Loading…
Loading…
Tender Value
₹15.6 Cr
EMD Value
₹25.6 L
Closing Date
5 Oct 2026, 3:00 pm
ASIF IQBAL
EXECUTIVE ENGINEER
IRRIGATION MECHANICAL DIVISION,DEHRI
AJAY KUMAR SINGH (CE DEHRI)
CE,IC,WRD,DEHRI
Modification work on the navigation channels located at different points along the Western main canal and Ara main canal.
140735
01SBD/2026-27_Dehri
Open Tender
GENERAL
Patna
• Bid Validity (Bids shall remain valid for a period not less than
120 days after the deadline date. A Bid valid for a shorter peri
od shall be rejected by the Employer as non-responsive)
• Bid Security
• Legal Status of Bidder.
• Principal place of Business
• Power of attorney of signatory Bid
• Total value of civil engineering construction work performed in last five years. (Supported By UDIN) (2021-22)
• Total value of civil engineering construction work performed in last five years. (Supported By UDIN) (2022-23)
• Total value of civil engineering construction work performed in last five years. (Supported By UDIN) (2023-24)
• Total value of civil engineering construction work performed in last five years. (Supported By UDIN) (2024-25)
• Total value of civil engineering construction work performed in
last five years. (Supported By UDIN) (2025-26)
• Work Experience of Similar nature.
• Minimum Quantities of work done as prime contractor in any
one year during last five years.
• Bidding Capacity: More than the total Bid value of present wo
rk = A*N*3-B=Rs. ____.Where A = Maxm. Value of work ex
ecuted in any one yr during last 5 yrs. N= Nos of years for co
mpletion of works. B=Value of existing commitments & ongo
ing works to be completed in period
• Existing commitments and ongoing works
• Work for which Bid already submitted
• Availability of key items of Contractor's Equipment
• Key Personnel
• Evidence of accesses to Financial Resources
• Proposed methodology and programme of construction.
• Litigation History
• Affidavit. Regarding statements made in the required attachm
ents are true and correct
• Undertaking. Able to invest a minimum of cost upto 25% of c
ontract value of work. During implementation of contract.
• Time of Completion
• Registration No
• Character Certificate
• I.T. & GST Registration & clearance Certificate
• NOC for Debar (If required)
• Any other documents if required
GENERAL
PERCENTAGE
L1
1
26 documents required · 26 mandatory
₹10,000
Processing Fee: 11800
₹25.6 L
OFFICE OF THE CHIEF ENGINEER, IC, WRD, DEHRI
26 Sept 2026
26 Sept 2026
7 Oct 2026
26 Sept 2026
5 Oct 2026
26 Sept 2026
28 Sept 2026
Technical Sheet
Name of Work Modification work on the navigation channels located at different points along the Western main canal and Ara main canal. Cost of Work as per BOQ(Rs in Lakhs) Time of Completion in months 17 Months ALL COLOURED CELL TO BE FILLED ACCORDINGLY
Sactioned Amount Date of Sanction 24.09.2026 Last Date of Tender submission 05.10.2026
Sl No. Items Requirement Requirement Cl. No. Name of the contractor
Address of the contractor
1 Bid Validity Bids shall remain valid for a period not less than 120 days after the deadline date. A Bid valid for a shorter period shall be rejected by the Employer as non-responsive 120 Days Bid validity periods In days
2 Bid Security (A) Unconditional bank guarantee from any scheduled Indian bank issued within the state in the format given (If issued from any bank outside state will be converted to any bank within the state before executing the agreement. Amount To be entered (Rs in Lakhs)
(B) Earnest Money can be paid through Internet Payment Gateway (Credit/Debit Card), Net Banking, NEFT/RTGS in online mode. Amount To be entered (Rs in Lakhs)
Bid Security Amount - (Rs. In Lakhs) Bid Security Amount - Rs.
3 (i) Legal Status of Bidder.
(ii) Place of Registration.
(iii) Principal place of Business
(iv) Power of attorney of signatory Bid Attached (If any) or Not
4 Total value of civil engineering construction work performed in last five years. (Supported by UDIN) 1. Annual Financial Turn Over usually not less than 50% of the estimated value of contract (Rs in Lakhs)
2021 - 2022 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.17
2022- 2023 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.26
2023- 2024 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.36
2024- 2025 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.36
2025- 2026 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.47
5 Work Experience of Similar nature Satisfactory completed atleast one similar work of value not less than 10% of estimated value of contract (Rs in Lakhs) Amount To be entered (Rs in Lakhs)
6 Minimum Quantities of work done as prime contractor in any one year during last five years. Items Unit Quantity
Earth Work (Excavation, Filling , Back Filling etc. in combined quantities in M3) M3 884 Value to be entered in unit Cum.
Cement Concrete (PCC/ RCC/PSC in combined quantities) M3 864 Value to be entered in unit Cum.
Protection Works (Pitching/crating/Soling with Boulder/Brick/GeoBags/EC bags/Nylon crates/Gabion etc.(M3) M3 30 Value to be entered in unit Cum.
Work of Fabrication & erection of gates/steel structures Nos. 2 Value to be entered in unit No.
7 Bidding Capacity: More than the total Bid value of present work = A*N*3-B=Rs. ____.Where A = Maxm. Value of work executed in any one yr during last 5 yrs. N= Nos of years for completion of works. B=Value of existing commitments & ongoing works to be completed in period Lacs
(a) Existing commitments and ongoing works Amount To be entered (Rs in Lakhs)
(b) Work for which Bid already submitted Amount To be entered (Rs in Lakhs)
8 Availability of key items of Contractor's Equipment Type of Equipment/Maximum age No. Required Nos. Required Max. Age in years Nos./ Max. Age
Concrete Mixes with integral weigh batching facilty 8 5
Pocklain/Hydraulic Excavator/ Front End Loader or any other loadinbg machine 10 8
Tractor/Tipper/Dumper 12 5
Electric Welding set suitable for 8mm and 10mm welding electrodes 5 5
Gas Cutting Set 3 5
Grinding Machine 2 5
Diesel Generating Set of atleast 15 KVA 2 5
Chain Pulley Block of sufficient lift (of atleast 10 Ton) 3 5
Pneumatic Tools i.e. Magnetic Drill machine, Chipping Hammer, Chisel, Hammer, Wrench, Grouter machine, etc. 3 5
Sand Blasting Equipments (Chamber/Hopper, Blasting air Hope and other, ceramic nozzles) 3 5
9 Key Personnel Key Personnel/Qualification Nos. Required Name of the Personnel and Experince in years
Project Manager -B.E. Civil + 10 Years Exp. (5 years as Manager) or retired E.E. 1
Site Engineer-B.E. Civil+ 07 years Exp (3 years experience of Irrigation works) or retired A.E. 1
Site Supervisor - Fresh Graduate in Civil or Diploma Civil + 03 years Exp. Or retired ITI Holder 2
Site Engineer-B.E.Mechanical+ 07 years exp.or retired A.E(Mech.) 1
Site Supervisor - Fresh Graduate in Mechanical-01 nos or Diploma Mechanical -01 nos + 03 years Exp. Or retired ITI Holder 2
10 Evidence of accesses to Financial Resources Evidence of access to or availability of creadit facilities (10% of estimated cost), certified by bankers (Not more than 3 months old). (Rs in Lakhs). Amount To be entered (Rs in Lakhs)
11 Proposed methodology and programme of construction. Justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion as per milestones. (Attached or not)
12 Litigation History Information regarding any litigation, current or during the last five years, in which the Bidder is involved, the parties concerned, and disputed amount. (Attached or not)
13 Affidavit Affidavit should be submitted in the format as per the Annexure-3 of the Water Resources Department letter no. 536 dated 13.06.2013 .
14 Undertaking Able to invest a minimum of cost upto 25% of contract value of work. During implementation of contract.( in Lakhs)
15 Registration No.
16 Character Chertificate (As per letter no. 124 dated 04.02.2021 of WRD.)
17 I.T. & GST Registration
18 NOC for Debar (If required)
QUALIFICATION INFORMATION
The information to be filled in by the Bidder in the following pages will be used for purposes of post qualification as provided for in Clause 4 of the Instructions to Bidders. This information will not be incorporated in the Contract.
NAME OF THE CONTRACTOR
1 For Individual Bidders
1.1 Constitution or legal status of Bidder (Attach copy)
Place of registration :
Principal place of business :
Power of attorney of signatory of Bid (Attach)
1.2 Total value of Civil Engineering construction work performed in the last five years** (in Rs. Million)
1.3.1 Work performed as prime contractor, work performed in the past as a nominated sub- contractor will also be considered provided the sub-contract involved execution of all main items of work described in the bid document, provided further that all oth
NAME OF THE CONTRACTOR
Project Name Name of the Employer* Description of work Contract No. Value of Contract (Rs. In Crore) Date of issue of work order Stipulated period of completion Actual date of completion* Remarks explaining reasons for delay & work completed)
* Attach certificate(s) from the Engineer(s)-in-Charge
** Upto last day of the month Immediately preceding the last date of bids received. (PWD letter no. 2863(E) dt. 7.6.2017
Attach certificate from Chartered Accountant.
1.3.2 Quantities of work executed as prime contractor, work performed in the past as a nominated sub-contractor will also be considered provided the sub-contract involved execution of all main items of work described in the bid document, provided further
NAME OF THE CONTRACTOR
Year Name of the work Name of the Employer* Quantity of work performed (cum) @ Remarks
Earth Work (Excavation, Filling , Back Filling etc. in combined quantities in M3) Cement Concrete (P.C.C., R.C.C., P.S.C, etc. in combined quantities in M3 ) Non Bituminous work (GSB/WMM/WBM in M3) Bituminous work (DBM/BM/SDBC/BC/PMC M3) Remarks* (indicate contract Ref)
1.4 Information on Bid Capacity (works for which bids have been submitted and works which are yet to be completed) as on the date of this bid.
(A) Existing commitments and on-going works:
NAME OF THE CONTRACTOR
Description of works Place & State Contract No. Name & Address of Employer Value of Contract (Rs Cr) Stipulated Period of Completion Value of works* remaining to be completed (Rs Cr) Anticipated date of completion
* Attach certificate(s) from the Engineer(s)-in-Charge
The item of work for which data is requested should tally with that specified in ITB clause 4.5A ©
** Immediately preceding the financial year in which bids are received.
# Delete, if prequalification has been carried out.
(B) Works for which bids already submitted :
Description of works Place & State Name & Address of Employer Estimated value of works (Rs Cr) Stipulated period of completion Date when decision is expected Remarks, if any
1.5 Availability of key items of Contractor’s Equipment essential for carrying out the Works [Ref. Clause 4.5(B)(a)]. The Bidder should list all the information requested below. Refer also to Sub Clause 4.3 (d) of the Instruction to Bidders.
NAME OF THE CONTRACTOR
Description of works Requirement Availability proposals Remarks (from whom to be purchased)
No. Capacity Owned/Leased to be procured Nos./Capacity Age/ Condition
1.6 Qualifications and experience of key personnel required for administration and execution of the Contract [Ref. Clause 4.5(B)(b)]. Attach biographical data. Refer also to Sub Clause 4.3 (e) of instructions to Bidders and Sub Clause 9.1 of the Condition
NAME OF THE CONTRACTOR
Position Name Qualification Year of Experience (General) Years of experience in the proposed position
1.7 Proposed sub-contracts and firms involved. [Refer ITB Clause 4.3(k)]
NAME OF THE CONTRACTOR
Sanction of the works Value of Sub-contract Sub-contractor (Name & Address) Experience in similar work
Attach copies of certificates on possession of valid license for executing water supply/ sanitary work/ building electrification works [Reference Clause 4.5(d) & Clause 4.5(e)]
*1.8 Financial reports for the last five years: balance sheets, profit and loss statements, auditors' reports (in case of companies/corporation), etc. List them below and attach copies.
1.9 Evidence of access to financial resources to meet the qualification requirements: cash in hand, lines of credit, etc. List them below and attach copies of support documents.
1.10 Name, address and telephone, telex and fax numbers of the Bidders' bankers who may provide references if contacted by the Employer.
1.11Information on litigation history in which the Bidder is involved.
NAME OF THE CONTRACTOR
Other Party(ies) Employer Cause of Dispute Amount involved Remarks showing Present Status
1.12 Statement of compliance under the requirements of Sub Clause 3.2 of the instructions to Bidders. (Name of Consultant engaged for project preparation is ** ........................ …………….............................)
Proposed work method and schedule. The Bidder should attach descriptions, drawings and charts as necessary to comply with the requirements of the Bidding documents. [Refer ITB Clause 4.1 & 4.3(1)]
1.15 Quality Assurance Programme
2 Additional Requirements
2.1 Bidders should provide any additional information required to fulfill the requirements of Clause 4 of the Instructions to the Bidders, if applicable.
(ii) Undertaking
*** (iii) Update of original prequalification application
*** (iv) Copy of original prequalification application
*** (v) Copy of prequalification letter
* Delete, if prequalification has been carried out.
** Fill the Name of Consultant.
*** Delete, if prequalification has not been carried out.
Check List for Submission Of Tender
Evaluation will be done as per the information provided in the document attached with tender. Bidder may disqualified, if documents are not attached properly.
Name of the Bidder
Sl. No. Checklist Items (Attach Documents in Link Name As Given in Adjacent coloumn in Edit Attachment Folder) Link Name in Edit Attachment Document attached
1 BIDSECURITY PHOTO COPY BID SECURITY PC
2 LAST 5 YEARS ANNUAL TURN OVER ANNUAL TURN OVER
3 EXPERIENCE Of SIMILAR NATURE Of W0RKS EXP SIM NAT
4 QUANTITY OF WORK (E/W, GSB, WMM, BITUMINOUS WORK, PCCetc) EXECUTED DURING LAST 5 YEARS) WORK EXE QTY
5 BALANCE VALUE OF ON GOING WORKS BAL VAL WORKS
6 EXISTING COMMITMENTS EXIST COMT
7 BANKER'S CERTIFICATE FOR ACCESS OF FINACIAL RESOURCES BANK CER
8 AFFIDAVIT AFFIDAVIT
9 UNDERTAKING FOR BID VALIDITY, INVESTMENT ABILITY, NON ASSOCIATION WITH OFFICIALS. UNDERTAKING
10 LITIGATION HISTORY LIT HIS
11 PLANT and MACHINARIES PT & MAC
12 KEY PERSONNEL KEY PER
13 Registration REGISTRATION
14 Power of Attoney POW AT
15 Legal Status Of Bidder LEGAL
16 PROGRAMME Of CONSTRUCTION PROG CONS
17 LABOUR LICENSE LAB LIC
18 IT & ST REGISTRATION and CLEARANCE CERTIFICATE IT ST CLEARANCE
19 NOC FOR DEBAR DEBAR
20 Proposal of sub-Contract SUB-CONTRACT
21 Joint Venture JV
22 Character Chertificate CC
IF YOU HAVE NOT BEEN DEBARED WRITE "NOT APPLICABLE" IN YOUR LETTER HEAD SCAN AND UPLOAD IN THE IN NOC FOR DEBAR LINK
Note:-Attachment should be self attested and should be attached as per above instruction, otherwise it may be rejected.
I, the undersigned, do hereby certify that all the statements made in the required attachments are true and correct.
Signature & Seal of the Bidder
BOQ for Modification work on the navigation channels located at different points along the Western main canal and Ara main canal.
Sl. No. SOR Description of Item Quantity Total Quantity Unit Rate Amount
Dehri Bikramganj Ara
1 5.8.7 Demolishing brick work including stacking of serviceable material and disposal of unserviceable material within 50 metres lead: (SOR-5.7.8) 47.49 0.00 0.00 47.49 M3 714.70 33941.10
2 5.8.8 Demolishing cement concrete including disposal of fmaterial wihin 50 metre lead: 8.320 0.00 0.00 8.32 M3 1258.80 10473.22
3 5.1.27 Earth work in excavation of foundation trenches in odinary soil (vide clasification of soil item A ) and disposal of excavated earth so obtained to a distance upto 50 mtr and average lift of 1.5 mtr including levelling ,ramming the foundation trenches, removing the roots of shrubs etc. all complete as per specifications and direction of E/I. 693.00 360.09 1618.29 2671.38 M3 201.60 538550.21
4 5.7.14 Providing brick flat soling with designation 100A bricks joints filled with coarse sand of approved quality including royalty etc. all complete as per approved design, specifications and direction of E/I 212.29 240.08 1554.73 2007.10 M2 297.60 597312.96
5 5.3.18 |Providing shuttering including strutting, propping etc. and its removal after use in foundation as per specifications and direction of E/I. 97.15 0.00 2507.40 2604.55 M2 590.30 1537465.87
6 5.3.19 Providing shuttering including strutting. Proping etc. and its removal after use in various components of canal structure or embankment structure as per specifications and direction of E/I. 850.74 1305.34 3385.76 5541.84 M2 590.30 3271348.15
7 5.3.5 Providing and laying P.C.C. or R.C.C M-200 with nominal mix of (1:1.5:3 ) in foundation of various components of canal or embankment structures with approved quality of qraded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing., royalty and all taxes etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I. 0.00 7.26 0.00 7.26 M3 7745.40 56231.60
8 5.3.4 Providing and laying P.C.C. or R.C.C M-150 with nominal mix of (1:2:4 ) in foundation of various components of canal or embankment structures with approved quality of qraded coarse aggregate of required grade (as per design ) and approved quality sand of requisite F.M washed and screened including necessary tools and plants, vibrating, curing., royalty and all taxes etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I 0.00 60.02 355.13 415.15 M3 7177.40 2979697.61
9 5.3.6 Providing and laying P.C.C. or R.C.C M-250 with nominal mix of (1:1.:2)in foundation of various components of canal or embankment structures with approved-quality of graded coarse aggregate of required-grade (as per design) and approved quality sand of requisite F.M washed -and screened including necessary tools and plants, vibrating, curing. exeluding-cost of form work as well reinforcement, its cutting, bending, binding and -placing complete job including royalty as per specifications and direction of E/I. (Taking Rate of approved quality of aggregate as per Design)( Rate of Coarse aggregates 20 mm To 10 mm Taken ) 178.8 184.88 1460.85 1824.53 M3 9145.40 16686056.66
10 5.3.11 Providing and laying P.C.C. or R.C.C M-250 with nominal mix of (1:1:2) in superstructure of various components of canal or embankment structures with lapproved guality of graded coarse aggregate of required grade (as per design) and aporoved quality sand of requisite F.M washed and screened including Irrecpssery iools and plants, vibrating, curing royalty etc. excluding cost of [form work as well reinforcement, its cutting, bending, binding and placing lcorrplete job as per specifications and direction of E/I. (Taking Rate of approved quality of aggregate as per Design)( Rate of Coarse -aggregates 120 mim To 10 mm Taken ) 333.74 277.38 1431.81 2042.93 M3 9091.00 18572276.63
11 5.1.31 Earth work in filling in foundation trenches and back filling of structure in layers not exceeding 150 mm thick well watered, rammed and fully compacted and finally dressed with suitable earth obtained fromexcavation of foundation trenches and placed in a suitable profile with in alead of 30 M and lift of 1.5 M, all complete job as per specification and direction of E/I 346.5 160.05 1242.12 1748.67 M3 153.90 269120.31
12 5.3.22 |Providing M.S reinforcement ( Tor steel ) as per approved design, drawing,removal of rust, cutting, bending, binding, including supplying annealed wire, placing M.S rods in position complete job as per specifications and direction of E/I. 0.00 0.00
13 5.7.13 Supply & Labour for laying fine filter (Sand) or coarse dry graded filter either of jhama khoa or stone metal or stone chips under brick pitching or boulder pitching in slope and apron including light ramming etc.all complete job as per specification and direction of E / I.) 0.00 2.21 0.00 2.21 M3 531.10 1173.73
14 5.3.17 Providing and laying dry pitching with precast cement concrete blocks of size 600 mm x 600 mm x 300 mm in M-100 with nominal mix of (1:3:6) in floor and flank wall with approved quality of graded coarse aggregate of required grade( as per design ) and approved quality of sand of requisite F.M washed and screened including necessary form work, tools and piants, vibrating, curing as wll as royalty and all complete as per specifications and direction of E/I. 19.87 2.21 7.69 29.77 M3 9390.40 279552.21
15 5.2.2 Providing filter of stone chips 20 mm and down well graded as per design for lined canal, rains including hand packing, etc . all complete as per specification and direction of E/I 2.30 0.00 6.49 8.79 M3 1836.40 16141.96
16 5.8.2 [Supplying, fiting and fixing rubber seal of ( water stop ) of approved quality for construction joints expansion joints complete job as per drawing, specifications and direction of E/l. 28.2 28.20 137.40 193.80 Per M 822.30 159361.74
17 5.1.37 Providing corase clean local sand in filling in foundation trenches including ramming,watering, royalty and all other taxes complete job as per specifications and direction of E/I. 0.00 24.01 196.73 220.74 M3 378.90 83638.39
18 5.8.6(a) Providing weep holes with dry graded stone single filter of 20 mm to 40 mm size in abutment and wing wall including royalty as per specification and direction of E/I 49.0 132.0 550.0 731.00 Each 168.90 123465.90
19 (A) Carriage of materials For Dehri Division 0.00
Cement From Local Market to work site Lead-02 Km Surface road (Avg.) 315.41 MT 318.00 100300.38
Steel From Local Market to work site Lead-02 Km Surface road (Avg.) 20.690 MT 318.00 6579.42
coarse Sand From Dehri to work site Lead- (7km s+01 km k) (Avg.) 223.830 M3 373.40 83578.12
Stone Chips From Ahiraura Quarry to work site (Avg.) 447.660 M3 1796.70 804310.72
Bricks From Local market to work site Lead-7 km Surface road and 1 km katcha (Avg.) 6.85 %0 NOS 1894.00 12973.90
Local Sand From Nearest place to work site Lead - 2 km Surface road and 1 km katcha (Avg.) 3.27 M3 227.00 742.29
20 (B.) Carriage of materials For Bikramganj Division
At Dhelabagh Navigation Lock at km 9.00
Cement From Nasriganj to work site Lead-10 Km Surface road and 1 km Un-Surface (Avg.) 210.32 Per MT 544.00 114414.08
Steel From Nasriganj to work site Lead-10 Km Surface road and 1 km Un-Surface (Avg.) 26.19 Per MT 544.00 14247.36
Coarse Sand From Nasriganj to work site Lead- 10 km Surface road and 1 km Un-Surface (Avg.) 169.11 Per m3 415.30 70231.38
Stone Chips From Domchas quarry site to work site . 351.77 Per m3 2044.40 719158.59
Local Sand From Nearest place to work site Lead -2 km Surface road and 1 km katcha (Avg.) 38.06 Per m3 227.00 8639.62
Bricks From Local market to work site Lead-7 km Surface road (Avg.) 7.43 %0 No's 1894.00 14072.42
At Nasariganj Navigation Lock at km18.77
Cement From Nasriganj to work site Lead-3 Km Surface road and 1 km Un-Surface (Avg.) 210.32 Per MT 373.00 78449.36
Steel From Nasriganj to work site Lead-3 Km Surface road and 1 km Un-Surface (Avg.) 26.19 Per MT 373.00 9768.87
Coarse Sand From Nasriganj to work site Lead- 4 km Surface road and 1 km Un-Surface (Avg.) 169.11 Per m3 275.10 46522.16
Stone Chips From Domchas quarry site to work site . 351.77 Per m3 2161.30 760280.50
Local Sand From Nearest place to work site Lead -2 km Surface road and 1 km katcha (Avg.) 38.06 Per m3 227.00 8639.62
Bricks From Local market to work site Lead-7 km Surface road (Avg.) 7.43 %0 No's 1894.00 14072.42
21 (A)Carriage of materials for Ara, Piyaniya,Sakhua & Pawna Lock under Ara Division
Cement From Local Market to work site Lead- Avg 11 Km Surface road 719.23 MT 410.30 295100.07
Steel From Local Market to work site Lead- Avg 11 Km Surface road 55.60 MT 410.30 22812.68
Coarse Sand From Sandesh to work site Lead- Avg 30 Km (29S+0U+1K)Km 532.02 m³ 887.70 472274.15
Stone Chips From Domchas quarry site to work site . 1066.61 m³ 3633.40 3875420.77
Bricks From Local market to work site Lead-7 km Surface road and 1 km katcha 20.06 %0 No.s 1894.00 37993.64
Local Sand From Nearest place to work site Lead - 2 km Surface road and 1 km katcha 88.00 m3 227.00 19976.00
22 (B)Carriage of materials for Diliya, Chauri & Harpur Lock Under Ara Division
Cement From Ara to work site Lead-Avg 38 Km Surface road 554.99 MT 884.70 490999.65
Steel From Ara to work site Lead-Avg 38 Km Surface road 42.43 MT 884.70 37537.82
Sand From Muzaffarpur to work site Lead-Avg 20 Km (19S+0U+1K) 410.37 m³ 654.00 268381.98
Stone Chips From Domchas quarry site to work site . 823.07 m³ 2979.10 2452007.84
Bricks From Local market to work site Lead-7 km Surface road and 1 km katcha 15.05 %0 No.s 1894.00 28504.70 622728
Local Sand From Nearest place to work site Lead - 2 km Surface road and 1 km katcha 66.04 m3 227.00 14991.08
23 (C)Carriage of materials for Sawari , Paharma & Danwar Lock under Ara Division
Cement From Local Market to work site Lead-Avg 5 Km Surface road 599.63 MT 392.00 235054.96
Steel From Local Market to work site Lead-Avg 5 Km Surface road 44.94 MT 392.00 17616.48
Sand From Andhari to work site Lead- Avg 20 Km(18S+1U+1K) 441.13 m³ 654.00 288499.02
Stone Chips From Domchas quarry site to work site . 884.30 m³ 2371.60 2097205.88
Bricks From Local market to work site Lead-7 km Surface road and 1 km katcha 15.05 %0 No.s 1894.00 28504.70
Local Sand From Nearest place to work site Lead - 2 km Surface road and 1 km katcha 66.02 m3 227.00 14986.54
SEIGNIORAGE FEE @ 10% 1016210.20
SUB TOTAL 78250990.83
TOTAL CIVIL WORK (A) 92336169.18
B.O.Q for mechanical work of navigation Channel under Mechanical Division,Dehri.
Name of Work- Design, Drawing, Fabrication, Supply, Erection and Commissioning of 01 no. C/R Vertical lift Fixed Wheel gate at Hadhadwa, Akhodigola, Dhelabagh, Nasariganj, Paharma, Sawari, Danwar, Harpur, Chauri,Diliya, Pawna, Sakhua, Piyania, and Ara lock gate point with all allied accessories including Embedding, Hoisting Arrangement, Trustle, Platform, Stairs etc.
A Fabrication, Supply, Erection, Testing and Commissioning of Vertical lift fix wheel gate consisting of Skin plate, Horizontal and Vertical Stiffeners, Bracings, Lifting lug Arrangement, Rubber seals, Roller assembly and its Bearings, Side guide assembly, Clamp plates etc., including cost of misc. materials, jig and fixture, handling, painting etc. alongwith Workshop, Transportation, Erection charges etc. as per specification and direction of E/I.
Location Qty Cost/unit
(i) For Hadhadwa, Akhodigola,Dhelabagh, Nasriganj, Paharma & Sawari Lock gate Point 6 1453702
(ii) For Danwar Lock gate Point 1 1372564
(iii) For Harpur and Chauri lock gate point 2 979933
(iv) For Diliya, Pawna, Sakhua, Piyania, & Ara Lock gate piont 5 913319
Total (A) 16621237
B Fabrication, Supply, Erection and Commissioning of Trustle assembly consisting of Column, Bracing, Horizontal member, Cross member, Gusset plate, Base plate for top & bottom, Guide base plate etc. with all other accessories including cost of misc. materials, jig and fixture, handling, painting etc. alongwith Workshop, Transportation, Erection charges etc. as per specification and direction of E/I.
Location Qty Cost/unit
(i) For Hadhadwa, Akhodigola,Dhelabagh, Nasriganj, Paharma & Sawari Lock gate Point 6 602915
(ii) For Danwar Lock gate Point 1 565843
(iii) For Harpur and Chauri lock gate point 2 496132
(iv) For Dilia, Pawna, Sakhua, Piyania, & Ara Lock gate piont 5 478137
Total (B) 7566282
C Fabrication, Supply, Erection and Commissioning of Embedding consisting of Bottom seal beam, Anchor plate, Bottom seal seat, Guide and its base plate, Wheel track, Wheel track seal seat, Side seal track base, MS palte cut to shape, Side track seal seat etc. with all other accessories including cost of misc. materials, jig and fixture, handling, painting etc. alongwith Workshop, Transportation, Erection charges etc. as per specification and direction of E/I.
Location Qty Cost/unit
(i) For Hadhadwa, Akhodigola,Dhelabagh, Nasriganj, Paharma & Sawari Lock gate Point 6 420264
(ii) For Danwar Lock gate Point 1 390161
(iii) For Harpur and Chauri lock gate point 2 317889
(iv) For Diliya, Pawna, Sakhua, Piyania, & Ara Lock gate piont 5 286982
Total (C) 4982433
D Fabrication, Supply, Erection and Commissioning of Hoisting support structure along with Platform and Ladder consisting of Horizontal beam, Cross beam, Chequred plate with frame, Verttical post & Horizontal railing etc. for Platform and Main beam, Framing of step, Steps chequred plate vertical post and horizontal railing for ladder etc. Including cost of misc. materials, jig and fixture, handling, painting etc. alongwith Workshop, Transportation, Erection charges etc. as per specification and direction of E/I.
Location Qty Cost/unit
(i) For Hadhadwa, Akhodigola,Dhelabagh, Nasriganj, Paharma & Sawari Lock gate Point 6 1151894
(ii) For Danwar Lock gate Point 1 1116327
(iii) For Harpur and Chauri lock gate point 2 1048139
(iv) For Diliya, Pawna, Sakhua, Piyania, & Ara Lock gate piont 5 1036158
Total (D) 15304759
E Fabrication Supply, Erection testing and Commissioning of adequate capacity electrically operated rope drum hoist according to relevant SI code Rope drum, Connecting shaft, Gear system, Reduction gear unit, Electric motor, Electromagnetic Brake system, Control panel, Pulley, Wire, Gate, Position indicator, Limit switch with inbuilt manual operating system etc complete with all accessories including cost of misc. materials, jig and fixture, handling, painting etc. alongwith Workshop, Transportation, Erection charges etc. as per specification and direction of E/I
Location Qty Cost
(i) For Hadhadwa, Akhodigola,Dhelabagh, Nasriganj, Paharma & Sawari Lock gate Point for approx 12T 6 802920
(ii) For Danwar Lock gate Point for approx 10T 1 669100
(iii) For Harpur, Chauri, Diliya, Pawna, Sakhua, Piyania, & Aralock gate point approx 8T 7 535280
Total (E) 9233580
TOTAL MECHENICAL WORK (B) 64009541.21
TOTAL (CIVIL + MECHENICAL) WORK 156345710.00 156351440 -5730.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
SBD_25.09.26.doc
NIT • 8.39 MB
NIB.pdf
NIT • 2.21 MB
Refrance Circulars 1.pdf
NIT • 22.58 MB
Refrance file 2.pdf
NIT • 0.22 MB
Lt 201 dt 28.02.2025.pdf
NIT • 1.93 MB
Technical_Sheet 25.09.26.xls
NIT • 0.16 MB
BOQ_Final.xlsx
NIT • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .