Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 01 KATYANI CONSTRUCTION COMPANY H NO 1 SHOP NO 1 RATAN LAL NAGAR KANPUR NAGAR UTTAR PRADESH 208022 | KANPUR NAGAR | UTTAR PRADESH | 208022 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical PLOT NO F158 PHASE 8B INDUSTRIAL AREA MOHALI MOHALI MOHALI PUNJAB 160071 | S A S NAGAR | PUNJAB | 160071 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.9 L
EMD Value
₹2,000
Closing Date
24 Mar 2021, 12:00 pmClosed
Superintending Engineer
Electricity Transmission Circle Agra Kakraitha Road, Near Amar Ujala Press, Sikandara , Agra
Loading, unloading and carriage of 40 MVA Transformer at 132 KV S/S Pinahat under ETD-III Agra
2021_UPTCL_546321_2
ET_138_ETC_A_20 21
Open Tender
Electrical Works
Lump-sum
120 days
Agra
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE_ETD II Agra
₹2,000
27 Mar 2021
2 Mar 2021
25 Mar 2021
2 Mar 2021
24 Mar 2021
2 Mar 2021
Loading of 40 MVA,132/33 KV T/F at 132 kv Fatehabad, Agra with all accessories on trailor, truck, jacking the transformer tank for placing the wooden sleepers under transformer tank and similarly lifting the T/F tank by the jacking and placing the sleepers continously till the wooden platform comes to the height of trailor bed and then shifting the T/F tank from wooden plateform to the trailor, proper tightening of T/F mounted on the trailor with the help of wire rope and heavy turn buckle for safe transporation to 132 KV S/S Pinahat.
Safe carriage of 40 MVA T/F , accessories and T/F oil on private truck/ trailor to be provided by contractor from 132 KV S/S Fatehabad to 132KV S/S Pinahat (total distance approximately 40 Km.).The insurnace shall be got done by contractor as per direction of supervising engineer be reimbursed on actuals
Unloading of 40 MVA T/F with accessories and T/F oil, from trailor/truck by jacking the T/F tank for placing the rails under the tank and shifting it to wooden sleeper platform. Removeing the rails under the tank on wooden sleepers, lowering the tank towards ground by slowly and removing the wooden sleepers under the tank at 132 KV S/S Pinahat
ARK ENGINEERING
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .