| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.4 CrAccepted-AOC | ₹20.4 Cr Quoted ₹16.2 Cr | L1 | Accepted-AOC lowest bidder |
| 2 | L2₹16.9 Cr+₹75.3 L (4.65%)Rejected-AOC | ₹16.9 Cr+₹75.3 L (4.65%) | L2 | Rejected-AOC l2 |
| 3 | L3₹17.2 Cr+₹1.0 Cr (6.20%)Rejected-AOC | ₹17.2 Cr+₹1.0 Cr (6.20%) | L3 | Rejected-AOC l3 |
Tender Value
₹12.5 Cr
EMD Value
₹31.4 L
Closing Date
1 Jan 2026, 4:00 pmClosed
Chief Engineer, Buildings and Housing Dept.
Office of the Chief Engineer Buildings and Housing Department, Nirman Bhawan, Zero Point Gangtok, East Sikkim
Construction of Grade C 6 Blocks -36 Units Quarters at SAP, Panthang, Gangtok, Sikkim.
2025_BHD_866_1
185/SD/HQ-II/Bldg/2025-26/P/18
Open Tender
Civil Works
Percentage
1095 days
Pangthang, Gangtok District
Please refer Tender documents.
5 documents required · 5 mandatory
₹3 L
Principal Director (Accounts), BNHD
₹31.4 L
21 Jul 2026
4 Dec 2025
3 Jan 2026
4 Dec 2025
1 Jan 2026
4 Dec 2025
4 Dec 2025 - 31 Dec 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CONSTRUCTION OF 6 NOS OF GRADE "C" (6 UNITS) QUARTER | |||||
| 1.01 | BUILDING WORKS FOR 6 BLOCKS | - | - | - | - |
| 1.02 | Khalashi engaged for cutting of vegetation, shurbs, stacking & throwing of debris, clearing of the site etc. all complete. | 3,000 | mdays | 400 | ₹12,00,000 |
| 1.03 | Excavation in soil in hilly area by manual means | 4,526.04 | cum | 311.19 | ₹14,08,458.39 |
| 1.04 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains | 1,867.8 | cum | 295.52 | ₹5,51,972.26 |
| 1.05 | Providing and laying hand packed stone soling in buildings works with clean hard selected stones, all complete. (Manual means) | 357.12 | cum | 1,110.94 | ₹3,96,738.89 |
| 1.06 | Providing & Laying in position cement concrete of 1:2:4 mix. | 163.74 | cum | 5,923.74 | ₹9,69,953.19 |
| 1.07 | Filling inside plinth in building works with 23 cm layers, consolidated to 15cm including watering, ramming etc. all complete. | - | - | - | - |
| 1.08 | Earth Filling | 1,008.5 | cum | 257.03 | ₹2,59,214.75 |
| 1.09 | Stone Filling | 432.22 | cum | 704.48 | ₹3,04,490.35 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
TenderDocument.pdf
Tender Documents • 1.05 MB
BOQ_939.xls
BOQ • 0.66 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .