| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L3₹9.4 L+₹2.5 L (36.1%)Accepted-AOC | ₹9.4 L+₹2.5 L (36.1%) Quoted ₹9.3 L | L3 | Accepted-AOC WORK ORDER ISSUED |
| 2 | L1₹6.9 LRejected-Finance | ₹6.9 L | L1 | Rejected-Finance DISQUALIFIED |
| 3 | L2₹7.2 L+₹34,049.69 (4.97%)Rejected-Finance | ₹7.2 L+₹34,049.69 (4.97%) | L2 | Rejected-Finance DISQUALIFIED |
| 4 | L4₹9.4 L+₹2.5 L (36.5%)Rejected-Finance | ₹9.4 L+₹2.5 L (36.5%) | L4 | Rejected-Finance DISQUALIFIED |
Tender Value
₹9.4 L
EMD Value
₹19,000
Closing Date
29 Jun 2026, 5:00 pmClosed
EXECUTIVE OFFICER
EXECUTIVE OFFICER NAGAR PANCHAYAT DOMCHANCH
construction of rcc slab at for placing at different ward of Domchanch Nagar Panchayat (Group No. 01)
2026_UDD_115333_1
UDD/DNP/03/2026-27
Open Tender
Civil Works
Percentage
60 days
KODERMA
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹19,000
19 Sept 2026
18 Jun 2026
30 Jun 2026
18 Jun 2026
29 Jun 2026
18 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling R.C.C. work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. | 61.88 | M3 | 1,993.04 | ₹1,23,329.32 |
| 2 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 41.25 | M3 | 5,218 | ₹2,15,242.5 |
| 3 | Providing TMT reinforcement bar ........ do ........ do ............E/I. 10 mm dia main bar [5.5.5.a] | 4.41 | Mt | 82,096.54 | ₹3,62,045.74 |
| 4 | centring and shuttering for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 155.05 | M2 | 372.72 | ₹57,790.24 |
| 5 | Carriage of Materials :-
Sand 1 KM (k)+5 KM (P) | 17.7 | M3 | 395.8 | ₹7,005.66 |
| 6 | cement 5 KM (P) | 16.99 | Mt | 437.5 | ₹7,433.12 |
| 7 | Chips 1 KM (k)+34 KM (P) | 35.39 | M3 | 340.28 | ₹12,042.51 |
| 8 | GST 18% | - | percent | 0.18 | - |
| 9 | Labour Cess 1% | - | percent | 0.01 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_155930.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
TENDER_DOCUMENTS.pdf
Tender Documents • 1.94 MB
BOQ_155930.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .