Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.8 LAdmitted-Finance WZ 1043 C IIND FLOOR NANGAL RAYA NEW DELHI 110046 | NEW DELHI | NEW DELHI | DELHI | 110046 | ₹12.8 L | L1 | Admitted-Finance |
| 2 | L2₹14.1 L+₹1.4 L (10.6%)Admitted-Finance GALI NO 5 6 H NO 6 275 JHARODA MAARA EXTN PART III BURARI NEW DELHI 110084 | NEW DELHI | CENTRAL DELHI | DELHI | 110084 | ₹14.1 L+₹1.4 L (10.6%) | L2 | Admitted-Finance |
| 3 | L3₹14.3 L+₹1.6 L (12.2%)Admitted-Finance | ₹14.3 L+₹1.6 L (12.2%) | L3 | Admitted-Finance |
| 4 | L4₹14.9 L+₹2.1 L (16.7%)Admitted-Finance | ₹14.9 L+₹2.1 L (16.7%) | L4 | Admitted-Finance |
| 5 | L5₹15.0 L+₹2.2 L (17.4%)Admitted-Finance 110059 NEW DELHI NATIONAL CAPITAL TERRITORY OF DELHI 110059 | WEST DELHI | DELHI | 110059 | ₹15.0 L+₹2.2 L (17.4%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | QUALITY CONSTRUCTIONS CO L2 | M/S GR construction compony L3 | V r traders L5 | M/S AADI ENTERPRISES L1 | HIRA SINGH AND SONS L4 | ACHAL ENTERPRISES L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | M&L for Complete removal of existing treatment of wall and applying average 2 mm thick wall care putty two or more coat to get even and smooth surface and making the wall surface / Jambs/ Corners even and smooth and applying two coats of oil bound distemper over a coat a primer with fully Automatic Airless spray technology with max working pressure complete of asian or equivalent by spray gun / spray machine as per approved make list in particular specification incl one coat of primer/putty up to 8 story bldg complete all as spd and as directed.
Note:- Rate quated up to G+7 Bldg including scoffoldingall as specified and directed by Engineer-in-charge. | 3,400 | Sqm | 35 ₹1,19,000 | 30 ₹1,02,000 | 39 ₹1,32,600 | 41 ₹1,39,400 | 35 ₹1,19,000 | 29 ₹98,600 Lowest |
| 2.00 | M&L for preparation of old decorated plastered or unplastered surfaces of wall and applying one coats of oil bound distemper including preparation of old surfaces by brooming down or steel wire brushing , scraping down smoke suit , moulds, moss,efflorancr salt , trading oil and greasy spot with fully Automatic Airless spray technology with max working pressure of asian or equivalent by spray gun / spray machine as per approved make list in particular specification incl one coat of primer/putty up to 8 story bldg complete all as spd and as directed.
Note:- Rate quated up to G+7 Bldg including scoffolding complete all as specified and directed by Engineer-in-charge. | 6,400 | Sqm | 28 ₹1,79,200 | 25 ₹1,60,000 | 39 ₹2,49,600 | 21 ₹1,34,400 | 15 ₹96,000 Lowest | 19 ₹1,21,600 |
| 3.00 | M&L for preparation of old decorated plastered or unplastered surfaces of wall and applying two coats of oil bound distemper including preparation of old surfaces by brooming down or steel wire brushing , scraping down smoke suit , moulds,filling gaps wth wall care putty, with fully Automatic Airless spray technology with max working pressure of asian or equivalent by spray gun / spray machine as per approved make list in particular specification incl one coat of primer/putty up to 8 story bldg complete all as spd and as directed.
Note:- Rate quated up to G+7 Bldg including scoffolding complete all as specified and directed by Engineer-in-charge. | 7,500 | Sqm | 25 ₹1,87,500 | 20 ₹1,50,000 Lowest | 39 ₹2,92,500 | 24 ₹1,80,000 | 21 ₹1,57,500 | 29 ₹2,17,500 |
| 4.00 | M&L for preparation of old decorated previously treated surfaces of wall by brooming down scrapping down smoke and efflorescent salts etc and applying one coat of white/ Colour wash on walls with fully Automatic Airless spray technology with max working pressure of asian or equivalent by spray gun / spray machine as per approved make list in particular specification incl one coat of primer/putty up to 8 story bldg complete all as spd and as directed.
Note:- Rate quated up to G+7 Bldg including scoffoldingcomplete all as specified and directed by Engineer-in-charge. | 3,200 | Sqm | 15 ₹48,000 | 10 ₹32,000 | 9 ₹28,800 Lowest | 15 ₹48,000 | 15 ₹48,000 | 19 ₹60,800 |
| 5.00 | M&L for preparation of old decorated previously treated surfaces of ceiling by brooming down scrapping down smoke and efflorescent etc. complete and applying one coat of white wash with fully Automatic Airless spray technology with max working pressure of asian or equivalent by spray gun / spray machine as per approved make list in particular specification incl one coat of primer/putty up to 8 story bldg complete all as spd and as directed.
Note:- Rate quated up to G+7 Bldg including scoffolding complete all as specified and directed by Engineer-in-charge. | 3,000 | Sqm | 19 ₹57,000 | 5 ₹15,000 Lowest | 9 ₹27,000 | 5 ₹15,000 Lowest | 11 ₹33,000 | 19 ₹57,000 |
| 6.00 | M&L for preparation of old decorated surfaces of any description and applying one coats of cement base paint on external wall surface with fully Automatic Airless spray technology with max working pressure of asian or equivalent by spray gun / spray machine as per approved make list in particular specification incl one coat of primer/putty up to 8 story bldg complete all as spd and as directed.
Note:- Rate quated up to G+7 Bldg including scoffoldingcomplete all as specified and directed by Engineer-in-charge. | 8,500 | Sqm | 22 ₹1,87,000 | 20 ₹1,70,000 | 19 ₹1,61,500 Lowest | 21 ₹1,78,500 | 45 ₹3,82,500 | 49 ₹4,16,500 |
| 7.00 | Cutting shrubs, wild growth/trees n exc 30cm girth and removing complete vegetation growth from walls & roof incl taking out roots from roofs/brick work and making good the disturbed surface with PCC 1:2:4 type B-0, using 12.5mm graded crushed stone aggregate including treating affected area with acid wash to check further growth of vegetation and disposing off the rubbish from site (MoD Land) from the above mentioned area complete all as specified and as directed.(each job consider minimum area 8 sqm and maximum area 10 sqm) | 40 | Each Job | 400 ₹16,000 | 100 ₹4,000 | 299 ₹11,960 | 55 ₹2,200 Lowest | 100 ₹4,000 | 499 ₹19,960 |
| 8.00 | M&L for one coats of synthetic enamel paint on old steel painted surfaces including preparation of surfaces of any description not otherwise descriped over 10 cm width or grith complete all as specified and directed. | 1,200 | Sqm | 20 ₹24,000 Lowest | 25 ₹30,000 | 29 ₹34,800 | 21 ₹25,200 | 45 ₹54,000 | 29 ₹34,800 |
| 9.00 | M&L for one coats of synthetic enamel paint on old wooden painted surfaces including preparation of surfaces of any description not otherwise descriped over 10 cm width or grith of asian or equivalent by spray gun / spray machine as per approved make list in particular specification incl one coat of primer/putty up to 8 story bldg complete all as spd and as directed.
Note:- Rate quated up to G+7 Bldg including scoffolding complete all as specified and directed. | 1,100 | Sqm | 29 ₹31,900 | 30 ₹33,000 | 26.99 ₹29,689 | 21 ₹23,100 Lowest | 45 ₹49,500 | 29 ₹31,900 |
| 10.00 | M&L for prepartion of newly plastered surface of wall and applying 1 mm thick wall care putty two or more coat to get even and smooth surface (Birla white or equivalent) and applying two coats of oil bound distemper over a coat of primer with fully Automatic Airless spray technology with max working pressure complete all as specified and directed by Engineer-in-charge. | 400 | Sqm | 35 ₹14,000 | 40 ₹16,000 | 29 ₹11,600 Lowest | 32 ₹12,800 | 35 ₹14,000 | 29 ₹11,600 Lowest |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
20 Aug 2026, 6:00 pmClosed
GE North Delhi Cantt-10
GE North Delhi Cantt-10
INTERNAL AND EXTERNAL PERIODICAL SERVICES TO MD OTM ACCN IN DELHI AREA IN AOR OF AGE BR II UNDER GE NORTH DELHI CANTT 10
2026_MES_780245_1
GE/NORTH-93/2026-27
Open Tender
Civil Works
Item Rate
180 days
GE NORTH DELHI CANTT 10
As per NIT
8 documents required · 8 mandatory
₹500
Yes
GE NORTH DELHI CANTT 10
₹60,000
Yes
31 Aug 2026
23 Jul 2026
22 Aug 2026
23 Jul 2026
20 Aug 2026
6 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L for Complete removal of existing treatment of wall and applying average 2 mm thick wall care putty two or more coat to get even and smooth surface and making the wall surface / Jambs/ Corners even and smooth and applying two coats of oil bound distemper over a coat a primer with fully Automatic Airless spray technology with max working pressure complete of asian or equivalent by spray gun / spray machine as per approved make list in particular specification incl one coat of primer/putty up to 8 story bldg complete all as spd and as directed.
Note:- Rate quated up to G+7 Bldg including scoffoldingall as specified and directed by Engineer-in-charge. | 3,400 | Sqm | - | - |
| 2 | M&L for preparation of old decorated plastered or unplastered surfaces of wall and applying one coats of oil bound distemper including preparation of old surfaces by brooming down or steel wire brushing , scraping down smoke suit , moulds, moss,efflorancr salt , trading oil and greasy spot with fully Automatic Airless spray technology with max working pressure of asian or equivalent by spray gun / spray machine as per approved make list in particular specification incl one coat of primer/putty up to 8 story bldg complete all as spd and as directed.
Note:- Rate quated up to G+7 Bldg including scoffolding complete all as specified and directed by Engineer-in-charge. | 6,400 | Sqm | - | - |
| 3 | M&L for preparation of old decorated plastered or unplastered surfaces of wall and applying two coats of oil bound distemper including preparation of old surfaces by brooming down or steel wire brushing , scraping down smoke suit , moulds,filling gaps wth wall care putty, with fully Automatic Airless spray technology with max working pressure of asian or equivalent by spray gun / spray machine as per approved make list in particular specification incl one coat of primer/putty up to 8 story bldg complete all as spd and as directed.
Note:- Rate quated up to G+7 Bldg including scoffolding complete all as specified and directed by Engineer-in-charge. | 7,500 | Sqm | - | - |
| 4 | M&L for preparation of old decorated previously treated surfaces of wall by brooming down scrapping down smoke and efflorescent salts etc and applying one coat of white/ Colour wash on walls with fully Automatic Airless spray technology with max working pressure of asian or equivalent by spray gun / spray machine as per approved make list in particular specification incl one coat of primer/putty up to 8 story bldg complete all as spd and as directed.
Note:- Rate quated up to G+7 Bldg including scoffoldingcomplete all as specified and directed by Engineer-in-charge. | 3,200 | Sqm | - | - |
| 5 | M&L for preparation of old decorated previously treated surfaces of ceiling by brooming down scrapping down smoke and efflorescent etc. complete and applying one coat of white wash with fully Automatic Airless spray technology with max working pressure of asian or equivalent by spray gun / spray machine as per approved make list in particular specification incl one coat of primer/putty up to 8 story bldg complete all as spd and as directed.
Note:- Rate quated up to G+7 Bldg including scoffolding complete all as specified and directed by Engineer-in-charge. | 3,000 | Sqm | - | - |
| 6 | M&L for preparation of old decorated surfaces of any description and applying one coats of cement base paint on external wall surface with fully Automatic Airless spray technology with max working pressure of asian or equivalent by spray gun / spray machine as per approved make list in particular specification incl one coat of primer/putty up to 8 story bldg complete all as spd and as directed.
Note:- Rate quated up to G+7 Bldg including scoffoldingcomplete all as specified and directed by Engineer-in-charge. | 8,500 | Sqm | - | - |
| 7 | Cutting shrubs, wild growth/trees n exc 30cm girth and removing complete vegetation growth from walls & roof incl taking out roots from roofs/brick work and making good the disturbed surface with PCC 1:2:4 type B-0, using 12.5mm graded crushed stone aggregate including treating affected area with acid wash to check further growth of vegetation and disposing off the rubbish from site (MoD Land) from the above mentioned area complete all as specified and as directed.(each job consider minimum area 8 sqm and maximum area 10 sqm) | 40 | Each Job | - | - |
| 8 | M&L for one coats of synthetic enamel paint on old steel painted surfaces including preparation of surfaces of any description not otherwise descriped over 10 cm width or grith complete all as specified and directed. | 1,200 | Sqm | - | - |
| 9 | M&L for one coats of synthetic enamel paint on old wooden painted surfaces including preparation of surfaces of any description not otherwise descriped over 10 cm width or grith of asian or equivalent by spray gun / spray machine as per approved make list in particular specification incl one coat of primer/putty up to 8 story bldg complete all as spd and as directed.
Note:- Rate quated up to G+7 Bldg including scoffolding complete all as specified and directed. | 1,100 | Sqm | - | - |
| 10 | M&L for prepartion of newly plastered surface of wall and applying 1 mm thick wall care putty two or more coat to get even and smooth surface (Birla white or equivalent) and applying two coats of oil bound distemper over a coat of primer with fully Automatic Airless spray technology with max working pressure complete all as specified and directed by Engineer-in-charge. | 400 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
Gen93.pdf
Tender Documents • 1.27 MB
BOQ_873979.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .