Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹63.3 LAccepted-AOC VILLAGE SHAHBAJPUR KHALSA PO MAJRA GURDAS 123401 | REWARI | REWARI | HARYANA | 123401 | ₹63.3 L Quoted ₹64.5 L | 1 | Accepted-AOC Lowest |
| 2 | Not Admitted-Fee/PreQual/Technical DSP OFFICE ROAD NEAR AIRTEL TOWER EMPLOYEE COLONY WARD NO 2 123029 | MAHENDRAGARH | HARYANA | 123029 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | NAVEEN KUMAR L1 |
|---|---|---|---|---|
| 1.00 | Repair of submersible/ Horizontal pumping sets for water works, boosting station and tube wells consisting mainly of motor, pump, electrical
control panel, starter, cable, wires of all type, capacitors, volt meters ampere meters, main switches, Kit Kats, change over, lighting arrangement etc. Including all electric installation complete and all accessories i.e. sluice valves,
non return valves etc. pertaining to pumping machinery inside the premises of water works, Boosting station and tube wells and all other works contingent. i) Submersible motor (upto 20 HP) Nos - 39 Total BHP = 360 BHP x 12 months
ii) Submersible motor (Above 20 HP) Nos - 4 Total BHP = 250 BHP x 12 months
iii) Centrifugal motor (upto 20 HP) Nos - 15 Total BHP = 155 BHP x 12 months
iv) Centrifugal motor (Above 20 HP) Nos - 14 Total BHP = 455 BHP x 12
months
For the 1st Year of O and M | 1 | Nos. | 20,26,855 ₹20.3 L |
| 2.00 | Repair of submersible/ Horizontal pumping sets for water works, boosting station and tube wells consisting mainly of motor, pump, electrical
control panel, starter, cable, wires of all type, capacitors, volt meters ampere meters, main switches, Kit Kats, change over, lighting arrangement etc. Including all electric installation complete and all accessories i.e. sluice valves,
non return valves etc. pertaining to pumping machinery inside the premises of water works, Boosting station and tube wells and all other works contingent.
i) Submersible motor (upto 20 HP) Nos - 39 Total BHP = 360 BHP x 12 months
ii) Submersible motor (Above 20 HP) Nos - 4 Total BHP = 250 BHP x 12
months
iii) Centrifugal motor (upto 20 HP) Nos - 15 Total BHP = 155 BHP x 12 months
iv) Centrifugal motor (Above 20 HP) Nos - 14 Total BHP = 455 BHP x 12
months
O and M of pumping machiery for 3rd year | 1 | Nos. | 22,77,374 ₹22.8 L |
| 3.00 | Repair of submersible/ Horizontal pumping sets for water works, boosting station and tube wells consisting mainly of motor, pump, electrical control panel, starter, cable, wires of all type, capacitors, volt meters ampere meters, main switches, Kit Kats, change over, lighting arrangement etc. Including all electric installation complete and all accessories i.e. sluice valves,
non return valves etc. pertaining to pumping machinery inside the premises of water works, Boosting station and tube wells and all other works contingent.
i) Submersible motor (upto 20 HP) Nos - 39 Total BHP = 360 BHP x 12 months
ii) Submersible motor (Above 20 HP) Nos - 4 Total BHP = 250 BHP x 12 month
s iii) Centrifugal motor (upto 20 HP) Nos - 15 Total BHP = 155 BHP x 12
months
iv) Centrifugal motor (Above 20 HP) Nos - 14 Total BHP = 455 BHP x 12
months
O and M of pumping machiery for 2nd year | 1 | Nos. | 21,48,466 ₹21.5 L |
Tender Value
₹59.7 L
EMD Value
₹1.2 L
Closing Date
5 May 2026, 5:00 pmClosed
VINAY PRAKASH CHAUHAN
Rewari PHED No. 1
O and M work, Repair work and various work
2026_HRY_518185_1
2026EFA487A2 A2A3 49BF B366 AA5832D719CA579PUH
Open Tender
Civil Works
1095 days
GINDOKHER RAJ PURA KHALSA BHUD PUR AAS PUR DEH
2 documents required · 2 mandatory
₹5,000
₹1.2 L
Yes
3 Jun 2026
28 Apr 2026
6 May 2026
28 Apr 2026
5 May 2026
28 Apr 2026
28 Apr 2026 - 30 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repair of submersible/ Horizontal pumping sets for water works, boosting station and tube wells consisting mainly of motor, pump, electrical
control panel, starter, cable, wires of all type, capacitors, volt meters ampere meters, main switches, Kit Kats, change over, lighting arrangement etc. Including all electric installation complete and all accessories i.e. sluice valves,
non return valves etc. pertaining to pumping machinery inside the premises of water works, Boosting station and tube wells and all other works contingent. i) Submersible motor (upto 20 HP) Nos - 39 Total BHP = 360 BHP x 12 months
ii) Submersible motor (Above 20 HP) Nos - 4 Total BHP = 250 BHP x 12 months
iii) Centrifugal motor (upto 20 HP) Nos - 15 Total BHP = 155 BHP x 12 months
iv) Centrifugal motor (Above 20 HP) Nos - 14 Total BHP = 455 BHP x 12
months
For the 1st Year of O and M | 1 | Nos. | - | - |
| 2 | Repair of submersible/ Horizontal pumping sets for water works, boosting station and tube wells consisting mainly of motor, pump, electrical
control panel, starter, cable, wires of all type, capacitors, volt meters ampere meters, main switches, Kit Kats, change over, lighting arrangement etc. Including all electric installation complete and all accessories i.e. sluice valves,
non return valves etc. pertaining to pumping machinery inside the premises of water works, Boosting station and tube wells and all other works contingent.
i) Submersible motor (upto 20 HP) Nos - 39 Total BHP = 360 BHP x 12 months
ii) Submersible motor (Above 20 HP) Nos - 4 Total BHP = 250 BHP x 12
months
iii) Centrifugal motor (upto 20 HP) Nos - 15 Total BHP = 155 BHP x 12 months
iv) Centrifugal motor (Above 20 HP) Nos - 14 Total BHP = 455 BHP x 12
months
O and M of pumping machiery for 3rd year | 1 | Nos. | - | - |
| 3 | Repair of submersible/ Horizontal pumping sets for water works, boosting station and tube wells consisting mainly of motor, pump, electrical control panel, starter, cable, wires of all type, capacitors, volt meters ampere meters, main switches, Kit Kats, change over, lighting arrangement etc. Including all electric installation complete and all accessories i.e. sluice valves,
non return valves etc. pertaining to pumping machinery inside the premises of water works, Boosting station and tube wells and all other works contingent.
i) Submersible motor (upto 20 HP) Nos - 39 Total BHP = 360 BHP x 12 months
ii) Submersible motor (Above 20 HP) Nos - 4 Total BHP = 250 BHP x 12 month
s iii) Centrifugal motor (upto 20 HP) Nos - 15 Total BHP = 155 BHP x 12
months
iv) Centrifugal motor (Above 20 HP) Nos - 14 Total BHP = 455 BHP x 12
months
O and M of pumping machiery for 2nd year | 1 | Nos. | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_597067.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid