Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.3 LAccepted-Finance 2 204 B PONNAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | 1 | Accepted-Finance Satisfied | |
| 2 | 2₹13.5 L+₹26,600 (2.01%)Accepted-Finance | 2 | Accepted-Finance Satisfied | |
| 3 | Not Admitted-Fee/PreQual/Technical 46C 7G EVEREST HOUSE CHOWRINGHEE ROAD MIDDLETON ROW KOLKATA 700071 | KOLKATA | KOLKATA | WEST BENGAL | 700071 | - | Not Admitted-Fee/PreQual/Technical Others-1) As per the tender Specification (Section – A Conditions No.11) undertaking in lieu of exemption of EMD is not furnished. |
Tender Value
Refer Docs
EMD Value
₹17,600
Closing Date
13 Oct 2022, 2:00 pmClosed
Superintending Engineer Operation MTPS 1
Office of the Superintending Engineer Operation Mettur Thermal Power Station I Mettur Dam 636406
MTPS I Operation Circle Chemical Division Engaging of external agency on works contract basis for the works of Collection of various samples for analysis for a period of 120 days from the date of awarding the work
2022_EB_254008_1
SE O MTPS I CD OT 06 2022 23
Open Tender
Miscellaneous Works
Works
120 days
MTPS 1 Mettur Dam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹17,600
Yes
17 Oct 2022
29 Sept 2022
14 Oct 2022
29 Sept 2022
13 Oct 2022
29 Sept 2022
Amount
Collection of coal samples from received wagons transfer samples to sampling room, reduction of quantity by coning and quartering, crushing and preparation of final samples at sample preparation room. Cleaning and disposal of waste coal round the clock.
Collection of coal samples from the Bunker conveyer of running units, transfer samples to sampling room, reduction of quantity by coning and quartering, crushing and preparation of final samples at sample preparation room. Cleaning and disposal of waste coal round the clock.
Collection of bottom ash & fly ash once in two hours from the running units, reduction of quantity by coning and quartering, crushing, drying and preparation of final samples at Fuel laboratory. Cleaning and disposal of waste round the clock.
Ai)Drying of the Joint Coal Samples received from Talcher mines reduction of quantity by coning and quartering Crushing and preparation of final samples at fuel Laboratory. Cleaning and disposal of Waste. ii) Collection of Pulverised coal samples from Mills iii) Collection of Lubrication oil samples from MOT, BFP, Mill, other oil samples etc. iv) Collection of HFO & HSD samples. V) Collection of DM Water for analysis Work.
(i) Collection of Raw water and cooling water samples from fore bay & clarifier. (ii) Collection of SH Water, feed water& stator water, CBD samples. (iii) Collection of Hydrogen gas sample for moisture test in all Units. (iv) Dosing of Chemicals like Alum, Poly Electrolyte, Organophosphonate at Pre Treatment Plant and Cold Lime Softener Room v)Withdrawal of fine & bulk chemicals form stores, unloading of bulk chemicals at site, Sample Collection. vi) Preparation of the Test Instruments. (vii) Cleaning of the instruments, Glassware’s, Laboratory Desks after testing and up keeping of the Main Lab. viii) Cleaning of chemical spillages in working premises then there for the safety precaution of hazardous chemicals. ix) Daily leaning of entire huge area of ground floor and first floor of Chemical Division x) Cleaning of Boiler feed water laboratory stage I& II, DM Plant stage I & II, Cooling water pre treatment chemical storage area.
i)Dosing of Chemicals like Ammonia, Hydrazine,Phosphate in Feed Water. (ii) Collection of SH Water,feed water& stator water, MCP, Deaerator,CBD, SS water samples. (iii) Collection of Hydrogen gas and flue gas samples round the clock.
Collection of SAC water samples, WBA water samples,SBA water samples, MB water samplers, FPS water samples , Alum samples and DM tank samples in DM Plant stage I and II. Dosing of Chemicals like Alum land Ploy Electrolyte round the clock.
Consumables such as cotton waste, dungry cloth, safety appliances like goggles, air respirators, gum boots, hand gloves etc., for Sl.No. 1 to 7
M.SARAVANAN CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .