Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | ₹4.1 L | L1 | Accepted-AOC BELOW |
| 2 | L2₹4.4 L+₹25,530 (6.15%)Rejected-AOC | ₹4.4 L+₹25,530 (6.15%) | L2 | Rejected-AOC ABOCE |
| Sl No | Description | Qty | Unit | B.SURESH BABU CONSTRUCTIONS L1 | S.CHANDRAN L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation in all soils and sub soils except hard rock requiring blasting with initial lead and lift including re-filling the sides of foundation in layer of 15 cm thick watering , ramming ,depositing the surplus earth in the premises as directed by departmental officers etc., complete asper standard specification. For Drain | 72 | M3 | 160 ₹11,520 Lowest | 170 ₹12,240 |
| 2.00 | Plain cement concrete in mix 1:4:8 ( One cement , four sand and eight aggregate) using 40 mm BSS HBG metal including cost and conveyence of all meterials to work site and labour charges for mixing, laying, curing etc complete as per the standard specification. | 12 | M3 | 5,325 ₹63,900 Lowest | 5,650 ₹67,800 |
| 3.00 | Providing centering for sides and soffits of R.C.C.works such as lintels, slab that beams plain surface etc., complete excluding strutting upto 3.30 M height using mild steel sheet of size 90 c.m x 60 c.m and 10 gauge stifer with M.S. angles of size 25 mm x 25 mm x 3mm laid over silver w.c.wood joints of size 10 c.m. x 6 c.m. spaced at about 90 c.m. c/c and supported by casurins props of 10 c.m. to 13 c.m. dia spaced 75 c.m. centre to centre complying with as per standard specification. for side wall. For Drain | 240 | M2 | 525 ₹1,26,000 Lowest | 557 ₹1,33,680 |
| 4.00 | Cement concrete in 1:2:4 [one cement and two sand and aggregate using 20mm size ISS grade machine crushed metal including the cost of mixing laying curing etc., complete complying with standard specification. | 30 | M3 | 6,615 ₹1,98,450 Lowest | 7,020 ₹2,10,600 |
| 5.00 | Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 54 | M2 | 280 ₹15,120 Lowest | 300 ₹16,200 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
26 Feb 2026, 3:00 pmClosed
COMMISSIONER
KARAMADAI
Construction of Drain at Ward No 08 Vadamangalakarai Arijana colony 11th cross road 167008R349 in Karamadai Municipality
2026_MAWS_664598_1
3872/2025/E1
Open Tender
Construction Works
Works
KARAMADAI MUNICIPALITY
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹5,000
4 Aug 2026
23 Feb 2026
26 Feb 2026
23 Feb 2026
26 Feb 2026
23 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation for foundation in all soils and sub soils except hard rock requiring blasting with initial lead and lift including re-filling the sides of foundation in layer of 15 cm thick watering , ramming ,depositing the surplus earth in the premises as directed by departmental officers etc., complete asper standard specification. For Drain | 72 | M3 | 1.25 | ₹90 |
| 2 | Plain cement concrete in mix 1:4:8 ( One cement , four sand and eight aggregate) using 40 mm BSS HBG metal including cost and conveyence of all meterials to work site and labour charges for mixing, laying, curing etc complete as per the standard specification. | 12 | M3 | 3.25 | ₹39 |
| 3 | Providing centering for sides and soffits of R.C.C.works such as lintels, slab that beams plain surface etc., complete excluding strutting upto 3.30 M height using mild steel sheet of size 90 c.m x 60 c.m and 10 gauge stifer with M.S. angles of size 25 mm x 25 mm x 3mm laid over silver w.c.wood joints of size 10 c.m. x 6 c.m. spaced at about 90 c.m. c/c and supported by casurins props of 10 c.m. to 13 c.m. dia spaced 75 c.m. centre to centre complying with as per standard specification. for side wall. For Drain | 240 | M2 | 4.25 | ₹1,020 |
| 4 | Cement concrete in 1:2:4 [one cement and two sand and aggregate using 20mm size ISS grade machine crushed metal including the cost of mixing laying curing etc., complete complying with standard specification. | 30 | M3 | 5.25 | ₹157.5 |
| 5 | Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 54 | M2 | 6.25 | ₹337.5 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
BOQ_798101.xls
BOQ • 0.35 MB
NIT.pdf
PDF • 0.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .