| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.8 LAccepted-AOC VILL KASRIM PO HURI TEHSIL NICHAR DISTT KINNAUR H P 172118 | KINNAUR | HIMACHAL PRADESH | 172118 | 1 | Accepted-AOC Lowest rates and hence accepted for award | |
| 2 | 2₹3.2 L+₹31,860 (11.3%)Rejected-AOC VILLAGE PUJJE P O NICHAR TEHSIL NICHAR DISTT KINNAUR | NICHAR | KINNAUR | HIMACHAL PRADESH | 2 | Rejected-AOC Higher rates | |
| 3 | 3₹3.4 L+₹52,510 (18.5%)Rejected-AOC | 3 | Rejected-AOC Highest rates |
| Sl No | Description | Qty | Unit | VIMAL GOVT. CONTRACTOR L2 | SS CONSTRUCTIONS L1 | VINOD CONSTRUCTION L3 |
|---|---|---|---|---|---|---|
| 1.00Scope of Work | ||||||
| 1.01 | Providing and fixing of 02 Nos. 5-ton heavy duty chain pulley for lifting the main intake gate at the weir site, Surchoo. The work shall be carried out as per site requirements, ensuring proper installation, safety, and smooth operation of the intake gate lifting mechanism. | 1 | Job | 69,000 ₹81,420 | 60,000 ₹70,800 Lowest | 71,000 ₹83,780 |
| 2.01 | Providing and fixing U-clamps, D-shackles, and a 20 mm steel wire rope (approximately 10 meters in length) for lifting the main intake gate at Surchoo. Replacement and fixing of the damaged steel wire rope (i.e., right-side steel wire rope of 10 mm) of the damaged main intake gate.
The work includes supplying all required materials, tools, and labour, ensuring proper alignment and secure fastening of all components. Installation shall be carried out in accordance with site requirements and relevant safety standards. The steel wire rope shall be of high tensile strength to ensure durability and reliability during operation. All fittings shall be checked for proper functionality after installation, ensuring smooth, safe, and efficient operation of the intake gate lifting system for continued operational reliability. | 1 | Job | 34,000 ₹40,120 | 30,000 ₹35,400 Lowest | 36,500 ₹43,070 |
| 3.01 | Lifting of the main intake gate and carrying out all activities necessary to clear the working site for operating the gate and hoisting it to a workable height at the weir site, Surchoo, of BAP 2x2.25 MW Power House. The work includes clearing the main intake gate structure and the shingle flushing gate structure at the weir site, Surchoo, by removing boulders, debris, and tightly compacted or cemented silt, sand, boulders, and pebbles from the top of the structure down to the bottom, up to the sill beam level. All debris removal shall be done using appropriate tools and methods to prevent damage to any structural components. The entire operation shall be carried out carefully, ensuring the safety of workers, smooth functioning of the intake gate, and the continued reliability of the structure. Proper precautions shall be taken to avoid any obstruction or damage during the lifting and operational process. | 1 | Job | 54,000 ₹63,720 | 50,000 ₹59,000 Lowest | 57,000 ₹67,260 |
| 4.01 | Dismantling of the damaged coupling shaft attached to the wire rope drum by opening nuts and bolts, and transporting it to the factory for necessary replacement of the damaged coupling shaft (including manual and vehicle carriage). The work includes replacement of the damaged coupling shaft on the right side of the main intake gate, as well as replacement of the coupling flange and handle of the manually operated assembly by welding. The gate is currently difficult to operate, and its operation shall be made smooth by inspecting the gear assembly and carrying out any necessary adjustments, including proper alignment of the main intake gate.
After replacement, the coupling shaft shall be reinstalled, ensuring precise alignment of the coupling shaft, gearbox assembly, and main intake gate to guarantee smooth, safe, and efficient performance. All work shall be carried out using appropriate tools and skilled labour, ensuring operational safety, smooth functioning, and long-term reliability of the main intake gate lifting mechanism. | 1 | Job | 1,10,000 ₹1,29,800 | 1,00,000 ₹1,18,000 Lowest | 1,20,000 ₹1,41,600 |
Tender Value
₹3.0 L
EMD Value
₹3,030
Closing Date
18 Aug 2025, 4:00 pmClosed
Resident Engineer
Resident Engineer Bhaba Power House Division HPSEBL Bhabanagar
Repair, Replacement, and Restoration of Main Intake Gate and Lifting System at Weir Site, Surchoo of 2x2.25 MW BAP Kafnu Power House, including Supply and Installation of Lifting Equipment, Structural Clearing, and Coupling Shaft Replacement for Safe
2025_HPSEB_112124_1
HPSEBL/BPHD/2025-26-04
Open Tender
Repair and Maintenance Works
Item Rate
45 days
Bhabanagar Kinnaur
Please refer Tender documents.
4 documents required · 4 mandatory
₹590
₹3,030
27 Oct 2025
13 Aug 2025
19 Aug 2025
13 Aug 2025
18 Aug 2025
13 Aug 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .