Loading…
Loading…
Tender Value
₹7.6 L
EMD Value
₹15,200
Closing Date
24 Aug 2026, 4:00 pmDue today
Er Rajesh Kumar
Executive Engineer PWD R and B Division Basohli
Please refer in BOQ
2026_PWDJK_320816_2
e-NIT No. 63 of 2026-27 dated 12-08-2026
Open Tender
Civil Works
Percentage
90 days
Basohli
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD R and B Division Basohli
₹15,200
Executive Engineer PWD R and B Division Basohli
13 Aug 2026
13 Aug 2026
25 Aug 2026
14 Aug 2026
24 Aug 2026
15 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables, etc. (not exceeding 1.5m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5m including getting out excavated earth and disposal of surplus excavated earth as directed lead upto 1mtr. from cutting edge. a) All kinds of soil. | 49.32 | cum | 479.3 | ₹23,639.08 |
| 2 | Providing and laying cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: a) 1:5:10 (1 cement:5 coarse sand:10 graded stone aggregate 40mm nominal size). | 3.31 | Cum | 4,826.5 | ₹15,975.72 |
| 3 | Providing and laying cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: a) 1:3:6 (1 cement:3 coarse sand:6 graded stone aggregate 20mm nominal size) | 38.74 | Cum | 5,733.6 | ₹2,22,119.66 |
| 4 | Dumping stones in horizontal i.e. on level including cost of stones. | 9.69 | Cum | 937.9 | ₹9,088.25 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centring ,shuttering, finishing and reinforcement. All work upto plinth level with: a) 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 2.29 | Cum | 7,104.35 | ₹16,268.96 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete above plinth level: a) Thermo-Mechanically Treated bars of grade Fe-500D or more. | 229 | Kg | 123.2 | ₹28,212.8 |
| 7 | Brick work with common burnt clay (non modular) bricks of class designation 7.5 in foundation and plinth including curing in cement mortar 1:6 (1 cement:6 coarse sand). | 18.16 | Cum | 7,571.55 | ₹1,37,499.35 |
| 8 | Extra for brick work with common burnt clay bricks / cement concrete bricks in superstructure above plinth level upto floor five level. | 18.16 | Cum | 1,455.65 | ₹26,434.6 |
| 9 | Centering and shuttering including strutting, propping etc.and removal of form work for : a) Foundation, footings, bases of columns etc. for mass concrete. | 139.96 | Sqm | 286.35 | ₹40,077.55 |
| 10 | 15mm Cement plaster on the rough side of single or half brick wall of mix: a) 1 : 6 ( 1 cement : 6 fine sand) | 100.37 | Sqm | 306.85 | ₹30,798.53 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
BOQ_1068138.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].