Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.1 LAccepted-Finance | ₹12.1 L | L1 | Accepted-Finance L1 |
| 2 | L2₹12.7 LAccepted-Finance | ₹12.7 L | L2 | Accepted-Finance L2 |
| 3 | L3₹14.3 LAccepted-Finance | ₹14.3 L | L3 | Accepted-Finance L3 |
| 4 | L4₹14.8 LAccepted-Finance | ₹14.8 L | L4 | Accepted-Finance L4 |
| 5 | L5₹16.0 LAccepted-Finance SMVDU | ₹16.0 L | L5 | Accepted-Finance L5 |
Tender Value
₹19 L
EMD Value
₹38,000
Closing Date
21 Apr 2026, 6:00 pmClosed
Executive Enigneer
pwd division udhampur
Construction of Physics lab at Hr. Sec. School Barmeen and Minor Repairs in Hr. Sec. School Barmeen (Under PM Shri during PAB 2025-26)
2026_PWDJK_307880_2
e-NIT No. 11 of 2026-27 dated 15.04.2026
Open Tender
Civil Works
150 days
Udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD Division Udhampur
₹38,000
28 Apr 2026
15 Apr 2026
22 Apr 2026
16 Apr 2026
21 Apr 2026
16 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Part A: Construction of Physics lab at Hr. Sec. School Barmeen | |||||
| 2Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | |||||
| 2.1 | 70% Qty. in All kind of Soil | - | cum | - | - |
| 2.2 | 30% Qty. in Ordinary Rock | - | cum | - | - |
| 3Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | |||||
| 3.1 | 70% Qty. in All kind of Soil | - | cum | - | - |
| 3.2 | 30% Qty. in Ordinary Rock | - | cum | - | - |
| 4Providing and lying in position cement concrete 1 cement:4 fine sand:8 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level | |||||
| 5Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level 20% Boulders | |||||
| 6Centering and shuttering including strutting, propping etc and removal of the formwork. | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_998407.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid