| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹42.6 LAdmitted-Finance | -0.25% | ₹42.6 L | L1 | Admitted-Finance |
| 2 | L2₹42.7 LAdmitted-Finance GARHI ROAD MOHALLA KASHIPURAM GARHI ROAD LAKHIMPUR KHERI UTTAR PRADESH 262701 | KHERI | UTTAR PRADESH | 262701 | -0.01% | ₹42.7 L | L2 | Admitted-Finance |
Updated dates
Tender Value
₹50.9 L
EMD Value
₹1.0 L
Closing Date
25 May 2026, 12:00 pmClosed
SE RED Ayodhya Circle
SE RED AYODHYA CIRCLE, BADA RAMANA, REEDGANJ, AYODHYA
Under District Amethi, Construction of community hall in village Astanagar Majre Mohana, development block Bahadurpur, Tehsil Tiloi district Amethi, Lot No 3
2026_REDUP_1147247_3
24/SE RED Ayodhya/Amethi/26-27 Dt 02/04/2026
Open Tender
Civil Works
Amethi
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹1.0 L
SE RED Ayodhya Circle
27 Jun 2026
11 May 2026
25 May 2026
11 May 2026
25 May 2026
11 May 2026
13 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Work | - | - | - | - |
Earth work in exacavation in foundations in ordinary soil (loam clay or sand) including lift upto 1.5 m and lead upto 30 mt. & including filling, watering and ramming of excavated earth into the trenches or into the space between building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the E/I upto a distance of 30 mt. from the foundation trenches. | 99.21 | Cum | 125.1 | ₹12,411.17 | |
Providing and laying in cement concrete 1:4:8 (1 cement: 4 coarse sand : 8 graded stone ballast 40 mm nominal size) and curing complete, including cost of form- work, in foundation. | 17.91 | Cum | 4,800.93 | ₹85,984.66 | |
Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and alround the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete. | 120.71 | Cum | 218.52 | ₹26,377.55 | |
R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone grit im the proportion of 1:1.5:3 in Foundation excluding supply of reinforcement and its fixing and binding the same with 24 BWG binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour, tools and plants etc. required for proper completion of the works. strength of the concrete shall not beless than M-20. | 23.31 | Cum | 6,375.22 | ₹1,48,606.38 | |
R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone grit im the proportion of 1:1.5:3 in lintels of doors and windows excluding supply of reinforcement and its fixing and binding the same with 24 BWG binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour, tools and plants etc. required for proper completion of the works. strength of the concrete shall not beless than M-20. | 6.39 | Cum | 8,108.8 | ₹51,815.23 | |
R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone grit im the proportion of 1:1.5:3 in Column excluding supply of reinforcement and its fixing and binding the same with 24 BWG binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour, tools and plants etc. required for proper completion of the works. strength of the concrete shall not beless than M-20. | 5.49 | Cum | 7,648.9 | ₹41,992.46 | |
First class brick M-150 work in 1:6 cement and coarse sand of 2.25 fineness modulus) mortar in foundation & plinth including supply of all materials, labour, T & P etc reqiored for proper completion of the work. | 26.57 | Cum | 5,026.64 | ₹1,33,557.82 | |
R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone grit in the proportion of 1:1.5:3 in Lighter Beam excluding supply of reinforcement and its fixing and binding the same with 24 BWG binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour, tools and plants etc. required for proper completion of the works. strength of the concrete shall not beless than M-20. | 8.73 | Cum | 8,108.8 | ₹70,789.82 | |
R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone grit im the proportion of 1:1.5:3 in Slab excluding supply of reinforcement and its fixing and binding the same with 24 BWG binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour, tools and plants etc. required for proper completion of the works. strength of the concrete shall not beless than M-20. | 21.23 | Cum | 8,108.8 | ₹1,72,149.82 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.56 MB
Tendernotice_2.pdf
PDF • 9.22 MB
BOQ_2146115.xls
BOQ • 0.49 MB
Download all tender documents and submit your bid