Tender ID
Tender Value
₹9 L
EMD Value
₹6.5 L
Closing Date
30 Mar 2026, 12:00 pmClosed
SE BSR Circle PWDBulandshahar
SE BSR Circle PWDBulandshahar
Reconstruction of Damage Narow Bridge Pahasu Somna ODR Km 6 in District Bulandshahar
2026_CEMRT_1129206_1
321/96(M)-BSR Circle/ 25-26 Dt. 24.01.2026
Open Tender
Civil Works - Bridges
Lump-sum
180 days
khujra
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹6.5 L
Yes
23 Mar 2026
23 Mar 2026
30 Mar 2026
23 Mar 2026
30 Mar 2026
23 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of cement concrete including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres(Brick Work) Including cost of all labour, T&P, labour cess and all taxes complete but excluding cost of GST. | - | Cum | - | - |
| - | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres As per Clause 202(Cement Concrete) Including cost of all labour, T&P, labour cess and all taxes complete but excluding cost of GST. | - | Cum | - | - |
| - | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Including cost of all labour, T&P, labour cess and all taxes complete but excluding cost of GST. | - | Cum | - | - |
| - | Plain cement concrete 1:3:6 nominal mix with crushed stone aggregate 40 mm nominal size mechanically mixed,placed in foundation and compacted by vibration including curing for 14 days. Including cost of all labour, T&P, labour cess and all taxes complete but excluding cost of GST. | - | Cum | - | - |
| - | Plain/Reinforced cement concrete (M20) with 2 Cm gauge approved Stone grite, coarse sand and cement in open foundation complete as per drawing and technical specifications including supply of all material, labour, T&P all taxes,labour cess etc. required for proper completion of work as per direction by the Engineer In-charge Including cost of all labour, T&P, labour cess and all taxes complete but excluding cost of GST. | - | Cum | - | - |
| - | RCC Grade M25 using batching plant transit mixer & Concrete pump MORT&H Specification 1500,1700 & 2100 Sr No 12.8 Including cost of all labour, T&P, labour cess and all taxes complete but excluding cost of GST. | - | Cum | - | - |
| - | RCC M25 Providing concrete for Plain/Reinforced cement concrete in super structure complete as per drawing and technical specifications Clauses 802,803,1202&1203 Sr. No. 13.1 Ref. No. 800 Including cost of all labour, T&P, labour cess and all taxes complete but excluding cost of GST. | - | Cum | - | - |
| - | Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 Sr. No. 13.2 Ref. No. 1000 Including cost of all labour, T&P, labour cess and all taxes complete but excluding cost of GST. | - | MT | - | - |
| - | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications Clause 800 and 1206.3 Sr No. 13.5 Ref No. 800 Including cost of all labour, T&P, labour cess and all taxes complete but excluding cost of GST. | - | Cum | - | - |
| - | Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification. Including cost of all labour, T&P, labour cess and all taxes complete but excluding cost of GST. | - | Rmt | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_2106368.xls
BOQ • 1.13 MB
T.pdf
Tender Documents • 1.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .