| 1 | L1₹6.8 LAccepted-AOC | ₹6.8 L Quoted ₹7.0 L | L1 | Accepted-AOC Reasonable quote |
| 2 | L2₹7.1 L+₹8,081 (1.15%)Rejected-AOC | ₹7.1 L+₹8,081 (1.15%) | L2 | Rejected-AOC Not L1 Bidder |
| 3 | L3₹7.3 L+₹31,475 (4.50%)Rejected-AOC | ₹7.3 L+₹31,475 (4.50%) | L3 | Rejected-AOC Not L1 Bidder |
| 4 | L4₹7.5 L+₹48,816 (6.97%)Rejected-AOC | ₹7.5 L+₹48,816 (6.97%) | L4 | Rejected-AOC Not L1 Bidder |
| 5 | L5₹7.6 L+₹60,540 (8.65%)Rejected-AOC | ₹7.6 L+₹60,540 (8.65%) | L5 | Rejected-AOC Not L1 Bidder |
Tender Value
₹7 L
EMD Value
₹14,000
Closing Date
12 Jun 2019, 6:00 pmClosed
GE JORHAT
GE Jorhat
REPAIR/CLEANING OF SEPTIC TANKS,SEWAGE LINE,MANHOLE SERVICES AND WATER TANK AT MARIANI UNDER GE JORHAT.
2019_MES_253741_1
8907/B/E8
Open Tender
Civil Works
Item Rate
270 days
JORHAT
AS per NIT
4 documents required · 4 mandatory
₹500
GE JORHAT
₹14,000
Yes
29 Jul 2020
22 May 2019
17 Jun 2019
23 May 2019
12 Jun 2019
31 May 2019
23 May 2019 - 25 May 2019
Amount
Supply and fix in repair PVC SWR Nahani/ Floor trap plain with grating including jointing with solvent cement, dia of outlet 75 mm, water seal minimum 75 mm, complete all as specified and directed by Engineer in charge.
Supply and fix in repair PVC SWR Nahani/ Floor trap, multi inlet connection, plain with grating including jointing with solvent cement, dia of outlet 75 mm, water seal minimum 50 mm, complete all as specified and directed by Engineer in charge.
M & L in repair for PVC (SWR ) gully trap 125/110 mm with grating or without grating and jointing with solvent cement and fixed in position complete all as specified and directed including cement concrete M15 (Nominal Mix) using 20 mm nominal size graded crushed stone aggregate complete all as specified and as directed.
Dismantling PVC(SWR) Pipes 75/110mm bore fixed to wall/laid in trenches including all fittings such as bends, tees etc complete all as specified and as directed.
S & F PVC-U, type B as per IS 13592: 2013 single socketed soil waste pipes in any length with rubber ring joints, 110 mm dia, laid in trenches complete all as specified and directed by Engineer- in- charge .
S & F PVC-U, type B as per IS 13592: 2013 single socketed soil waste pipes in any length with rubber ring joints, 75 mm dia, laid in trenches complete all as specified and directed by Engineer- in- charge .
S & F UPVC bends without inspection door (any angle), 110 mm dia conforming to IS 14735: 1999 complete all as specified and directed by Engineer- in- charge
S & F UPVC bends without inspection door (any angle), 75 mm dia conforming to IS 14735: 1999 complete all as specified and directed by Engineer- in- charge
S & F unplasticized PVC pipes as per IS 4985: 2000, of class 5, working pressure PN 10 (1 Mpa), plain or socket ended and nominal size 50 including all fittings and fixtures fixed to walls ceiling or in floors with elastomeric sealing ring joints complete all as specified and as directed.
S & F PVC-U, type B as per IS 13592: 2013 single socketed soil waste pipes in any length with rubber ring joints, 75 mm dia, fixed to walls complete all as specified and directed by Engineer- in- charge .
M & L for rendering 15 mm thick on fair face of brick wall or concrete surface in cement mortar1:4 mixed with WPC @ 3% (or as per manufaturers instruction) finished even and smooth without using extra cement, complete all as specified and as direted. (Note : WPC shall be measured and paid respective item of SchA/BOQ)
M&L for 15mm thick rendering in cement mortar (1:4) on other than fair faces of brickwork or concrete surfaces and finishing the surface even and smooth without using extra cement complete all as specified and as directed.
M & L for rendering 15 mm thick on fair face of brick wall or concrete surface in cement mortar1:6 finished even and smooth without using extra cement, complete all as specified and as direted.
Dismantling water tanks capacity exceeding 500 litres but not exceeding 1000 Litres and removing to store complete all as specified and as directed.
S & F rotational moulded polyethylene double layer water tanks (vertical cylindrical with close top) as per IS 12701: 1996 of 1000 litres capacity hoisted and fixed in position including provision of 20 mm /15 mm dia medium grade GI pipe for connecting inlet, outlet, over flow and washout pipes with and including Float valve 20mm dia complete all as specified and as directed.
Demolition of brick work or stone/boulder masonry, built in cement mortar including all quoins, arches, pillars, etc. complete all as specified and directed by Engineer in charge.
M & L for brick work with sub class 'B' bricks, straight or curved on plan exceeding 6 m mean radius built in cement mortar 1:4 complete all as specified and as directed.
Demolition and breaking up drain pipes (Salt glazed ware, AC or reinforced concrete) of internal dia 150 mm, set in cement mortar complete all as specified and as directed.
Excavating in trenches not exceeding 1.5 m wide and not exceeding 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. or for cable laying or not exceeding 10 sqm on plan and not exceeding 1.5 m in depth and getting out in soft/ loose soil complete all as specified and as directed.
Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25 cm in soft/ loose/ hard/ dense soil complete all as specified and as directed.
Removing excavated material (soils) not exceeding 50 m and depositing where directed at a level n exc. 1.5 m above the starting point
M&L for plain cement concrete (1:4:8) type D2 (using 40mm graded stone aggregate) as in foundations, filling and mass concrete complete all as specified and as directed.
M&L for providing cement concrete (1:2:4) type B1 ( using 20mm graded stone aggregate) as in copings, benching to manholes,water troughs and the like including weathering slighty rounded or chamfered angles and throating, and including necessary form work complete all as specified and as directed.
M&L for extra for forming fair finished drain or channel 30 cm inner girth in cement concrete using extra cement, including forms, moulds, mitred/stopped ends etc. complete all as specified and as directed.
M & L for precast cement concrete M15 (Nominal Mix) using 20 mm nominal size graded crushed stone aggregate in landings, cover slabs (for man holes etc.) chullah hoods, chajjas, water troughs, mangers, shelves and similar articles with plain faces fair faces, including chamfers, weatherings, throating etc. and setting in cement mortar (1:4) complete with joints to match complete all as specified and as directed
M&L for cutting into existing manholes for connecting (150mm dia SGSW) new drains, making good to pipe and rendering, cutting out existing benching for and forming branch channel (1/2 round or 3/4 section) in cement concrete 1:2:4 type B-1(using 20mm graded stone aggregate) smooth finished, and reforming benching as required complete all as specified and as directed.
Supply only integral water proofing compound of best quality complete all as specified and as direted.
M&L for mild steel TMT bars 8mm dia, cut to length, bend to shape required including cranking, bending spirally for hopping for columns, hooking ends and binding with and including mild steel wire not less than 0.9mm dia(annealed) or securing with clips complete all as specified and as directed.
M&L Reinforced concrete pipes,Bore of pipe 150 mm,class NP3,laid and jointed complete all as specified and as directed.
M&L for cement concrete (1:3:6) type C2 (using 40mm graded stone aggregate) as in concrete bed to drain pipes 150mm bore, including packing under and hunching against the sides of pipes after they are laid and tested complete all as specified and as directed.
Taking out deposited mud, silt, waste etc. form drains or channels width of bed not exceeding 60 cm and removing upto 50 metre and deposited where directed at a level not exceeding 1.5 metre from the starting point complete all as specified and as directed.
Material, T&P and labour for cleaning of sewage line of any dia/bore including manhole using the cleaning devices as per rule 5 and protective gear and safety devices as per rule 4 of the Prohibition of Employment as Manual Scavengers and their Rehabilitation Rules, 2013 and removing blockage if any complete all as specified and as directed.
Material, T&P and labour for cleaning of blockage of wash basin, floor trap, nahani trap, gully trap (GT), kitchen, bath etc. (carrying sullage) in any length upto the first manhole by any means (using chemical or any mechanical device) & flushing with water complete all as specified and as directed.
Material, T&P and labour for cleaning of blockage of WC/Urinal (carrying soil waste) in any length upto the first manhole using the cleaning devices as per rule 5 and protective gear and safety devices as per rule 4 of the Prohibition of Employment as Manual Scavengers and their Rehabilitation Rules, 2013 and removing blockage if any complete all as specified and as directed.
Material, T&P and labour for cleaning/ desludging of septic tank/ soak well of capacity upto 50 users using the cleaning devices as per rule 5 and protective gear and safety devices as per rule 4 of the Prohibition of Employment as Manual Scavengers and their Rehabilitation Rules, 2013 and removing the sludge and solid contents outside MD land complete all as specified and as directed.
Material, T&P and labour for cleaning/ desludging of septic tank/ soak well of capacity from 51 users to 100 users using the cleaning devices as per rule 5 and protective gear and safety devices as per rule 4 of the Prohibition of Employment as Manual Scavengers and their Rehabilitation Rules, 2013 and removing the sludge and solid contents outside MD land complete all as specified and as directed.
Material, T&P and labour for cleaning/ desludging of septic tank/ soak well of capacity from 101 users to 150 users using the cleaning devices as per rule 5 and protective gear and safety devices as per rule 4 of the Prohibition of Employment as Manual Scavengers and their Rehabilitation Rules, 2013 and removing the sludge and solid contents outside MD land complete all as specified and as directed.
Material, T&P and labour for cleaning/ desludging of septic tank/ soak well of capacity from 151 users to 200 users using the cleaning devices as per rule 5 and protective gear and safety devices as per rule 4 of the Prohibition of Employment as Manual Scavengers and their Rehabilitation Rules, 2013 and removing the sludge and solid contents outside MD land complete all as specified and as directed.
Cleaning of PVC water tanks of capacity not exceeding 300 litres including chemical treatment with Anti-bacterial agent consisting of following process: - Dewatering the tank with submersible pump, de-silting and removing of left over dirty water up to 100 to 150 mm in the bottom of the tank and sludge with special sludge pump, cleaning of walls and ceiling with special mechanized high pressure jet machines by rotary jet system at 100-120 Bar pressure (120 Kg /sq cm) which dislodges the layer of dirt, algae, fungus stuck on its surface usage of scrubbing machines for old stains and cleaning chemicals if required of make Eureka Forbes Ltd, floor of the dirty tank should be thoroughly cleaned up by fry jet cleaner to accumulate all dirt ,the remaining sludge should than be removed by sludge pumps, the dirt silt and other foreign material should further be removed by Industrial Vacuum Cleaners to make the floor totally dirt free, application/spraying of Anti-Bacterial chemicals to ensure total sterilization of tank from the inside, inside of the tank should be treated with specially developed 4 ft long ultraviolet Radiator to kill further floating bacteria/virus in order to make the tank totally clean, bacteria free and safe for storage of drinking water. All the above operations should be executed by trained workers and technicians, properly dressed along with gum boots, to work as per the direction of Engineer in charge and same shall be approved GE before commencemnt
Cleaning of PVC water tanks of capacity exceeding 300 litres but not exceeding 500 litres including chemical treatment with Anti-bacterial agent consisting of following process: - Dewatering the tank with submersible pump, de-silting and removing of left over dirty water up to 100 to 150 mm in the bottom of the tank and sludge with special sludge pump, cleaning of walls and ceiling with special mechanized high pressure jet machines by rotary jet system at 100-120 Bar pressure (120 Kg /sq cm) which dislodges the layer of dirt, algae, fungus stuck on its surface usage of scrubbing machines for old stains and cleaning chemicals if required of make Eureka Forbes Ltd, floor of the dirty tank should be thoroughly cleaned up by fry jet cleaner to accumulate all dirt ,the remaining sludge should than be removed by sludge pumps, the dirt silt and other foreign material should further be removed by Industrial Vacuum Cleaners to make the floor totally dirt free, application/spraying of Anti-Bacterial chemicals to ensure total sterilization of tank from the inside, inside of the tank should be treated with specially developed 4 ft long ultraviolet Radiator to kill further floating bacteria/virus in order to make the tank totally clean, bacteria free and safe for storage of drinking water. All the above operations should be executed by trained workers and technicians, properly dressed along with gum boots, to work as per the direction of Engineer in charge Same shall be approved GE before commencemnt
Cleaning of PVC water tanks of capacity exceeding 500 litres but not exceeding 1000 litres including chemical treatment with Anti-bacterial agent consisting of following process: - Dewatering the tank with submersible pump, de-silting and removing of left over dirty water up to 100 to 150 mm in the bottom of the tank and sludge with special sludge pump, cleaning of walls and ceiling with special mechanized high pressure jet machines by rotary jet system at 100-120 Bar pressure (120 Kg /sq cm) which dislodges the layer of dirt, algae, fungus stuck on its surface usage of scrubbing machines for old stains and cleaning chemicals if required of make Eureka Forbes Ltd, floor of the dirty tank should be thoroughly cleaned up by fry jet cleaner to accumulate all dirt ,the remaining sludge should than be removed by sludge pumps, the dirt silt and other foreign material should further be removed by Industrial Vacuum Cleaners to make the floor totally dirt free, application/spraying of Anti-Bacterial chemicals to ensure total sterilization of tank from the inside, inside of the tank should be treated with specially developed 4 ft long ultraviolet Radiator to kill further floating bacteria/virus in order to make the tank totally clean, bacteria free and safe for storage of drinking water. All the above operations should be executed by trained workers and technicians, properly dressed along with gum boots, to work as per the direction of Engineer in charge and same shall be approved GE before commencemnt
Cleaning of RCC water tanks of capacity exceeding not exceeding 500 litres including chemical treatment with Anti-bacterial agent consisting of following process: - Dewatering the tank with submersible pump, de-silting and removing of left over dirty water up to 100 to 150 mm in the bottom of the tank and sludge with special sludge pump, cleaning of walls and ceiling with special mechanized high pressure jet machines by rotary jet system at 100-120 Bar pressure (120 Kg /sq cm) which dislodges the layer of dirt, algae, fungus stuck on its surface usage of scrubbing machines for old stains and cleaning chemicals if required of make Eureka Forbes Ltd, floor of the dirty tank should be thoroughly cleaned up by fry jet cleaner to accumulate all dirt ,the remaining sludge should than be removed by sludge pumps, the dirt silt and other foreign material should further be removed by Industrial Vacuum Cleaners to make the floor totally dirt free, application/spraying of Anti-Bacterial chemicals to ensure total sterilization of tank from the inside, inside of the tank should be treated with specially developed 4 ft long ultraviolet Radiator to kill further floating bacteria/virus in order to make the tank totally clean, bacteria free and safe for storage of drinking water. All the above operations should be executed by trained workers and technicians, properly dressed along with gum boots, to work as per the direction of Engineer in charge and same shall be approved GE before commencemnt
S&F for 110mm dia PVC (SWR) pipes singles socketed in any length with rubber ring joints, fixed to walls, complete all as specified and as directed.
M/S GOPAL ROY AND CO
MS J B CONSTRUCTION AND CO
M/S SUBHAS CONSTRUCTION
RAJGURU & CO
M/S D J ENTERPRISE
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .