Tender Value
₹52.3 L
EMD Value
₹1.0 L
Closing Date
9 Apr 2025, 5:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
TENDER SEC
17 conditions · 4 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
12 conditions · 1 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Refer Tender conditions in the uploaded tender document. In case of any discrepancies GCC April 2022 & correction slips upto date will prevail.
Signal & Telecom work in connection with Madurai Division- FS+TWS+WCMSC-66 sets, FS+TWS+CMSC-19 sets, CS+CMSC-15 sets & Standardization of formation work in various sections. (SSE/Sig/DG, SSE/Sig/N/MDU, SSE/Sig/S/MDU, SSE/Sig/VPT, SSE/Sig/TEN).
U-SG-13-2024-25-3
U-SG-13-2024-25-3
Open
Works - General
9 Months
Madurai, Tamil Nadu
₹0
₹1.0 L
9 Apr 2025
14 Mar 2025
56 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 49,18,304.82 | ||
| — | 9000.00 | — | — | ||
| Excavation of cable trench in all kinds of soil except hard rocky areas including clearing of roots of trees, rocks, bushes etc. to a depth of 1.0 Mtrs and to a width of 0.3 Mtrs. (Laying of cables is not included in this schedule) | — | — | — | 5,76,900 | |
| — | 8000.00 | — | — | ||
| Placing of one row of country bricks of size approximately 220mm x 100mm x 60mm breadth wise horizontally above the cables in 0.3m width trench.[Country bricks of size 220mm x 100mm x60 mm (approximately) shall be supplied by the Contractor]. | — | — | — | 5,03,920 | |
| — | 16000.00 | — | — | ||
| Laying o f signaling/power/ telecommunication cables a s p e r cable plan in cable trenches, masonry ducts, RCC Pipes, DWC pipes, GI Pipes etc.(Supply of cables is not included in this schedule). | — | — | — | 2,90,880 | |
| — | 9000.00 | — | — | ||
| "Refilling of cable trench 1m depth by 0.3m width throughout, with earth after laying of cables, and consolidating the trench by ramming and levelling." | — | — | — | 1,38,600 | |
| — | 300.00 | — | — | ||
| Supply of RCC cable markers (Supply of RCC cable markers a s p e r drawing No.CSTE/CN/OFC/1. T h e lettering o n the cable marker shall be "SIG" / "TELE" / "OFC" as p e r the instructions of Railway representative at site.) as per drawing enclosed | — | — | — | 78,795 | |
| — | 300.00 | — | — | ||
| "Digging of pit to a depth of 800mm of size 300mmX300mm, casting o f concrete foundation o f s i z e 300mmX300mmX300mm and Placing of RCC cable markers on top of the foundation and refilling the pit and consolidating it by ramming. The cable markers shall be provided at an interval of 20 Mtrs. within station limits and 5 0 Mtrs. outside station limits throughout the cable route, diversions and also at every track/road crossing." | — | — | — | 37,005 | |
| — | 250.00 | — | — | ||
| "Road crossing/ Track Crossing through Horizontal Drilling at approximately depth of 1.5 to 2m below the formation level of the earth including insertion of HDPE pipe/DWC pipe along with couplers, drawl of cable (or) direct drawl o f cables etc. (Note: The pilot used for HDD should be of sufficient size to suit insertion of HDPE /DWC pipe of size 120mm (outer dia.) or direct drawl of three cables (Signalling/Power/Quad/OFC) or three nos.of 40mm dia HDPE pipe or any other combination as directed by the site engineer) ( Supply of HDPE pipe is not covered in this schedule)" | — | — | — | 3,37,862.5 | |
| — | 75.00 | — | — | ||
| Supply of GI pipes - 50mm dia -3.65mm thick as per Technical specification | — | — | — | 34,341 | |
| — | 175.00 | — | — | ||
| Supply of GI pipes - 100mm dia-4.5mm thick as per Technical specification | — | — | — | 1,95,853 | |
| — | 150.00 | — | — | ||
| Provision of GI pipes (50/100mm dia) for cable laying in hard rocky area with off sets at both ends duly supported by concrete blocks of size 300mm x 300 mm x 300 mm at an interval of 2m. The ends of the pipes shall b e closed with brick masonry abutments work so that no cable is exposed, The work shall be carried out as per the instructions of Railway representative at site.(Supply of GI pipes with couplings and laying of cables is not included in this schedule).[Stone jelly of size 20/25mm, bricks, sand, cement, and all other miscellaneous materials required for the work shall be supplied by the Contractor]. | — | — | — | 27,430.5 | |
| — | 100.00 | — | — | ||
| Provision of GI pipes (50/100mm dia) for cable laying with offset at both ends and with couplings over RCC bridges, drainage, culverts, and girder bridges. For RCC bridges, drainage, and culverts, the pipes shall be mounted on concrete masonry supports of size 300mm x 300mm x 300mm at an interval of 2 meters. For girder bridges, the pipes shall be fixed on suitable MS clamps at an interval of 2 meters. The ends of the pipes shall be closed with brick masonry abutments to ensure that no cable is exposed. The work shall be carried out as per the instructions of the Railway representative at the site.(Supply of GI pipes with couplings and laying of cables is not included in this schedule).Stone jelly (20/25mm size), bricks, sand, cement, MS angles, flats, bolts, nuts for manufacturing and fixing clamps, bricks, M sand, cement, and other miscellaneous materials for the work shall be supplied by the contractor. | — | — | — | 20,854 | |
| — | 92.00 | — | — | ||
| Excavation of pit, erection o f cable termination boxes on rails and concreting as per Drg. No.SG/CN/02/8, drilling of suitable holes in the box, fixing of 2 Nos. of GI pipes 32mm dia and 300mm long at the bottom with clamp nuts - 12 mm thick, one at the inner side and another at the outer side for each pipe for cable entry and one GI pipe 150mm long 32mm dia for drawl of jumper wires for Point machines etc., fixing of hardwood plank 37mm thick on the bottom, provision of one EWS lock, and painting the boxes inside and outside with o n e coat of red-oxide a n d t w o coats of aluminium paints. | — | — | — | 4,62,731.48 | |
| — | 92.00 | — | — | ||
| Installation of combined type point machine-IRS t y p e a n d connecting a l l ground connections including wiring and termination in point machine and interconnections between point machine and CT box through PVC hose pipe with 3/0.75mm and 7/1.40mm copper wire and painting. This work includes provision of insulation to stretcher bars, throw bar lug and "D" bracket wherever required, cutting of notches on the point machines covers to suit crank handle configuration. (Combined type point machine with ground connection, uninsulated stretcher bar, throw bar lug and 'D' brackets will be supplied by Railways.[All types of insulations connected to point work, coal bengal, all type of bolts and nuts, washers spring/flat wire P V C 7/1.4mm copper, P V C hope pipe, paints, PVC/nylon sleeves and all other miscellaneous materials required for the work shall be supplied by the Contractor]. | — | — | — | 15,07,316.96 | |
| — | 10.00 | — | — | ||
| "Excavation of pit, casting concrete foundation and erection of apparatus case half size as per Drg, No.SG/CN/02/7, fixing one 'E' type lock for the front door and latching arrangement for the back door, and fixing of one hardwood shelf plank 37mm thick and painting the apparatus case inside and outside with one coat of red-oxide and two coats of aluminium paints.(Supply of apparatus case is not included in this schedule).[Foundation bolts and nuts, cement, 'E' type locks, M sand, stone jelly of size 20/25mm,37mm hard wood planks, latching ""arrangements, paints, varnish, fixing bolts & nuts and all other miscellaneous materials required for the work shall be supplied by the Contractor]""" | — | — | — | 87,870.4 | |
| — | 10.00 | — | — | ||
| Provision of earth electrodes as per drawing No.SG/CN/02/13 and earthing of metallic sheath and armour of all cables in all apparatus cases, relay room, equipment room, SM's room for block and control, and earthing of all equipments in apparatus cases, power room, relay rack, cable termination rack, control panel, signals, lever frames with MS flat 35mm X 6mm/19c cable (MS flat for closer by areas and MS flat/19c cable combination for farther areas) as per the instructions of Railway representative at site. The work includes painting of earth resistance value on the earth pit. (Supply of 19C cable is not covered in the scope of this schedule). [MS flat for earthing 35mm X 6mm, cement, GI earth electrodes, common salt, charcoal, country bricks, M sand, soldering materials and all other miscellaneous materials required for the work shall be supplied by the Contractor]. | — | — | — | 17,075.5 | |
| — | 290.00 | — | — | ||
| Termination of main, tail, Signaling and power cables and internal wiring on terminal/ fuse blocks i n n e w apparatus cases, cable termination boxes a n d i n gate Lodges excluding cable termination rack at relay room. The work includes fixing of all new cables by teakwood clamp on teakwood base plank, fixing of Phynolic synthetic industrial fibre base fine weave cotton fibre board 6mm thick for terminal board to suit each apparatus case, varnishing all teakwood items, fixing of terminals/ fuse blocks on the terminal board, drilling of necessary holes, termination of cables, wiring, identification o f cables using aluminium tags with letters punched neatly, as p e r approved circuit diagram and cable plan, painting of particulars on sleeves andalso o n the inner side o f the doors of apparatus cases. After terminations are "over, the side openings of apparatus case foundation shall be closed with brick work, cement plastered, the inter-space filled with M sand up to base level and the bottom surface shall be sealed with sealing compound.(Supply of PBT terminals and Fuse blocks is not covered in this schedule)." a)Termination on 25/60mm PBT terminals (new location)(Phynolic sheet) (Per Unit = Per Terminal block) | — | — | — | 49,920.6 | |
| — | 100.00 | — | — | ||
| Termination of main, tail, Signaling and power cables and internal wiring on terminal/ fuse blocks i n n e w apparatus cases, cable termination boxes a n d i n gate Lodges excluding cable termination rack at relay room. The work includes fixing of all new cables by teakwood clamp on teakwood base plank, fixing of Phynolic synthetic industrial fibre base fine weave cotton fibre board 6mm thick for terminal board to suit each apparatus case, varnishing all teakwood items, fixing of terminals/ fuse blocks on the terminal board, drilling of necessary holes, termination of cables, wiring, identification o f cables using aluminium tags with letters punched neatly, as p e r approved circuit diagram and cable plan, painting of particulars on sleeves andalso o n the inner side o f the doors of apparatus cases. After terminations are "over, the side openings of apparatus case foundation shall be closed with brick work, cement plastered, the inter-space filled with M sand up to base level and the bottom surface shall be sealed with sealing compound.(Supply of PBT terminals and Fuse blocks is not covered in this schedule)." b)Termination on PBT fuse block (new location) (Phynolic sheet)(Per Unit = Per Fuse block) | — | — | — | 20,993 | |
| — | 100.00 | — | — | ||
| Termination of new main/tail cables on the existing terminals/ fuse blocks in apparatus cases/ battery boxes/ CT boxes/ cable termination racks as per approved circuit diagram. The terminal particulars a r e to be repainted /corrected o n t h e doors of apparatus cases/ battery boxes/ cable termination boxes and FTOT index board as instructed by Railway representative at site. This work includes closing the opening created for entry of new cables in the apparatus cases with masonry brick work and sealing the bottom of the apparatus cases/ cable termination racks with cable compound. [Paints, wire PVC 3/0.75mm and 16/0.2mm copper, sealing compound, bricks, cement, M sand and all other required miscellaneous materials shall be supplied by the contractor].(Per Unit = Per Terminal block) | — | — | — | 7,359 | |
| — | 92.00 | — | — | ||
| Dismantling a n d releasing o f existing Point machines (all types) including ground connections and other accessories available complete without any damage to the gadgets, accounting and stacking them neatly at a place as instructed by Railway representative at site. | — | — | — | 2,48,279.48 | |
| — | 60.00 | — | — | ||
| Protectio n adjustments a n d re-instating of S&T gears by deputation of Helpers/Unskilled Labour for executing additional S & T portion o f t h e works. The work can involve fixing, releasing, dismantling, replacement,excavation, clearing of vegetation, loading and unloadingof material and assisting skilled persons etc as per instruction of Railway representative. | — | — | — | 50,855.4 | |
| — | 60.00 | — | — | ||
| Protection, adjustm e nt a n d reinstating of S&T g e a r s b y d e p u t a t i o n of Fitter/Wireman/Painter/Welder/ Mason/Cable Jointer (Skilled Labour or Technician ) etc., for executing additional S&T portion of works. T h e work c a n involve fixing, releasing, dismantling, replacement, painting or alteration of various signallilng assets or parts, termination of cables, minor patch work on damages at location box, Plastering, Concreting brick work, wiring alterations, cable jointing etc as per instruction of Railway representatives at size. | — | — | — | 64,407 | |
| — | 2100.00 | — | — | ||
| Transportation o f Signalling materials by road a s p e r t h e instructions o f Railway representative at site. The work also includes loading and unloading of the materials a)Transportation of Signalling materials upto 100kms | — | — | — | 47,775 | |
| — | 8000.00 | — | — | ||
| Transportation of Signalling materials more than 100km | — | — | — | 1,11,280 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .