chief engineer
chief engineer
Construction of CC roads and nali from ashu goyal house to aggarwal G house and yogendra sharma house for vaishali vihar at ward no. 02
2026_NNSAH_1190884_1
6286 B
Open Tender
Civil Works
Percentage
45 days
Saharanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,298
₹1.5 L
30 Sept 2026
30 Sept 2026
13 Oct 2026
30 Sept 2026
12 Oct 2026
30 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling Of old CC or Brick or granolithic floors including base concrete and including stacking of dismantled material as directed by the Engineer -in-charge with in a distance of 60 metre(200 Feet) S.No 697
Mahes wali gali
Ajay wali gali
Praveen se Barat Ghar
Dinesh wali gali
Dinesh ke makan se Sarkari toilete tak | 467.5 | sqm | 38 | ₹17,765 |
| 2 | Earthwork in excavation in ordinary soil with lift 1.5m & lead upto 30m etc including all work complete | 17.85 | cum | 90 | ₹1,606.5 |
| 3 | Disposal of Excavated Soil up to 5.00 KM distance complete with labour T&P ETC at site. (SOR UP PWD SI - 131(A)
100% Disposal of Excavated Material (Average Diatance from all Sides of City)
80 % Of Excavated Material | 67 | cum | 130 | ₹8,710 |
| 4 | Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (SOR UP PWD SI - 273)
Under Nali Both Side | 5.95 | cum | 2,985 | ₹17,760.75 |
| 5 | M-150 Brick work in 1:4 one cement and four course sand, mortar in foundation in plinth including suopply of all material labour, T &P etc. required for proper completion of the work. (SOR UP PWD - 305A)
Wall Side Nali
Road Side Nali | 9.38 | cum | 4,690 | ₹43,992.2 |
| 6 | Plain Cement Concrete with 2c.m.gauge approved slone balliast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (SOR UP PWD - 279 A)
Bead Of Nali | 0.98 | cum | 5,750 | ₹5,635 |
| 7 | 12 mm thick plaster with cement and approved fine sand mortar in 1:4 over brick work minium thickness not to be less than 1 Cm including supply of all material labour Tool & Plants etc. required for proper completion of the work. (SOR UP PWD SI - 584) | 59.5 | sqm | 165 | ₹9,817.5 |
| 8 | Cement Concrete in proportion of 8:4:1 with 4cm guage approved stone ballast, Coarse sand & cement in the materials, labour Tools & plants etc. required for proper completion of the work. (SOR UP PWD SI - 279)
As per Item No (B) | 70.55 | cum | 4,850 | ₹3,42,167.5 |
| 9 | Cement Concrete with 2cm gauge approved stone grit, coarse sand & cement in proportion of 1:1.50:3 in cc pavement (theckness as per design) cement coarse & fine aggregate confirming to IS standard mixed in ncrete mixture /Plant of not less then 0.2 cum capacity & appropriate weight batcher using approved mix design, laid in approved fixed form work (steel) channel) laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the form work spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including hassion cloth for curring of concrete pavements for not less then 14 days curring compound (where as specified) and water finishing to lines & grade including supply of all material, labour, tools & plants etc. required for proper completion of work and also including complete shifting of Recron 38 fibre reinforcement material etcl & concrete etc. (UP PWD SOR - New Item -9) | 105.83 | cum | 7,300 | ₹7,72,559 |
| 10 | R.C.C. Work with cement, approved coarse sand & 2 cm guage approved stone grit in proportions of 1:1.5:3 in lintels of door & windows excluding supply of reinforcement and its bending. But including its fixing and binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra. (SOR UP PWD SI - 284 A)
Slab of Puliya | 3.57 | cum | 7,400 | ₹26,418 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.30 MB
BOQ_2244967.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .