Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAdmitted-Fee/PreQual/Technical/Finance | ₹2.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.5 LAdmitted-Fee/PreQual/Technical/Finance 6 31 B THOOKANAMPATTY METTUR DAM 636401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | ₹2.5 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.5 LAdmitted-Fee/PreQual/Technical/Finance | ₹2.5 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹2.6 LAdmitted-Fee/PreQual/Technical/Finance NO 5 2 3 CV NAIDU SALAI THIRUVALLUR TAMILNADU 602001 | THIRUVALLUR | TAMIL NADU | 602001 | ₹2.6 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹2.6 LAdmitted-Fee/PreQual/Technical/Finance | ₹2.6 L | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | SRI LAKSHMI ENTERPRISES L2 | M/S. MUTHU ENTERPRISES L1 | L SATHISH KUMAR L8 | Vijayan Bhavani L5 | M/S.J M Constructions L7 | K.S.CHOKALINGAM L6 | RS ENTERPRISES L3 | KUMARAN ENGINEERING ENTERPRISES L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.001. CONSTRUCTION OF SEGREGATION SHED IN ELIYAMBEDU VILLAGE @ ELIYAMBEDU PANCAHYAT IN MINJUR PANCHAYAT UNION UNDER SBM- PHASE -II/2026 - 2027/MJR15 | |||||||||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation complete as per standard specification. | 3.76 | CUM | 222 ₹834.72 | 222 ₹834.72 | 263.5 ₹990.76 | 232 ₹872.32 | 225 ₹846 | 250 ₹940 | 224 ₹842.24 | 220 ₹827.2 Lowest |
| 3.00 | Filling with M.Sand including cost and coveyance of all materials to work site and all labour charges etc., complete as per standard specification. | 4.05 | CUM | 1,949 ₹7,893.45 | 1,853 ₹7,504.65 | 2,222.5 ₹9,001.13 | 1,942 ₹7,865.1 | 1,500 ₹6,075 | 2,000 ₹8,100 | 1,875 ₹7,593.75 | 1,450 ₹5,872.5 Lowest |
| 4.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc., complete as per standard specification. | 5.02 | CUM | 5,178 ₹25,993.56 | 5,049 ₹25,345.98 | 6,000.2 ₹30,121 | 5,290 ₹26,555.8 | 450 ₹2,259 | 5,300 ₹26,606 | 5,109 ₹25,647.18 | 440 ₹2,208.8 Lowest |
| 5.00 | Supplying and erecting for sides & soffits including supports and strutting for plane surface in all floors including cost and conveyance and all labour charges etc., complete | 5.73 | SQ.M | 460 ₹2,635.8 Lowest | 460 ₹2,635.8 Lowest | 547 ₹3,134.31 | 482 ₹2,761.86 | 4,500 ₹25,785 | 500 ₹2,865 | 465 ₹2,664.45 | 4,400 ₹25,212 |
| 6.00 | Cement Concrete 1:3:6 mix using 20 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed. | 0.4 | CUM | 5,818 ₹2,327.2 | 5,689 ₹2,275.6 | 6,751.5 ₹2,700.6 | 5,960 ₹2,384 | 4,900 ₹1,960 | 6,000 ₹2,400 | 5,757 ₹2,302.8 | 4,800 ₹1,920 Lowest |
| 7.00 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc., complete as per standard specification | 2.09 | CUM | 5,301 ₹11,079.09 | 5,228 ₹10,926.52 | 6,272.2 ₹13,108.9 | 5,477 ₹11,446.93 | 5,250 ₹10,972.5 | 5,477 ₹11,446.93 | 5,290 ₹11,056.1 | 5,200 ₹10,868 Lowest |
| 8.00 | Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 30.91 | SQ.M | 245 ₹7,572.95 | 243 ₹7,511.13 | 289 ₹8,932.99 | 255 ₹7,882.05 | 250 ₹7,727.5 | 255 ₹7,882.05 | 246 ₹7,603.86 | 235 ₹7,263.85 Lowest |
| 9.00 | Paving the floor with kota stone slab of size 600 x 600 of 18 / 20mm (un-polished) in all floors laid in of cement mortor 1:3 (one cement three M.Sand), 20mm thick and pointed with colour cement neatly including polishing with polishing stone and oxalic acid etc., so as to perfectly smooth and glossy and including hire charges for polishing machine and power consumption charges etc. The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification. | 27 | SQ.M | 1,423 ₹38,421 | 1,421 ₹38,367 Lowest | 1,688 ₹45,576 | 1,488 ₹40,176 | 1,800 ₹48,600 | 1,488 ₹40,176 | 1,438 ₹38,826 | 1,750 ₹47,250 |
| 10.00 | Cement Concrete 1:2:4 mix using 20 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed. | 0.33 | CUM | 6,290 ₹2,075.7 | 6,161 ₹2,033.13 Lowest | 7,291 ₹2,406.03 | 6,455 ₹2,130.15 | 8,500 ₹2,805 | 6,455 ₹2,130.15 | 6,235 ₹2,057.55 | 8,000 ₹2,640 |
Tender Value
₹3 L
EMD Value
₹3,000
Closing Date
7 Aug 2026, 3:00 pmClosed
BDO (VP) MINJUR BLOCK
MINJIUR BLOCK OFFICE
CONSTRUCTION OF SEGREGATION SHED IN ELIYAMBEDU VILLAGE AT ELIYAMBEDU PANCAHYAT IN MINJUR
2026_RDTN_687737_2
1004/2026/A9
Open Tender
Civil Works
Item Rate
180 days
MINJUR
CLASS V AND ABOVE
4 documents required · 4 mandatory
₹0
₹3,000
Yes
11 Aug 2026
22 Jul 2026
7 Aug 2026
22 Jul 2026
7 Aug 2026
22 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1. CONSTRUCTION OF SEGREGATION SHED IN ELIYAMBEDU VILLAGE @ ELIYAMBEDU PANCAHYAT IN MINJUR PANCHAYAT UNION UNDER SBM- PHASE -II/2026 - 2027/MJR15 | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation complete as per standard specification. | 3.76 | CUM | 263.78 | ₹991.81 |
| 3 | Filling with M.Sand including cost and coveyance of all materials to work site and all labour charges etc., complete as per standard specification. | 4.05 | CUM | 2,206.27 | ₹8,935.39 |
| 4 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc., complete as per standard specification. | 5.02 | CUM | 6,011.06 | ₹30,175.52 |
| 5 | Supplying and erecting for sides & soffits including supports and strutting for plane surface in all floors including cost and conveyance and all labour charges etc., complete | 5.73 | SQ.M | 547.5 | ₹3,137.18 |
| 6 | Cement Concrete 1:3:6 mix using 20 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed. | 0.4 | CUM | 6,773 | ₹2,709.2 |
| 7 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc., complete as per standard specification | 2.09 | CUM | 6,223.84 | ₹13,007.83 |
| 8 | Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 30.91 | SQ.M | 289.81 | ₹8,958.03 |
| 9 | Paving the floor with kota stone slab of size 600 x 600 of 18 / 20mm (un-polished) in all floors laid in of cement mortor 1:3 (one cement three M.Sand), 20mm thick and pointed with colour cement neatly including polishing with polishing stone and oxalic acid etc., so as to perfectly smooth and glossy and including hire charges for polishing machine and power consumption charges etc. The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification. | 27 | SQ.M | 1,691.31 | ₹45,665.37 |
| 10 | Cement Concrete 1:2:4 mix using 20 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed. | 0.33 | CUM | 7,334.78 | ₹2,420.48 |
stage.html
html • 0.03 MB
finance_826622.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
TenderDocumentMJR15.pdf
Tender Documents • 0.33 MB
BOQ_826622.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].