Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹14.8 L
EMD Value
₹15,000
Closing Date
12 Dec 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer (VP), Thirukkalukundram
Block Development Office, Thirukkalukundram
DESILTING AND CONSTRUCTION OF THANGAL ERI WEIR IN NEIKUPPI PANCHAYAT.
2022_RDTN_270100_1
Rc.No.3151/2022/B2, Dated.30.11.2022
Open Tender
Civil Works - Others
Lump-sum
120 days
DESILTING AND CONSTRUCTION OF THANGAL ERI WEIR IN
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹15,000
Yes
Block Development Office, Thirukkalukundram
12 Dec 2022
5 Dec 2022
12 Dec 2022
5 Dec 2022
12 Dec 2022
5 Dec 2022
6 Dec 2022
Amount
PART I: DESILTING AND CONSTRUCTION OF THANGAL ERI WEIR IN NEIKUPPI PANCHAYAT. Estimate Amount : Rs.14.75Lakhs
Clearing the Scrub jungles Including All Cost Of Labour Charges as per standard specifications
Sectioning the Bund including Breaking of clouds ,tamping and sectoning etc.complete
Benching of old Embankment slopes etc.
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay, stiff black cotton, hard red earth, shales,muram, gravel stoney earth, and earth mixed with small size boulders and hard gravelly soil as per SS 20A
Filling with Msand including cost and Conveyance of all charges etc.
CC 1:4:8 mix using 40mm ISS HBG Metal including all cost and conveyance etc.complete.
Supplying and centering shuttering including necessary supports for plane
Cement concrete 1:3:6mix using 40mm ISS HBG metal including all cost and labour charges etc.complete . Complying with standard specification etc.
Rough Stone Dry Packing For Rivetment Work Complying With Standard Specifiction Including all cost and charges etc.complete
Pointing The RR Masonry with cm1:3 mix Including cost and conveyance of all materials to site and all labour charges etc.complete
Exterior Emulsion of two coats with best approved Emulsion Paint including cost and conveyance of all materials to site and all labour charges etc complete
Gravel packing to rivetment work complying with standaed specificaion of all charges
Construction of weir
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay, stiff black cotton, hard red earth, shales,muram, gravel stoney earth, and earth mixed with small size boulders and hard gravelly soil as per SS 20A
Dismantling with out damaging the near by structure if any clearing away and carefully stacking materials useful for reuse for any thickenss,.
Dismantling with out damaging the near by structure if any clearing away and carefully stacking materials useful for reuse for any thickenss,.
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay, stiff black cotton, hard red earth, shales,muram, gravel stoney earth, and earth mixed with small size boulders and hard gravelly soil as per SS 20A
Filling with Msand including cost and Conveyance of all charges etc.
CC 1:4:8 mix using 40mm ISS HBG Metal including all cost and conveyance etc.complete.
Cement concrete 1:3:6mix using 40mm ISS HBG metal including all cost and labour charges etc.complete . Complying with standard specification etc.
Supplying and centering shuttering including necessary supports for plane
Plain cement concrete 1:2:4 mix using 20mm ISS HBG Metal including all cost and conveyance etc.complete
Refilling with excavated earth with all leads and lift for filling the open cut where ever necessary in levers including clods
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SENUVASAN
stage.html
html • 0.02 MB
finance_320414.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .