| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹10.1 L+₹46,773.90 (4.86%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | D.VENKATANARAYANA L1 | C Maria Cross L2 |
|---|---|---|---|---|---|
| 1.00 | Providing shuttering for staircase column including cost of all materials, labour, lead, lift, etc. complete as directed by the Engineer incharge of the work. | 38.9 | m2 | 378 ₹14,704.2 Lowest | 390 ₹15,171 |
| 2.00 | Providing PCC 1:2:4 using O.P Cement and 20mm HBG metal including cost of all materials, shuttering charges, lead, lift, labour charges, etc., complete. | 8.8 | m3 | 7,720 ₹67,936 | 7,500 ₹66,000 Lowest |
| 3.00 | Providing two legged scaffolding for plastering damaged beam using 15 cm dia casuarina props, distance between two rows being 1.25m and spacing of posts being 2m in both rows, with two horizontal posts with 0.50m overlap on either side and braces at 2m c/c including longitudinal and transverse middle braces to step up and providing a platform with C.W.Planks of 40mm thick and 1m width etc., complete using coir and nails. | 1,818.8 | m2 | 105 ₹1,90,974 Lowest | 112 ₹2,03,705.6 |
| 4.00 | Removing the rust from steel reinforcement by using Fosroc reeboklens RR chemical including cost of all materials labour , lead, lift etc complete. | 17.1 | m2 | 805 ₹13,765.5 Lowest | 830 ₹14,193 |
| 5.00 | Providing PCC 1:1.5:3 using O.P cement with 6 to 10mm HBG metal along with admixtures of Conplast X 421 chemical, Nito bond chemical including all cost of materials, labour, bariguard, curing, lead, lift etc., complete | 1.8 | m3 | 10,200 ₹18,360 Lowest | 10,500 ₹18,900 |
| 6.00 | Plastering with CM 1:3, 10 mm thick including cost of all materials, labour, lead, lift etc., complete. | 68.3 | m2 | 630 ₹43,029 Lowest | 650 ₹44,395 |
| 7.00 | Painting of steel structures with two coats of Epoxy paint over one coat of zinc phosphate epoxy primer including removing the rust using wire brush cost of all materials, scaffolding charges, T&P, lead, lift, etc., complete and as directed by site Engineer incharge of the work | 1,620 | m2 | 370 ₹5,99,400 Lowest | 390 ₹6,31,800 |
| 8.00 | Painting with two coats of anty corrosive black paint to the coping surface after applying one coat of primer clearing as per the satisfaction of the site Engineer. The rates including cost of all materials, lead, lift, etc., complete. | 38.9 | m2 | 390 ₹15,171 Lowest | 410 ₹15,949 |
Tender Value
Refer Docs
EMD Value
₹9,000
Closing Date
10 Jun 2025, 2:00 pmClosed
SE CM NCTPS II
Office of CE NCTPS II chennai 120
NCTPS II Civil Maintenance Circle Civil Maintenance Division II Repair and maintenance works of steel staircase and concrete structures in fly ash Silo at NCTPS II
2025_EB_561608_1
CE/NCTPS-II/SE/CM/05/2025-26
Open Tender
Civil Works
Works
90 days
NCTPS II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,000
Yes
4 Nov 2025
26 May 2025
11 Jun 2025
26 May 2025
10 Jun 2025
26 May 2025
Amount
Providing shuttering for staircase column including cost of all materials, labour, lead, lift, etc. complete as directed by the Engineer incharge of the work.
Providing PCC 1:2:4 using O.P Cement and 20mm HBG metal including cost of all materials, shuttering charges, lead, lift, labour charges, etc., complete.
Providing two legged scaffolding for plastering damaged beam using 15 cm dia casuarina props, distance between two rows being 1.25m and spacing of posts being 2m in both rows, with two horizontal posts with 0.50m overlap on either side and braces at 2m c/c including longitudinal and transverse middle braces to step up and providing a platform with C.W.Planks of 40mm thick and 1m width etc., complete using coir and nails.
Removing the rust from steel reinforcement by using Fosroc reeboklens RR chemical including cost of all materials labour , lead, lift etc complete.
Providing PCC 1:1.5:3 using O.P cement with 6 to 10mm HBG metal along with admixtures of Conplast X 421 chemical, Nito bond chemical including all cost of materials, labour, bariguard, curing, lead, lift etc., complete
Plastering with CM 1:3, 10 mm thick including cost of all materials, labour, lead, lift etc., complete.
Painting of steel structures with two coats of Epoxy paint over one coat of zinc phosphate epoxy primer including removing the rust using wire brush cost of all materials, scaffolding charges, T&P, lead, lift, etc., complete and as directed by site Engineer incharge of the work
Painting with two coats of anty corrosive black paint to the coping surface after applying one coat of primer clearing as per the satisfaction of the site Engineer. The rates including cost of all materials, lead, lift, etc., complete.
C Maria Cross (BID ID -1358372)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .