Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.3 CrAdmitted-Finance | -18.88% | ₹3.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹6.3 CrAdmitted-Finance | +71.00% | ₹6.3 Cr | L2 | Admitted-Finance |
Tender Value
₹4.1 Cr
EMD Value
₹8.1 L
Closing Date
11 Jun 2026, 6:00 pmClosed
Unit Head
RIICO AJMER
Upgradation of Infrastructure at industrial area Bijaynagar. amounting to Rs. 406.06 lakh
2026_RIICO_561999_1
2026/Ajmer/39610/1144
Open Tender
Civil Works
Percentage
240 days
Bijaynagar
please refer bid documents
5 documents required · 5 mandatory
₹5,900
Through SSO ID of Contractor
₹8.1 L
Ajmer
25 Jun 2026
23 May 2026
12 Jun 2026
23 May 2026
11 Jun 2026
23 May 2026
3 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Silt clearence of drains,channels and canals with lift 1.5 mtr and lead up to 50 mtr | 1,285.2 | CUM | 70 | ₹89,964 |
| 2 | Add extra rate for quantities of works executed In or under water and or liquid Mud/Marshy soil. | 1,285.2 | mtr depth | 14 | ₹17,992.8 |
| 3 | Add extra rate for quantities of works executed In or under foul position, including pumping out water as required | 1,285.2 | mtr depth | 17.5 | ₹22,491 |
| 4 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge:, In cement mortar. | 4,284 | cum | 641 | ₹27,46,044 |
| 5 | Recover cost of useful stone @ 2/3rd of masonry work dismantled quantity. | 2,856 | cum | 575 | ₹16,42,200 |
| 6 | Carriage of material Building Rubbish Stone metal (Grit and ballast etc.) For 10 Km. | 1,428 | cum | 165 | ₹2,35,620 |
| 7 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the em | 1,523.2 | cum | 31 | ₹47,219.2 |
| 8 | Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 305.3.4 as per MoRTH Specific | 2,856 | cum | 31 | ₹88,536 |
| 9 | carriage Earth, sand, lime,morrom manure or sludge for 10km. Qty as per item no. 3.5.iii and 3.7 | 4,379.2 | cum | 79.55 | ₹3,48,365.36 |
| 10 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level., 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 761.6 | cum | 3,302 | ₹25,14,803.2 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
TDbijaynagar.pdf
Tender Documents • 0.76 MB
BOQ_1000039.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].