Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAdmitted-Finance | ₹4.8 L | L1 | Admitted-Finance |
| 2 | L2₹4.8 LAdmitted-Finance | ₹4.8 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | P MURUGAN L1 | DEVRIKASH L2 |
|---|---|---|---|---|---|
| 1.00Construction of New Girls Toilet at E Perumalpatti villlage in Elumalai Town panchayat | |||||
| 2.00 | Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20 B Hard soil | 26.93 | m3 | 263.28 ₹7,090.13 | 263.28 ₹7,090.13 |
| 3.00 | Filling in Basement with excavated Earth in layers of not more than 15cm. Thick well rammed, watered and consolidated complying with standard specifications etc., complete. | 1.05 | m3 | 45.85 ₹48.14 | 45.85 ₹48.14 |
| 4.00 | Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete., | 2.99 | m3 | 5,932.47 ₹17,738.09 | 5,932.47 ₹17,738.09 |
| 5.00 | Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications. Rate for 10m3 | 15.88 | m3 | 6,339.2 ₹1.0 L | 6,339.2 ₹1.0 L |
| 6.00 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle | 47.47 | m3 | 547.5 ₹25,989.83 | 547.5 ₹25,989.83 |
| 7.00 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS | 0.38 | m3 | 92,011.36 ₹34,964.32 | 92,011.36 ₹34,964.32 |
| 8.00 | Reinforcement Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering | 6.24 | m3 | 9,857.22 ₹61,509.05 | 9,857.22 ₹61,509.05 |
| 9.00 | Supplying and painting the walls with two coats of wall putty as instructed by the deparmental officers including all charges etcFinishing the exposed surface of RCC item of work such as slabs, beams, sunshade, facia, canopy slab, staircase waist slab, landing slab etc., with CM 1:3, 10mm thick. including raking the surface. The rate is to include the cost of providing cement morta | 6.42 | m3 | 293.28 ₹1,882.86 | 293.28 ₹1,882.86 |
| 10.00 | Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2. | 77.25 | m3 | 291.13 ₹22,489.79 | 291.13 ₹22,489.79 |
Tender Value
₹4.8 L
Closing Date
13 Jan 2026, 3:00 pmClosed
BDO BP
Sedapatti
Construction of New Girls Toilet at E Perumalpatti villlage in Elumalai Town panchayat
2026_RDTN_641356_1
01(01)/SED/VVVT/2025-2026
Open Tender
Civil Works - Buildings
Sedapatti
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
20 Jan 2026
12 Jan 2026
13 Jan 2026
12 Jan 2026
13 Jan 2026
12 Jan 2026
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
BOQ_768135.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid