Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.2 LAccepted-AOC | L1 | Accepted-AOC Found lowest one bidder | |
| 2 | L2₹11.9 L+₹67,175 (5.97%)Rejected-AOC 01 THIKSEY THIKSEY LEH LEH JAMMU KASHMIR 194101 | LEH LADAKH | LADAKH | 194101 | L2 | Rejected-AOC Quoted high rate as compared to L1 | |
| 3 | L3₹12.7 L+₹1.4 L (12.8%)Rejected-AOC STAKMO | L3 | Rejected-AOC Quoted high rate as compared to L1 | |
| 4 | L4₹13.0 L+₹1.8 L (15.9%)Rejected-AOC | L4 | Rejected-AOC Quoted high rate as compared to L1 |
Tender Value
₹14.5 L
Closing Date
10 Aug 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
rural engineering wing leh
Revised Construction of solid waste management centre thiksey B
2022_RDD_7128_7
NIT 20 - UTL REWL OF 2022-23
Open Tender
Civil Works - Others
Item Rate
60 days
Leh
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Payable To Executive Engineer
Exempted
8 Sept 2022
26 Jul 2022
12 Aug 2022
26 Jul 2022
10 Aug 2022
26 Jul 2022
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 1 Osqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in: All kinds of soil
Random Rubble masonry withhard stone from qyarry infoundation and plinth including leveling up with cement concrete1:6:12 (1 Cement: 6 coarse sand: 12 graded stone aggregate20mm nominal size) upto plinth level with
Providing and laying damp-proof course 5Crnm thick with cement concrete 1:2:4 (1 cement : 2 co.:Hse sand 4 graded stone aggregate 20mm nominal size
Providing and fixing upto floor five level precast cementconcrete solid blocks including hoisting and setting inposition with cement mortar 1:3 (1 cement : 3 coarsesand), cost of required centering, shuttering and complete1:3:6 (1 cement: 3 coarse sand: 6 gradedstone aggregate 20mm nominal size
Steel work in built up tubular round, square or rectangular including cutting , hoisting , fixing in position and applying a priming coat of approved steel primer including welding and bolting with special shaped washers etc.complete. Hot finished welded type tubes
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutmen"ts, posts ans sturts, etc. upto floor five level excluding cost of centring, shuttering, fmishing and reinforcement1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20mm nominal size)
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars
Centring and shuttermg including strutting, propping etc. and removal of form for• Columns, Pillars, Piers, Abutments, Posts and Struts
carriage of cement and steel from 20km by mt
carriage of stone from 7km by mt
carriage of sand and aggregate from 7km by mt
M/S DORJAY NAMGIAL GOVT CONTRACTOR
M/S SONAM WANGMO
M/S JAVED IQBAL GOVT CONTRACTOR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .