Loading…
Loading…
Tender Value
₹11.5 Cr
EMD Value
₹23.0 L
Closing Date
8 Jun 2026, 3:00 pmClosed
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
S AND T
13 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or " V" whichever is less; where V= Advertised value of the tender in crores of Rupees, N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer must have successfully or substantially completed any of the following during last 07(seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work costing not less than the amount equal to 60% of advertised value of the tender. Similar Nature of work for this tender is -"Any Telecom work involving provision of MIS/ LAN/ WAN / Helpline / UTS/ PRS/ FOIS/Value added enquiry system/ Video enquiry system/ Data connectivity/Datacom equipment/ video conferencing / wireless communication/secured communication/Wi-Fi / Telecom work involving computer-based enquiry system".
2 conditions
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Manuals for all supply items, containing technical specifications, features, pre-commissioning check list, installation knowhow, circuit diagram, parts list, test points, recommended testing value and troubleshooting documents shall be supplied by the contractor. If required, Necessary programming for any schedule of items for commissioning of that item, to be done by successful tenderer without any additional charge.
Provision of Railnet Infrastructure over Howrah Division.
SDSTE-RN-INFRA-HWH-26
SDSTE-RN-INFRA-HWH-26
Open
Works - General
12 Months
Howrah, West Bengal
₹0
₹23.0 L
8 Jun 2026
15 May 2026
25 May 2026
116 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 11,49,95,364.54 | ||
| — | 2133.00 | — | — | ||
| "Supply, Transportation at site and Installation of RCC cable route marker engraved and painted on both side along the route at every 30 meter and at route diversion. The fixing work is to be done as per extant practice of E. Rly. and as per Railway site supervisor. Inspection: RITES" | — | — | — | 8,89,461 | |
| — | 30.00 | — | — | ||
| """Supply, Installation, testing and commissioning of 48 Fiber (SC/APCSC/ APC) FDMS as per annexure. Inspection: RITES. " | — | — | — | 8,93,581.2 | |
| — | 30.00 | — | — | ||
| "Supply and installation of straight joint enclosures (SJC) complete with all accessories with latest amendment as per annexure. Inspection: RITES." | — | — | — | 5,53,603.2 | |
| — | 90.00 | — | — | ||
| Excavation of OFC pit for cable jointing of size 1.5m x 1.5m x 1.2 m for all type of soils. The section. Back filling the pit and ramming after jointing. Provision of brick walling the four walls and bottom of pit with RCC slab, back filling with earth and ramming as per drawing. N.B. all the materials including cement required for the above will be supplied by the tenderer. | — | — | — | 6,00,660 | |
| — | 350.00 | — | — | ||
| "Supply and Installation of 19"" rack mouted 24 port Fiber management system and termination of OFC and Splicing of all the Fibers inside the Terminal Box with provision of taking out OFC as required. This includes supply of all Installation accessories including the pigtails with connector as per order of practice for installation and commissioning of Optical Fiber System. Inspection: RITES." | — | — | — | 28,60,942 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
CheckListAnnexItoVIIIUPDATED_1.pdf
ATTACHMENT
AnnexureIX.pdf
ATTACHMENT
Annexure-X.pdf
ATTACHMENT
Annexure-XI_1.pdf
ATTACHMENT
AnnexureV.pdf
ATTACHMENT
Annexure-VA.pdf
ATTACHMENT
Annexure-VIA.pdf
ATTACHMENT
Annexure-VIB.pdf
ATTACHMENT
GCC-2022-Updated-25.09.24.pdf
ATTACHMENT
JPO-CABLEDIGGINGWORK-VICINITYOFUNDERGROUNDCABLE-SRDSTESRDEN-C-240124.pdf
ATTACHMENT
LabourCessAddendumCorrigendumslipno.4.pdf
ATTACHMENT
GCCwithCorrectionSlips1to10.pdf
ATTACHMENT
Updatedtenderdocument_RN.pdf
ATTACHMENT
TechnicalCircular119armouredpatchcord.pdf
ATTACHMENT
Telecompolicycircular108cablemarker.pdf
ATTACHMENT
TECHNICALCIRCULAR-124OFC.pdf
ATTACHMENT
RAILNETinfrastructureannexure.pdf
ATTACHMENT
TermsofPayment.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .