| 1 | L1₹8.3 LAccepted-Finance VILL PO GANVI TEH RAMPUR DISTT SHIMLA H P | SHIMLA | SHIMLA | HIMACHAL PRADESH | ₹8.3 L | L1 | Accepted-Finance L1 |
| 2 | L2₹8.4 L+₹10,442.61 (1.26%)Rejected-Finance VILLAGE KHADED P O CHOWAI TEHSIL ANNI DISTT KULLU HP | KULLU | HIMACHAL PRADESH | 172001 | ₹8.4 L+₹10,442.61 (1.26%) | L2 | Rejected-Finance L2 |
| 3 | L3₹8.5 L+₹18,453.93 (2.23%)Rejected-Finance NOT AVAILABLE | ₹8.5 L+₹18,453.93 (2.23%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | BHAGWAN DASS L1 | RAMESH KUMAR L3 | Dev raj L2 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches (For pipes and pits) up to all depths and in all classification of each work such as pick work, jumper work, saturated soil including bailing or pumping out of water, blasting soft or hard rock or chiselling or wedging out of soft/ hard rock, where blasting is prohibited, in all lifts including trimming and dressing of sides, levelling of beds to correct grade including shoring, strutting, planking, timbering and dewatering where ever required. Stacking usable and unusable material/ soil separately and after laying, jointing and testing of pipes, returning the usable soil in 15cm layers by ramming and watering and then disposing of all surplus excavated soil/ unusable material as directed within all leads/ lifts including restoration of unmetalled surfaces to its original condition and including cost of diversion for traffic, night signal boards, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respect with in all leads and lifts as per direction of Engineer-in-Charge. Pick & Jumper work | 136.93 | Cum | 450 ₹61,618.5 Lowest | 458 ₹62,713.94 | 457 ₹62,577.01 |
| 2.00 | Providing and laying cement concrete 1:4:8 (1cement: 4 sand: 8 graded stone agg.20mm nominal size) and curing complete excluding cost of form work in foundation and plinth within all leads and lifts as per satisfaction and direction of Engineer-in-charge. | 0.95 | Cum | 8,000 ₹7,600 Lowest | 8,110 ₹7,704.5 | 8,150 ₹7,742.5 |
| 3.00Providing and laying cement concrete 1:1.5:3 (1cement:1.5 sand : 3graded stone aggregate 20mm nominal size)and curing complete excluding cost of form work and re-inforcement for reinforced concrete work in: | ||||||
| 3.01 | Foundations, footings, basis of columns & the like and mass concrete. | 0.95 | Cum | 10,000 ₹9,500 Lowest | 10,050 ₹9,547.5 | 10,250 ₹9,737.5 |
| 3.02 | Wall (any thickness but not less than 0.1 m thickness) attached pillasters, buttresses, plinth and string courses, etc. from top of foundation level upto floor two level. | 3.11 | Cum | 12,000 ₹37,320 Lowest | 12,079 ₹37,565.69 | 12,210 ₹37,973.1 |
| 4.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a rough finish including centering shuttering strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4mtrs.and removal of the same for in situ reinforced concrete and plain concrete work including all leads and lifts: | ||||||
| 4.01 | Vertical surfaces such as walls (any thickness)portions and the like including attached pilaster buttresses plinth and string course and the like. | 41.4 | Sqm | 600 ₹24,840 Lowest | 612 ₹25,336.8 | 615 ₹25,461 |
| 5.00 | Providing Mild/TOR steel reinforcement for RCC work i/c bending, binding & placing in position complete up to floor two level (TOR/Mild steel ) in all leads and lifts as per direction of Engineer-in charge. | 183 | Kg. | 100 ₹18,300 Lowest | 108 ₹19,764 | 110 ₹20,130 |
| 6.00Providing Laying, jointing and commissioning of HDPE (High Density Polyethylene pipes) of following diameter and class confirming to IS 4984-2016 with fusion welding process including all necessary fittings & bends in all leads and lifts to the entire satisfaction of Engineer-in-charge.(Earth work in trenches to be measured and paid for separately) | ||||||
| 6.01 | HDPE pipe 110 mm OD PN-10 as (IS: 4984-2016) PE-80 | 1,000 | Rmt. | 670 ₹6,70,000 Lowest | 685 ₹6,85,000 | 676 ₹6,76,000 |
Tender Value
₹7.3 L
EMD Value
₹14,661
Closing Date
1 Jul 2026, 5:00 pmClosed
E.E. JSV Division Anni
E.E. JSV Division Anni
SH Providing Laying Jointing and Testing of HDPE pipe 110 mm OD PN-10, PE-80 from RD 0 to 1000 Rmt. and C/o Outlet Chamber 3 Nos.
2026_HPIPH_137417_1
3085-3135
Open Tender
Civil Works
Item Rate
120 days
Showad
Please refer Tender documents.
9 documents required · 9 mandatory
₹350
₹14,661
20 Jul 2026
24 Jun 2026
2 Jul 2026
24 Jun 2026
1 Jul 2026
24 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation and trenches (For pipes and pits) up to all depths and in all classification of each work such as pick work, jumper work, saturated soil including bailing or pumping out of water, blasting soft or hard rock or chiselling or wedging out of soft/ hard rock, where blasting is prohibited, in all lifts including trimming and dressing of sides, levelling of beds to correct grade including shoring, strutting, planking, timbering and dewatering where ever required. Stacking usable and unusable material/ soil separately and after laying, jointing and testing of pipes, returning the usable soil in 15cm layers by ramming and watering and then disposing of all surplus excavated soil/ unusable material as directed within all leads/ lifts including restoration of unmetalled surfaces to its original condition and including cost of diversion for traffic, night signal boards, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respect with in all leads and lifts as per direction of Engineer-in-Charge. Pick & Jumper work | - | Cum | 3.25 | - |
| 2 | Providing and laying cement concrete 1:4:8 (1cement: 4 sand: 8 graded stone agg.20mm nominal size) and curing complete excluding cost of form work in foundation and plinth within all leads and lifts as per satisfaction and direction of Engineer-in-charge. | - | Cum | 4.25 | - |
| 3Providing and laying cement concrete 1:1.5:3 (1cement:1.5 sand : 3graded stone aggregate 20mm nominal size)and curing complete excluding cost of form work and re-inforcement for reinforced concrete work in: | |||||
| 3.01 | Foundations, footings, basis of columns & the like and mass concrete. | - | Cum | 6.25 | - |
| 3.02 | Wall (any thickness but not less than 0.1 m thickness) attached pillasters, buttresses, plinth and string courses, etc. from top of foundation level upto floor two level. | 1 | Cum | 7.25 | ₹7.24 |
| 4Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a rough finish including centering shuttering strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4mtrs.and removal of the same for in situ reinforced concrete and plain concrete work including all leads and lifts: | |||||
| 4.01 | Vertical surfaces such as walls (any thickness)portions and the like including attached pilaster buttresses plinth and string course and the like. | 1 | Sqm | 9.25 | ₹9.24 |
| 5 | Providing Mild/TOR steel reinforcement for RCC work i/c bending, binding & placing in position complete up to floor two level (TOR/Mild steel ) in all leads and lifts as per direction of Engineer-in charge. | - | Kg. | 10.25 | - |
| 6Providing Laying, jointing and commissioning of HDPE (High Density Polyethylene pipes) of following diameter and class confirming to IS 4984-2016 with fusion welding process including all necessary fittings & bends in all leads and lifts to the entire satisfaction of Engineer-in-charge.(Earth work in trenches to be measured and paid for separately) | |||||
| 6.01 | HDPE pipe 110 mm OD PN-10 as (IS: 4984-2016) PE-80 | - | Rmt. | 12.25 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.28 MB
form6.pdf
Tender Documents • 0.38 MB
form8.pdf
Tender Documents • 1.29 MB
terms.pdf
Tender Documents • 0.46 MB
BOQ_203350.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .