121101 | TIGAON | FARIDABAD | HARYANA | 121101 | L1 | Accepted-AOC ok | |
| 2 | L2₹9.7 L+₹92,584 (10.5%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹10.8 L+₹2.0 L (22.4%)Rejected-Finance 00 ITBAHRA GAUR KANIKAPUR ROAD KANIKAPUR BASTI UTTAR PRADESH 272163 | BASTI | UTTAR PRADESH | 272163 | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | Shivam Bhardwaj L2 | RI Infrastructure L1 | M K ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.00 | Hiring charge of 62.5 KVA generator set including service, transportation complete in all respect. (Note:-Diesel provided by MCF) | 12 | Per Month | 20,000 ₹2,40,000 | 17,000 ₹2,04,000 Lowest | 22,000 ₹2,64,000 |
| 2.00 | Hiring of Pump Operator 3 nos x 12 month = 36 nos | 36 | Nos. | 19,500 ₹7,02,000 | 18,126 ₹6,52,536 Lowest | 21,500 ₹7,74,000 |
| 3.00 | Rectification of electric fault or any type of electric problem if occurred by the electrician.1 job per month x 12 month=12 nos | 12 | Nos. | 1,000 ₹12,000 | 500 ₹6,000 Lowest | 1,500 ₹18,000 |
| 4.00 | Repair and Maintenance of Motor Pump with Panel Board, Cable with all accessories. 2 times x 2 nos x 5 bhp =10 hp x 750 per bhp plus 6% per annum = 15900 /- | 1 | Job | 17,000 ₹17,000 | 15,880 ₹15,880 Lowest | 19,000 ₹19,000 |
Tender Value
₹8.8 L
EMD Value
₹17,560
Closing Date
11 Aug 2026, 6:55 pmClosed
NITIN KADIAN
Municipal Corporation Faridabad
Operation and Maintenance of mini disposal for the one year at Gadda colony under Municipal Corporation Faridabad.
2026_HRY_538588_1
2026E9D8877D FB0A 41A0 B0F6 ABA321A27D2D284ULB
Open Tender
Civil Works
Works
480 days
Faridabad (MC)
2 documents required · 2 mandatory
₹1,000
₹17,560
Yes
16 Sept 2026
4 Aug 2026
12 Aug 2026
4 Aug 2026
11 Aug 2026
4 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Hiring charge of 62.5 KVA generator set including service, transportation complete in all respect. (Note:-Diesel provided by MCF) | 12 | Per Month | - | - |
| 2 | Hiring of Pump Operator 3 nos x 12 month = 36 nos | 36 | Nos. | - | - |
| 3 | Rectification of electric fault or any type of electric problem if occurred by the electrician.1 job per month x 12 month=12 nos | 12 | Nos. | - | - |
| 4 | Repair and Maintenance of Motor Pump with Panel Board, Cable with all accessories. 2 times x 2 nos x 5 bhp =10 hp x 750 per bhp plus 6% per annum = 15900 /- | 1 | Job | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_617796.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .