| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Finance | -1.00% | ₹1.6 L | L1 | Admitted-Finance |
| 2 | L2₹1.7 L+₹3,286.65 (2.02%)Admitted-Finance | +1.00% | ₹1.7 L+₹3,286.65 (2.02%) | L2 | Admitted-Finance |
| 3 | L3₹1.7 L+₹4,929.98 (3.03%)Admitted-Finance JEUR TALUKA KARMALA DISTRICT SOLAPUR | SOLAPUR | MAHARASHTRA | 413001 | +2.00% | ₹1.7 L+₹4,929.98 (3.03%) | L3 | Admitted-Finance |
Tender Value
₹1.6 L
Closing Date
23 Jul 2026, 1:00 pmClosed
Sarpanch Gramsevak Grampanchayat Pondhwadi
Grampanchayat Pondhwadi Tal Karmala Dist Solapur
Improvement Of Road From Haribhau Jagdale Wasti To Ramesh Jagadale Wasti At Pondhwadi
2026_SOLAP_1319151_1
E-Tender/2026-27/02
Open Tender
Civil Works - Others
Percentage
180 days
Pondhwadi
Please refer Tender documents.
2 documents required · 2 mandatory
₹100
Exempted
30 Jul 2026
17 Jul 2026
24 Jul 2026
17 Jul 2026
23 Jul 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour charges for removing grass, thorney shurbs, Jungli shurb, Kubabhul and alike grass along roadside making the ground clean by showel and phavaras, excetra complete. | 99 | Square Metre | 7 | ₹693 |
| 2 | Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. By Mechanical Means. | 180.18 | Cubic Metre | 119 | ₹21,441.42 |
| 3 | Providing earth work in embankment with approved materals obtained from departmental land upto lead of 50 metres including all lifts, laying in layers of 20 centimetre to 30 centimetre thickness, breaking clods, dressing to the required lines, curves, grade and section, watering and compaction with vibratory roller to achive not less than 97 percent of standard proctor density, excetra complete. (Material obtained from departmental Land) | 120.12 | Cubic Metre | 428.3 | ₹51,447.4 |
| 4 | Supplying hard murum / kankar at the road site, including conveying and stacking, excetra complete. | 54.6 | Cubic Metre | 638.3 | ₹34,851.18 |
| 5 | Spreading hard murum / soft murrum / gravel or kankar for side width, excetra complete. | 60.06 | Cubic Metre | 79 | ₹4,744.74 |
| 6 | Compacting the hard murum side widths including laying in layers on each side with vibratory roller including artificial watering, excetra complete. | 546 | Square Metre | 21 | ₹11,466 |
| 7 | Providing & fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion & liability period etc', having rectangular shape of 1.20m X 0.90m size made out 18 gauge (1.25mm) thick M.S. sheet painted with one coat of Zinc chromate stoving primer & two coats of enamel paint on front side & grey stove enamel on back side & border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 X 35 X 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm X 65 mm X 6 mm, 3.65 m long painted with alternate black & white bands of 25 cm width including all fixtures etc.and fixing boards in 1:4:8 concrete block of size 60 cm X 60 cm X 75 cm including, excavation, refilling, transportation, & labour etc complete. Spec. No. As directed by Engineer in Charge
Rate Abst No : NAME BOARD 2022-2023
Additional Specifications : The work shall be carried out as per the instructions of Engineer in-charge. | 1 | Number | 4,003.6 | ₹4,003.6 |
| 8 | Royalty charges for various building construction bonafied materials which are used for government bonafied works and for which Royalty charges are to be paid by the contractor. (This Item is to be paid to the contractor only after he pays the Royalty amount to Revenue department and produces the required voucher.) | 54.6 | Cubic Metre | 216.18 | ₹11,803.43 |
| 9.01 | Laboratory testing charges for various materials required for items of work, on the basis of testing frequency and charges fixed by Vigilence and Quality Control Circle, Pune.
Item / Page No : 4 / 0
Additional Specifications : 1. The amount of laboratory testing charges will be paid to contractor only after submission of the original receipt from the Vigillence and Quality Control Office with the name of work mensioned on it. 2. Above / below percentage quoted by the contractor will not be applicable for this item.Sieve Analysis Test for Hard Murrm
1 Test per 100.00 Cubic Metre | 1 | Number | 725 | ₹725 |
| 10 | Goods and Services Tax
Item / Page No : 15 / 0 | 1 | Job | 23,157 | ₹23,157 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
BOQ_2260832.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .