Loading…
Loading…
Tender Value
₹56.2 L
EMD Value
₹1.3 L
Closing Date
30 Sept 2026, 5:00 pm3d left
GM-CIVIL
Main Administrative Building Sector-6 Noida
M/o Road (Repair of Garbage Collection Points in Sector-67 and Sec.-68) Noida.
2026_NOIDA_1179427_1
125/GM/SM(WC-05)/2026-27
Open Tender
Civil Works
Fixed-rate
90 days
NOIDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,832
NOIDA
₹1.3 L
30 Sept 2026
24 Aug 2026
1 Oct 2026
24 Aug 2026
30 Sept 2026
24 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres. | 1,455 | sqm | 82.38 | ₹1,19,862.9 |
| 2 | Construction of granual sub-base by providing close graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 | 305 | cum | 4,093.5 | ₹12,48,517.5 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :- 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 146 | cum | 5,746.88 | ₹8,39,044.48 |
| 4 | Centring and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. | 66 | sqm | 181.64 | ₹11,988.24 |
| 5 | Providing and laying C.C. pavement of mix M-25 with ready mixed concrete from batching plant. The ready mixed concrete shall be laid and finished with screed board vibrator , vacuum dewatering process and finally finished by floating, brooming with wire brush etc. complete as per specifications and directions of Engineer-incharge. (The panel shuttering work shall be paid for separately). (Note:- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/ recoverable separately). | 218 | cum | 8,141.85 | ₹17,74,923.3 |
| 6 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 248 | cum | 120.55 | ₹29,896.4 |
| 7 | Supply of Mobile Hydraulic Crane 35 Tonne Capacity (173 H) | 56 | Per Hour | 2,648.22 | ₹1,48,300.32 |
| 8 | Supply of JCB (3D) complete at site on hire charges basis including fuel & driver etc. complete in all respect as per direction of Engineer-in-charge. | 7 | Per day | 8,130.5 | ₹56,913.5 |
| 9 | Supply of Tractor Trolley on hire charges including fuel & lubricant charges operator and all T&P etc. as required | 7 | Per day | 1,858 | ₹13,006 |
| 10 | Supply of Sweeper with necessary T&P as per direction of Engineer-in-charge. | 28 | Per day | 1,009.81 | ₹28,274.68 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
BOQ_2217629.xls
BOQ • 0.28 MB
Capability.xls
Additional Documents • 0.04 MB
TD.pdf
Tender Documents • 12.91 MB
125a.pdf
PDF • 0.20 MB
125.pdf
PDF • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .