| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance HOJAI DISTRICT | -12.00% | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.1 CrAdmitted-Finance | -10.50% | ₹1.1 Cr | L2 | Admitted-Finance |
| 3 | L3₹1.1 CrAdmitted-Finance | -10.10% | ₹1.1 Cr | L3 | Admitted-Finance |
| 4 | L4₹1.1 CrAdmitted-Finance | -7.30% | ₹1.1 Cr | L4 | Admitted-Finance |
| 5 | L5₹1.2 CrAdmitted-Finance | -6.00% | ₹1.2 Cr | L5 | Admitted-Finance |
Tender Value
₹1.2 Cr
EMD Value
₹2.5 L
Closing Date
6 Jan 2026, 2:00 pmClosed
AGM CE
FCI RO NEF
Reconstruction of damaged godown floor and repairs to platforms at FSD Bairabi
2025_FCI_890984_1
CE/07/2025-26
Open Tender
Civil Works
240 days
Bairabi
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2.5 L
16 Feb 2026
23 Dec 2025
7 Jan 2026
23 Dec 2025
6 Jan 2026
23 Dec 2025
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge Nominal concrete 1:3:6 or richer mix
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge Nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix)
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in charge. All kinds of soil
Carriage of materials by mechanical transport including loading, unloading and stacking earth lead upto 2Km The rates will be applicable to net quantities after deduction of prescribed percentage for voids as per specification
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
Providing and laying separation membrane of impermeable plastic sheeting 125 micron thick base course as per direction of Engineer In Charge.
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars aml disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone- III) derived from naturalsources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complele upto plinth level. Thermo'Mechanically Treated bars of grade Fe 500D or more
Providing and laying C.C. Flooring of mix M-25 with ready mixed concrete from batching plant and hardening compound mixed @ 1 litre per 50 kg of cement or as per manufacturer's specifications. The ready mixed concrete shall be laid and finished with screed board vibrator, vacuum dewatering process and finally finished with a floating coat of neat cement etc. And longitudinal joints (6 mm wide x 25 mm deep) by groove cutting machine, providing and filling joints with approved joint filler and sealants, complete as per specifications and directions of Engineer-in-charge. (Note: Cement content considered in this Item is @330 kg/cum. Excess/less cement used as per design mix is payable/ recoverable separately).
Filling the gap in between aluminium/ stone/ wood frame and adjacent RCC/Brick/ Stone/ wood/ Ceramic/ Gypsum work by providing weather/structural non sag elastomeric PU sealant over backer rod of approved quality as per architectural drawings and direction of Engineer-in-charge complete, complying to ASTM C920, DIN 18540- F & ISO 11600 Upto 10 mm depth and 10 mm width
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position andapplying a priming coat of approved steel primer all complete
Carriage of materials by mechanical transport including loading,unloading and stacking Lime, moorum, building rubbish lead upto 2Km The rates will be applicable to net quantities after deduction of prescribed percentage for voids as per specification
Centering and shuttering including strutting, propping etc. and removal of form for lintels, beams, plinth beams, girders, bressumers and cantilevers
15 mm cement plaster 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement on the rough side of single or half brick wall
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
MTFBairabiFlooring.pdf
Tender Documents • 2.00 MB
BOQ_936504.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid