Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.8 LAdmitted-Finance | -29.75% | ₹11.8 L | L1 | Admitted-Finance |
| 2 | L2₹12.4 L+₹58,276.37 (4.93%)Admitted-Finance | -26.29% | ₹12.4 L+₹58,276.37 (4.93%) | L2 | Admitted-Finance |
| 3 | L3₹13.3 L+₹1.5 L (12.3%)Admitted-Finance | -21.11% | ₹13.3 L+₹1.5 L (12.3%) | L3 | Admitted-Finance |
| 4 | L4₹14.6 L+₹2.8 L (23.7%)Admitted-Finance | -13.13% | ₹14.6 L+₹2.8 L (23.7%) | L4 | Admitted-Finance |
Tender Value
₹16.8 L
EMD Value
₹33,680
Closing Date
9 Jun 2026, 4:00 pmClosed
Executive Engineer RNb Dalgate DIvision Sgr
Executive Engineer RNb Dalgate DIvision Sgr
Construction of Tehsil office Building Pantha Chowk Srinagar (Balance works).
2026_PWDJK_311458_1
NIT No._16_/e-tendering /DAL/2026-27/_2066-74 Dt._03-06-2026
Open Tender
Civil Works
Percentage
60 days
Tehsil office Building Pantha Chowk Srinagar
as Per nit
2 documents required · 2 mandatory
₹800
Executive Engineer RNb Dalgate DIvision Sgr
₹33,680
12 Jun 2026
3 Jun 2026
10 Jun 2026
4 Jun 2026
9 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | 26.98 | Cum | 158.73 | ₹4,282.54 |
| 2 | P/L stone soling (Hand packed) in trenches incl. ramming, dressing, watering etc. incl. all leads, lifts and carriage upto site of work complete. | 16.96 | Cum | 805.08 | ₹13,654.16 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 11.23 | Cum | 4,409.24 | ₹49,515.77 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 38.21 | Cum | 5,585.81 | ₹2,13,433.8 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 1.42 | Cum | 4,858.98 | ₹6,899.75 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement: 1½ coarse sand: 3 graded stone aggregate 20 mm nominal size). | 0.32 | Cum | 6,600.34 | ₹2,112.11 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc. | 223.05 | Sqm | 533.01 | ₹1,18,887.88 |
| 8 | Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete. Thermo mechanically treated bars of grade. Fe-500D or more complete. | 234.43 | Kg | 104.41 | ₹24,476.84 |
| 9 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes | 280 | Kg | 133.01 | ₹37,242.8 |
| 10 | Structural steel work welded in built up sections framed work trusses channels, griders plate including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 1,800 | Kg | 117.12 | ₹2,10,816 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
BOQ_1008481.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .