Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance CW 545 SANJAY GANDHI TRANSPORT NAGAR NEW DELHI 110042 | NORTH | DELHI | 110042 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹6,700
Closing Date
14 Mar 2022, 3:00 pmClosed
EE(SDW)VI
WSTP Keshopur New Delhi
Servicing / Dehydration of 2000 KVA Transformer No.1 installed at 20 MGD STP Keshopur.
2022_DJB_218224_8
NIT NO. 18 (2021-2022) EE(SDW)VI
Open Tender
Miscellaneous Works
Works
30 days
WSTP Keshopur New Delhi
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
As per NIT
₹6,700
Yes
28 Mar 2022
7 Mar 2022
14 Mar 2022
7 Mar 2022
14 Mar 2022
7 Mar 2022
Disconnecting of HT supply from main HT Panel after proper switching off 11 KV VCB discharging the supply. Complete drain out of transformer oil from transformer to empty oil drum by oil machine dismantling of conservator tank all protection relays, cable, end boxes, vent pipes and other items as required. DJB-SOR-21-22 (8.2.1)
Cleaning of transformer oil tank and removing of sludge settled in the bottom with the help of vacuum pressure cleaning machine thoroughly, cleaning of core and winding of transformer with hot oil and proper safety precaution to prevent the winding damage as required, cutting of old overheated insulation of winding and reinsulation of weak point with the help of HT insulation material and proper taping etc. DJB-SOR-21-22 (8.2.2)
Checking & matching of control wiring of all protection relays and calibration of buccholz relay and protection relays testing the same. DJB-SOR-21-22 (8.2.5)
Providing & Fixing of winding protection pad. DJB-SOR-21-22 (8.2.8)
Replacement of silica gel. DJB-SOR-21-22 (8.2.4)
Replacement of top cover gasket vertical vent gasket & missing hardware to stop the oil leakage. DJB-SOR-21-22 (8.2.3)
Repair of cooling fins, replacement of cooling fins gasket and oil seal for stopping the leakage. DJB-SOR-21-22 (8.2.9)
Filling of T/oil to up to top up level as required. DJB-SOR-21-22 (8.2.7)
Dehydration & filtration of complete transformer oil and checking the side electric strength up to 50 KV at site as required. DJB-SOR-21-22 (8.2.10)
Complete assembling of transformer, cleaning of complete transformer, tightening of all connection of incoming and outgoing side and testing & checking of IR test with megger of winding & Cable of both sides with HI pot machine.DJB-SOR-21-22 (8.2.6)
Complete cleaning and chemically washing of oily and muddy transformer body and painting of transformer with enamel paint. DJB-SOR-21-22 (8.2.11)
Devraj Enterprises
M.B. Enterprises
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .