Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.0 CrAdmitted-Finance | ₹29.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹34.9 Cr+₹5.9 Cr (20.2%)Admitted-Finance IIIRD B2 FLAT NO 8 IIND FLOOR NEHRU NAGAR GZB 201001 U P | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201001 | ₹34.9 Cr+₹5.9 Cr (20.2%) | L2 | Admitted-Finance |
| 3 | L3₹35.4 Cr+₹6.4 Cr (21.9%)Admitted-Finance | ₹35.4 Cr+₹6.4 Cr (21.9%) | L3 | Admitted-Finance |
| 4 | L4₹36.4 Cr+₹7.4 Cr (25.6%)Admitted-Finance | ₹36.4 Cr+₹7.4 Cr (25.6%) | L4 | Admitted-Finance |
| 5 | L5₹37.7 Cr+₹8.7 Cr (30.0%)Admitted-Finance | ₹37.7 Cr+₹8.7 Cr (30.0%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MS K.C ANGAMI and SONS CONSORTIUM L5 | Vertex Construction L8 | M/S NITHINSAI CONSTRUCTIONS L7 | Mayasheel Ventures Limited L2 | M/s Affluent Enterprises and Services L1 | Hardayal Constructions and Projects LLP L6 | BCC BUILDTECH PRIVATE LIMITED L3 | REGAL ENTERPRISES L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Construction of 2-laning with Paved/ Hard Shoulder of Peren-Dimapur road section on NH-129A from design km 120.320 to design km 123.200 (Design length: 2.88 km in Peren town) in the State of Nagaland on EPC Mode under NH (O)-TSP (Package-1A) | 1 | Nos. | 37,70,44,500 ₹37,70,44,500 | 40,48,80,050 ₹40,48,80,050 | 38,96,91,999 ₹38,96,91,999 | 34,86,00,000 ₹34,86,00,000 | 28,99,99,999 ₹28,99,99,999 Lowest | 38,65,10,000 ₹38,65,10,000 | 35,36,12,070 ₹35,36,12,070 | 36,43,20,000 ₹36,43,20,000 |
Tender Value
Refer Docs
EMD Value
₹50 L
Closing Date
27 Jan 2025, 3:00 pmClosed
AK Jha
NHIDCL HQ New Delhi
Construction of 2-laning with Paved Hard Shoulder of Peren-Dimapur road section on NH-129A in Peren town in the State of Nagaland on EPC Mode under NH (O) (Package-1A)
2024_NHIDC_830311_1
NHIDCL/Nagaland/Civil Work/Peren Town/Pkg-1A/
Open Tender
Civil Works
EPC Contract
730 days
Nagaland
Please refer Tender documents.
5 documents required · 5 mandatory
₹11,800
MD NHIDCL
₹50 L
NHIDCL HQ New Delhi
21 Mar 2025
10 Oct 2024
28 Jan 2025
10 Oct 2024
27 Jan 2025
18 Nov 2024
10 Oct 2024 - 28 Oct 2024
30 Oct 2024
Amount
Construction of 2-laning with Paved/ Hard Shoulder of Peren-Dimapur road section on NH-129A from design km 120.320 to design km 123.200 (Design length: 2.88 km in Peren town) in the State of Nagaland on EPC Mode under NH (O)-TSP (Package-1A)
Mayasheel Ventures Limited (BID ID -3162311)
BCC BUILDTECH PRIVATE LIMITED (BID ID -3125050)
REGAL ENTERPRISES (BID ID -3151735)
MS K.C ANGAMI and SONS CONSORTIUM (BID ID -3124561)
Hardayal Constructions and Projects LLP (BID ID -3161941)
M/S NITHINSAI CONSTRUCTIONS (BID ID -3162380)
Vertex Construction (BID ID -3161151)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .