Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
18 Apr 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer(BP),Madhuranthagam Block
Block Development Office, Madhuranthagam Block
Providing Open well, Cover slab Pumping main line in Arayapakkam village at Arayapakkam Panchayat in Maddhurantagam Panchayat union Under 15th CFC Grant - District Panchayat Tied 2021-22
2022_RDTN_228694_1
Rc.No.006/2021/SE Dt Pt 1-3 Dated 11.02.2022
Open Tender
Civil Works - Water Works
Lump-sum
120 days
Arayapakkam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹15,000
Yes
18 Apr 2022
11 Apr 2022
18 Apr 2022
11 Apr 2022
18 Apr 2022
11 Apr 2022
90 days
Amount
Earthwork open well excavation complying with relevant clauses of TNDSS well sinking and with lead upto 10m in hard stiff clay, black cotton soil hard re earth shales muram gravel, stony earth and earth mixed with small size boulders and hard gravely soil first depth 0.00m to 2.00m
Earthwork open well excavation complying with relevant clauses of TNDSS well sinking and with lead upto 10m in soft dis integrated rock, lateite soft rock or kankar not reauiring blastering second depth 2.00m to 4.00m
Earthwork open well excavation complying with relevant clauses TNDSS well sinking and with lead upto 10m in medium rock not requiring blasting third depth 4.00m to 5.00m
Earthwork open well excavation complying with relevant clauses TNDSS well sinking and with lead upto 10m in medium rock requiring blasting fourth depth 5.00m to 6.00m
open well excavation complying with relevant clauses TNDSS well sinking and with lead upto 10m in medium rock requiring blasting fifth depth 6.00m to 8.00m
open well excavation complying with relevant clauses TNDSS well sinking and with lead upto 10m in medium rock not requiring blasting seventh depth 8.00m to 10.00m
open well excavation complying with relevant clauses TNDSS well sinking and with lead upto 10m in Hard granite measured in solid including blasting seventh depth 10.00m to 12.00m
CC 1:4:8 mix using 40mm HBG metal including cost and conveyance and all other labour charges
Supplying and erecting centering for sides and soffits including all charges
RCC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance and all other labour charges etc., complete
Supply and fabrication of steel including cost and conveyance and all other labour charges
Random rubbles masanory in CM 1:5 mix using rough stone and bond stone including cost and conveyance and all other labour charges etc.,
Bailing out water charges
Supplying and fixing of well cover arrangemen using approved L angles and weld mesh supporting by I secton including all charges etc completed
Plastering with CM 1:5,12mm thick over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Painting two coats with plastic emulsion paint of approved colour and quality including the cost of paint and labour charges etc., complete complying with the standard specification and as directed by the Departmental Officers
Painting two coats over New Iron work with ready mixed approved paints
Earth work excavation and depositing on bank with initial lead and lift in all soil
Cost of 90 mm OD PVC Pipe (6ksc)including cost and conveyance
Labour charge for Laying and Jointing 90 mm OD PVC Pipe
Refilling trench with excavated earth ofter laying the pipe
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SENUVASAN
stage.html
html • 0.02 MB
finance_269847.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .