Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 LAccepted-Finance | L1 | Accepted-Finance FOUND OK | |
| 2 | L2₹6.5 L+₹7,850 (1.23%)Accepted-Finance | L2 | Accepted-Finance FOUND OK | |
| 3 | L3₹6.5 L+₹7,875 (1.23%)Accepted-Finance | L3 | Accepted-Finance FOUND OK | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹6.5 L
EMD Value
₹6,500
Closing Date
4 Sept 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC BARABANKI
33/11 KV SUBSTATION BAREL BARABANKI
Testing of 33 and 11 KV Equipments installed at Various 33/11 KV Sub Stations in the area of Fatehpur Division under EE,Electy. Test Division, BBK
2023_MVVNL_825402_3
54/EDC BARABANKI/2023-24
Open Tender
Electrical Works
Fixed-rate
30 days
ETD BARABANKI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE EDC BARABANKI
₹6,500
Yes
12 Sept 2023
28 Aug 2023
5 Sept 2023
28 Aug 2023
4 Sept 2023
28 Aug 2023
Amount
Testing of 33 KV feeder Panels, Power Transformar Control Panels & 33 KV Breakers including testing of CT circuit both by Primary Injection. Work includes clearing and adjustment of relay contacts& springs checking of closing and tripping of breakers on remote/manual. Checking of protection trip command through CT (by PI) also Checking and Retrofitting Control Panels burnt wires to make tripping mechanism healthy.
Testing of 11 KV incoming & outgoing panels (VCB breakers) including testing of CT circuit both by Primary Injection,testing of relays. Workincludes clearing and adjustment of relay contacts& springs. Checking Operations and tripping of VCB on remote/manual and protection trip command generated through primary injection, also complete burnt wiring of Control pannel Where required as per site conditions and remove mechnical short comings which required at the time of testing with material
Testing of 33/11 KV 5to10 MVA Power Transformers installed at various Substation’s under ETD, Barabanki. including all related tests as – (a) No Load/ratio test, (b) Short Circuit test,(c) Magnetization current test, (d) Insulation Test. (e) Bucholz, OTI/WTI circuit testetc. including Completion of wiring where required as per site condition.
Providing tripping coils, for 33 KV Breakers and it’s installation.
Providing 03 Phase DG Set on vehicle for availability of 03 Phase supply for testing of 33/11 KV Sub Stations. Vehicle with DG set having operator will be made available for 12 hrs. in each job.
SAFELINE ELECTRICALS
P. K. POWER SOLUTIONS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .