Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹30.0 LAdmitted-Finance 2470 HUDSON LINE GTB NAGAR DELHI 110009 | NORTH | DELHI | 110009 | -2.50% | ₹30.0 L | L1 | Admitted-Finance |
| 2 | L2₹31.9 LAdmitted-Finance 961 GROUND FLOOR MUKHERJEE NAGAR DELHI 110009 | NORTH | DELHI | 110009 | +3.40% | ₹31.9 L | L2 | Admitted-Finance |
Tender Value
₹30.8 L
EMD Value
₹61,640
Closing Date
17 Jun 2026, 3:00 pmClosed
Executive Engineer (E)
EEE PWD DHC and ND/Central G.F. MSO Bldg. ND
1) Maintenance and operation of E and M service at Chief Election officer, Kashmere Gate, New Delhi. 2) Maintenance and operation of E and M services at MSO Building, New Delhi. (SH - Comprehensive Maintenance of Vertive make PAC system).
2026_PWD_293286_1
62/EE(E)/PWDDHC,ND/C/2026-27
Open Tender
Electrical Works
365 days
New Delhi
Please refer Tender documents.
17 documents required · 17 mandatory
₹0
₹61,640
20 Jun 2026
11 Jun 2026
17 Jun 2026
11 Jun 2026
17 Jun 2026
11 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Comprehensive maintenance and minor repair of Precision Air Conditioning Machine of following size capacity suitable for critical technology/ equipment room direct expansion microprocessor Precision Air Conditioner with allied accessories, piping, controller, etc installed at MSO Building & CEO Kashmiri Gate.
1.1) 7.5 kW, 2 TR PAC
1.1.1) Datamate, 7.5 kW, 2 TR, 3Ph, 415 Vac, 50 Hz, R407C, Air Conditioning Machine at 3rd Floor Server Room | 12 | Months | 11,103 | ₹1,33,236 | BI01010001010000000000000515BI0100001113 |
| 2 | 1.1.2) Datamate, 7.5 kW, 2 TR, 3Ph, 415 Vac, 50 Hz, R407C, Air Conditioning Machine at 11th Floor Server Room | 12 | Months | 11,103 | ₹1,33,236 | BI01010001010000000000000515BI0100001114 |
| 3 | 1.1.3) Datamate, 7.5 kW, 2 TR, 3Ph, 415 Vac, 50 Hz, R407C, Air Conditioning Machine at 11th Floor Server Room | 12 | Months | 11,103 | ₹1,33,236 | BI01010001010000000000000515BI0100001115 |
| 4 | 1.1.4) Datamate, 7.5 kW, 2 TR, 3Ph, 415 Vac, 50 Hz, R407C, Air Conditioning Machine at 11th Floor Server Room | 12 | Months | 11,103 | ₹1,33,236 | BI01010001010000000000000515BI0100001116 |
| 5 | 1.1.5) Datamate, 7.5 kW, 2 TR, 3Ph, 415 Vac, 50 Hz, R407C, Air Conditioning Machine at 11th Floor Server Room | 12 | Months | 11,103 | ₹1,33,236 | BI01010001010000000000000515BI0100001117 |
| 6 | 1.2) 12.5 kW, 3 TR PAC
1.2.1) Datamate, 12.5 kW, 3 TR, 3 Ph, 415 Vac, 50 Hz, R407C, Air Conditioning Machine at 7th Floor Server Room | 12 | Months | 14,205 | ₹1,70,460 | BI01010001010000000000000515BI0100001118 |
| 7 | 1.2.2) Datamate, 12.5 kW, 3 TR, 3 Ph, 415 Vac, 50 Hz, R407C, Air Conditioning Machine at 11th Floor Server Room | 12 | Months | 14,205 | ₹1,70,460 | BI01010001010000000000000515BI0100001119 |
| 8 | 1.2.3) Datamate, 12.5 kW, 3 TR, 3 Ph, 415 Vac, 50 Hz, R407C, Air Conditioning Machine at 11th Floor Server Room 12 Months 14205.00 Month 170460.00 | 12 | Months | 14,205 | ₹1,70,460 | BI01010001010000000000000515BI0100001120 |
| 9 | 1.2.4) Datamate, 12.5 kW, 3 TR, 3 Ph, 415 Vac, 50 Hz, R407C, Air Conditioning Machine at 11th Floor Server Room | 12 | Months | 14,205 | ₹1,70,460 | BI01010001010000000000000515BI0100001121 |
| 10 | 1.2.5) Datamate, 12.5 kW, 3 TR, 3 Ph, 415 Vac, 50 Hz, R407C, Air Conditioning Machine at 11th Floor Server Room | 12 | Months | 14,205 | ₹1,70,460 | BI01010001010000000000000515BI0100001122 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.73 MB
BOQ_389709.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid