Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 CrAccepted-AOC | ₹3.7 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹4.4 Cr+₹66.8 L (18.0%)Rejected-AOC | ₹4.4 Cr+₹66.8 L (18.0%) | L2 | Rejected-AOC L2 |
| 3 | L3₹4.6 Cr+₹93.2 L (25.1%)Rejected-AOC 99 SUSHILA BIHAR BHUD BULANDSHAHAR | ₹4.6 Cr+₹93.2 L (25.1%) | L3 | Rejected-AOC L3 |
| 4 | L4₹4.7 Cr+₹99.4 L (26.7%)Rejected-AOC | ₹4.7 Cr+₹99.4 L (26.7%) | L4 | Rejected-AOC L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical document incompleted |
Tender Value
Refer Docs
EMD Value
₹11.6 L
Closing Date
20 Jan 2021, 5:00 pmClosed
SE ICC MAHOBA
OFFICE OF THE SE ICC BAJARIYA MAHOBA
Anti Erosion work (Construction of Spur) to protect Vill merapur, Bhilawa, Ish Chaitanya Ashram(Km. 0.200 to 0.700) etc. at right bank of river yamuna in Hamirpur District. (Lot-7)
2021_UPIDC_545719_7
02/SE/2020-21
Open Tender
Civil Works
Item Rate
120 days
HAMIRPUR
AS PER NIT AND TENDER DOCUMENT
2 documents required · 2 mandatory
₹2,354
₹11.6 L
Yes
3 Mar 2021
14 Jan 2021
21 Jan 2021
14 Jan 2021
20 Jan 2021
14 Jan 2021
Amount
The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work. (G.S.T. will be paid extra as per rules)
Earth work in Cutting for making bed including all lead and lift
Earth work in filling soil in digging or in embankment i/c lead upto 30 mtr and lift upto 1.5 M i/c dressing making profile and manual compaction but excluding mechanical compaction
Supply and laying new E.C bags 50kg 772 gm weight filed with RBM in nylone create size 1x1x1 m i/c all cost of material all lead and lift T&P as direated by site in charge
Supplying & laying G.I wire crate size 2x1.5x1.0m and mesh size 20x20cm in 2m depth i/c cost of all material T&P as direated by site in charge
Supply & laying crated lauching apron in stone boulder up to 25 kg to 40kg weight in G.I wire crate size 2x1.5x1 m i/c cost of all material T&P cost of G.I wire crate as direated by site in charge
Supplying & laying Geo textile sheet made of 540 GSM woven multi pllypropyleen on slope i/c cost of all material T&P as direated by site in charge.
Supplying & laying stone boulder up to 40-60 kg weight in pitching i/c all cost of material labour T&P etc complete
Supply & fixing of RCC percoupine 1.5:3 m20 grade in stud at site i/c all cost of labour T&P etc.
Supply & fixing of Jhankhar/Behaya in sream i/c cutting of Jhankhar complete with all respect
Supply and laying coarse sand below pitching as filter material i/c cost of all material labaour T&P etc.
Hari Construction
M/S CHAUDHARY ENTERPRISES
MASTER CONSTRUCTION
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .