| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.1 LAccepted-AOC | L-1 | Accepted-AOC Accepted as L-1 |
Tender Value
₹5.6 L
EMD Value
₹7,100
Closing Date
31 Jan 2025, 5:00 pmClosed
Staf Officer Mining
Staff Officer (Mining) SECL Sohagpur Area, PO- Dhanpuri, Distt- Shahdol (MP),Mobile No.- 9425533459
Shifting of 05 nos. of Transformer TSU315KVA, 3.3 KV / 570V with all electrical equipments from VII Seam to VI Top seam for proposed depillaring CM Panel C1 and C2 at Bangwar UG Mine of Sohagpur Area .
2025_SECL_325821_1
SECL/SGP/SO(M)/e-T/35/24-2 5/674 Dt015.01.2025
Open Tender
Civil Works - Others
Item Rate
180 days
Bangwar UG MIne
As per NIT
8 documents required · 8 mandatory
₹7,100
27 Feb 2025
15 Jan 2025
2 Feb 2025
15 Jan 2025
31 Jan 2025
23 Jan 2025
15 Jan 2025 - 23 Jan 2025
Amount
Item Description/ Heading Part (A) labour CostAs per GMSR-2024
Transportation of Transformer with the electrical equipments from surface to u/g or shifting from one to another place in u/g or withdrawal u/g Surface with a lead of 1.00 Km. For each additional distance of 1.0 Km beyond 1.0 Km. original lead, there will be 15% enhance rate (i) 02 Nos. of Transformer, TSU 315KVA, 3.3KV/570V to be shifted from 25D/28L (VII seam) to 39L/ECD (VI Top seam) 25D/28L (VII Seam) TO MD3/28L (VII Seam) = 750M MD3/28L(VII Seam)TO MD3/14L(VII seam) = 350M MD3/14L(VI Top Seam)TO MD3/5L(VI Top seam) = 220M MD3/5L(VI Bottom Seam) TO MD3/30L(VI Bottom Seam)= 650M MD3/30L(VI Top Seam) TO 39L/ECD(VI TOP) = 200M Shown in Pink Colour on planTOTAL DISTANCE=2170M
02 Nos. of Transformer TSU 315KVA, 3.3KV/570V to be shifted from MD3/43L(VII seam) TO 39L/21R(VI Top seam) MD3/43L(VII SEAM) TO MD3/34L(VI TOP) =280M MD3/34L(VI TOP) TO MD3/39L(VI TOP) =150M 39L/MD3(VI TOP) TO 39L/21R(VI TOP) =610M Shown in Yellow Colour on plan TOTAL DISTANCE=1040M
01 Nos. of Transformer, TSU 315KVA, 3.3KV/570V to be shifted from MD3/26L (VII Seam) TO 53L-54L/33D(VI Top Seam) MD3/26L/(VII Seam) TO MD3/14L(VI Top Seam)= 300M MD3/14L(VI Top Seam) TO MD3/5L(VI Bottom) =220M MD3/5L(VI Bottom Seam) TO MD3/30L(VI Bottom)=650M MD3/30L(VI Bottom Seam) TO 39L/MD3(VI TOP) =220M 39L/MD3(VI TOP) TO 39L/21R(VI TOP) =610M 21D/39L(VI TOP) TO 21D/48L(VI TOP) =230M 48L/21D(VI TOP) TO 48L/31D(VI TOP) =270M 31D/48L(VI TOP)TO 31D/53L(VI TOP) =100M 53L/31D(VI TOP) TO 53L-54L/33D(VI TOP) C1 =75M Shown in Green Colour on plan TOTAL DISTANCE=2675M
Shifting of main ACB, coupled ACB with 100M armoured cable (50/70mm2) laying thereof with side support within the district/panel for a distance of 50m.
Cleaning/ removal of debris/stone from galleries and stacking within 50m distance UG SUB STATION:- (20.00 X 4.00 X 0.20)x 03 Nos. =48.00 m3
Centering, shuttering, finishing and reinforcement including cutting , bending, placing in position and binding and strutting, proping etc complete. UG SUB STATION:- (7.00 + 7.00 +2.00 +2.00) X 0.30=05.40m2 X 05 Nos.=27.00m2
Cement concrete/PCC (1:2:4) in foundation /plinth / flooring/wall (any thickness) in u/g (Excluding centring, shuttering and cost of CC materials) UG SUB STATION:- Plate Form -(7.00 X 2.00 X 0.30)x 05 Nos. =21.00 m3
White washing in u/g with white lime to give an even shade on old work/new work UG SUB STATION:- sides- (20.00 x 2 x 3.35)=134.00m2 X 03 Nos.=402.00m2 Roof- 20.00 x 4.50 =90.00m2 X 03 Nos. =270.00m2 Total =672.00m2
Loading of all kind of building materials in to tubs at incline/Pit mouth on surface with lead of 50m.(Calculation sheet enclosed) Cement
20mm stone agregate
Transportation of all kind of building material from surface to u/g through haulages with tramming and pushing, coupling /uncoupling etc for a distance every 2.0 Km or part there of and bringing the empty tubs to surface. (Calculation sheet enclosed) cement
20mm stone agregate
Unloading of all kind of building materials from tubs at destination in u/g and stacking the same. (Calculation sheet enclosed) Cement
20mm stone agregate
Lead for transportation/carriage of all kinds building materials by manually in ug. 46.00m to 60.00m.
Part-B Material Cost supply and stacking of building materials Cement
20 mm Stone aggregate
Total impact of GST for the purpose of CTC
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .