Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
9 Jul 2026, 2:15 pm
UNDER FRAME (LWLRRM PP)
02261606
02261606
Open - Indigenous
Chennai, Unknown (Unspecified Location)
₹0
₹1.7 L
9 Jun 2026
9 Jun 2026
Description :UNDERFRAME COMPLETE FOR LWLRRM AMRIT BHARAT COACHES TO DRG. NO.LP11103, ALT d, ANX 9 WITHOUT ITEM 30 TO DRG. NO.1.11012.0.03.095.001 WITH ADDITIONAL BRACKETS TO DRG NO 53811115, Alt 'a'. THE MANUFACTURING FACILITY AS PER ICF/MD/SPEC-147, ISSUE STATUS-0 1, REV-02 WITH AMENDMENT No.'02'. Special Condition : THE UNDERFRAME SHOULD BE SUPPLIED AS NORMAL SIDE UP AND SIDE BEARER SIDE DOWN. PACKING CONDITION AS PER DRG NO. ICF/J&T/MISC- 2487, Alt 'b'. STAGE INSPECTION DETAILS. (a) Raw Material Stage # Ensure the raw material used usin g portable spectrometer (b) Jig stage # Assembly of front part with sole bar. # Assembly of modular fr ame arrangement. # Weld parameters to be checked & recorded (c) Trestle stage # Marking, Drilling & Tapping of holes wherever necessary. # Marking & placing of detail items. # Complete welding whe rever necessary. # Weld parameters to be checked & recorded # Assembly & Welding of trough sheet s. # Dimensional & Visual checks. # Punching of Serial No & ensuring proper traceability. (d) Surface p reparation and painting stage. # Short/Sand blast to the requirements. # Painting process as per the s pecification. # Visual inspection. # Final product Inspection. Note: Application of Aluminium welding co at to RCF spec MDTS-28272 latest revision on top surface of cross members shall be ensured before w elding the trough floor with cross members to avoid bi-metallic corrossion.[SAFETY ITEM] [ Warranty Period: 30 Months after the date of delivery ] [Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitt ed: Max 8 lacs ] ] Consignee LHB DEPOT/ICF,Chennai, ICF Tamil Nadu 5.00 Numbers UVAM Item ref. ( Item Id :- 2400018 - Under Frame Complete for LHB Coaches , Sub Item Id:-2400018001 - Under Frame Complete for LHB Coaches ) Product Inspection:Stage 1: Raw Material Stage (Ref. Description) (100% of PO Qty ), Inspection Stage 2: Jig stage (Ref. Description) (100% of PO Qty ), Stage 3: Trestle stage (Ref. Details Description) (100% of PO Qty ), Stage 4: Surface preparation and painting stage(Ref.Descri) (100% of PO Qty )
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
5788793.pdf
ATTACHMENT
5788795.pdf
ATTACHMENT
5788894.pdf
ATTACHMENT
5788872.pdf
ATTACHMENT
5788890.pdf
ATTACHMENT
5788879.pdf
ATTACHMENT
5788882.pdf
ATTACHMENT
5788887.pdf
ATTACHMENT
5788876.pdf
ATTACHMENT
Download all tender documents and submit your bid