Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 LAccepted-AOC | L1 | Accepted-AOC 1st Lowest | |
| 2 | L2₹7.3 L+₹86,220 (13.4%)Rejected-AOC | L2 | Rejected-AOC 2nd Lowest | |
| 3 | L3₹7.7 L+₹1.3 L (19.6%)Rejected-AOC | L3 | Rejected-AOC 3rd Lowest |
Tender Value
₹7.9 L
EMD Value
₹7,939
Closing Date
8 Aug 2026, 4:00 pmClosed
Executive Officer
Jeypore Municipality
As per DTCN
2026_ORULB_137231_14
JM-TCN05/2026-27
Open Tender
Civil Works - Others
Percentage
30 days
Jeypore
As per DTCN
2 documents required · 2 mandatory
₹4,000
₹7,939
Yes
2 Oct 2026
28 Jul 2026
12 Aug 2026
28 Jul 2026
8 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | For lifting and transporting the present RCC slab from Road side to the safe place as instruction of Engineer in charge and place them after finishing the wall of drain to a desire height. | 1 | No | 5,000 | ₹5,000 |
| 2 | Earth work in slushy soil (in water upto 0.6m depth requiring the aid of pans and vessels) with in 50nm initial lead and 1.5m initial lift as per approved by the Department. | 42.12 | Cum | 236.11 | ₹9,944.95 |
| 3 | Cement concrete (1:2:4) with 12mm size hard granite metal per one cum. (P-44/7) | 49.14 | Cum | 7,284.65 | ₹3,57,967.7 |
| 4 | Rigid and smooth centering and shuttering for RCC works including false work. Etc., Complete. | 340.56 | Sqm | 246.21 | ₹83,849.28 |
| 5 | RCC work M-20 grade with 20mm and down grade black hard granite CB stone chips including hoisting and laying.(P-50/4) | 7.47 | Cum | 5,780.22 | ₹43,178.24 |
| 6 | Supplying, fitting and placing uncoated of SAIL TMT BAR reinforcement complete as per drawing and specification. | 10.28 | Qntl | 8,540.5 | ₹87,796.34 |
| 7 | Fly Ash Brick (23x1 lx8cm) size having crushing strength not less than 75kg/ cm2 with cement mortar (1:4) in foundation and plinth per cum. | 2.3 | Cum | 5,771.93 | ₹13,275.44 |
| 8 | Removing Old lime Cement Plaster from walls including racking out joints 12mm deep and removing the debries within 50m lead. | 292.5 | Sqm | 57.7 | ₹16,877.25 |
| 9 | 12mm thick plaster (1:4) | 292.5 | Sqm | 202.02 | ₹59,090.85 |
| 10 | Priming one coat to wall Surafce using water bound cement primer including cost, conveyance all materilas, labour and T and P etc complete. | 503.1 | Sqm | 80.58 | ₹40,539.8 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_603535.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.11 MB
BOQ_603535.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .