| 1.00Name of Work : Repairs to the Check Dam at Karuppagoundenpudur H/O Desipalayam - PUGF - 2025-2026 | |||||
| 2.00 | Earth work excavation and depositing on banks with initial lead of 10 metres and lift of 2 metres in all classes of soil to strengthen the side berms as per SS20 B | 65.34 | Cum | 263.78 ₹17,235.39 Lowest | 270 ₹17,641.8 |
| 3.00 | Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete SOR (W-0085) | 2,889 | Cum | 63.35 ₹1,83,018.15 Lowest | 70 ₹2,02,230 |
| 4.00 | Cement concrete 1:4:8 mix using 40mm guage hard broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15cm thick compacting etc.,complete complying with standard specifications. | 34.35 | Cum | 5,264.3 ₹1,80,828.71 Lowest | 5,300 ₹1,82,055 |
| 5.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc | 195.66 | Sqm | 547.5 ₹1,07,123.85 Lowest | 560 ₹1,09,569.6 |
| 6.00 | Cement concrete 1:3:6 mix using 20mm guage hard broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15cm thick compacting etc.,complete complying with standard specifications. | 18.71 | Cum | 6,020.35 ₹1,12,640.75 Lowest | 6,100 ₹1,14,131 |
| 7.00 | Reinforcement Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. complete | 29.7 | Cum | 9,010.87 ₹2,67,622.84 Lowest | 9,100 ₹2,70,270 |
| 8.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. | 1.76 | Mt | 91,951 ₹1,61,833.76 Lowest | 92,000 ₹1,61,920 |
| 9.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete | 46.97 | Cum | 6,570.34 ₹3,08,608.87 Lowest | 6,600 ₹3,10,002 |
| 10.00 | Provision for Name board | 1 | No | 4,500 ₹4,500 Lowest | 5,000 ₹5,000 |
Tender Value
Refer Docs
EMD Value
₹16,000
Closing Date
4 Dec 2025, 3:00 pmClosed
Block Development Officer (BP) Bhavanisagar
Block Development Officer (BP) Bhavanisagar
Repairs to the Check Dam at Karuppagoundenpudur H/O Desipalayam PUGF - 2025-2026
2025_RDTN_626372_1
Bhavanisagar Block - Desipalayam Panchayat -1480/2025/A2 Dt 25.11.2025
Open Tender
Civil Works
Item Rate
120 days
Block Development Office Bhavanisagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹16,000
Yes
12 Dec 2025
25 Nov 2025
4 Dec 2025
25 Nov 2025
4 Dec 2025
25 Nov 2025
Amount
Earth work excavation and depositing on banks with initial lead of 10 metres and lift of 2 metres in all classes of soil to strengthen the side berms as per SS20 B
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete SOR (W-0085)
Cement concrete 1:4:8 mix using 40mm guage hard broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15cm thick compacting etc.,complete complying with standard specifications.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc
Cement concrete 1:3:6 mix using 20mm guage hard broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15cm thick compacting etc.,complete complying with standard specifications.
Reinforcement Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. complete
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
V PRATHI CONSTRUCTION (BID ID -1526421)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_748981.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
techbid.pdf
Tender Documents • 0.46 MB
BOQ_748981.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .